Strider Construction Co., Inc. submitted 69 bids on Washington State DOT contracts in the data, from 07 MAR 2001 to 01 FEB 2023, and was the low bidder on 14 of them (20%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $31,901,293
- Latest bid
- 01 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2001 | 1 | 0 | 0% |
| 2002 | 2 | 0 | 0% |
| 2003 | 2 | 0 | 0% |
| 2004 | 1 | 0 | 0% |
| 2005 | 2 | 0 | 0% |
| 2006 | 3 | 0 | 0% |
| 2007 | 4 | 2 | 50% |
| 2008 | 5 | 0 | 0% |
| 2009 | 3 | 0 | 0% |
| 2010 | 4 | 0 | 0% |
| 2011 | 9 | 2 | 22% |
| 2012 | 3 | 0 | 0% |
| 2013 | 6 | 0 | 0% |
| 2014 | 4 | 1 | 25% |
| 2015 | 5 | 1 | 20% |
| 2016 | 3 | 0 | 0% |
| 2017 | 5 | 2 | 40% |
| 2018 | 1 | 1 | 100% |
| 2019 | 1 | 1 | 100% |
| 2020 | 2 | 2 | 100% |
| 2021 | 2 | 2 | 100% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 45 | 5 | 11% |
| NCR region | 17 | 8 | 47% |
| SCR region | 4 | 1 | 25% |
| Region 9 | 1 | 0 | 0% |
| SWR region | 1 | 0 | 0% |
| Region 0 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Silt fence | LF | 25 | 15 (60%) | $3.00 | $4.50 | |
| High visibility fence | LF | 39 | 14 (36%) | $2.00 | $3.09 | |
| Clearing and grubbing | ACRE | 41 | 13 (32%) | $5,000.00 | $8,000.00 | |
| Flexible guide post | EACH | 38 | 12 (32%) | $35.50 | $33.23 | |
| Shoring or extra excavation class B | SF | 29 | 12 (41%) | $1.00 | $1.00 | |
| Plastic traffic arrow | EACH | 22 | 12 (55%) | $125.00 | $135.00 | |
| Temporary pavement marking | LF | 26 | 10 (38%) | $0.47 | $0.20 | |
| Paint line | LF | 46 | 9 (20%) | $0.50 | $0.25 | |
| Structure excavation class B including haul | CY | 28 | 8 (29%) | $7.75 | $15.00 | |
| Wattle | LF | 25 | 8 (32%) | $3.00 | $4.24 | |
| Removing paint line | LF | 24 | 8 (33%) | $0.90 | $0.70 | |
| Removing guardrail | LF | 27 | 7 (26%) | $5.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Interwest Construction, Inc. | 31 | 19 of 31 |
| Granite Construction Company | 23 | 9 of 23 |
| Colacurcio Brothers, Inc. | 19 | 6 of 19 |
| A-1 Landscaping and Constructi | 17 | 1 of 17 |
| Scarsella Bros., Inc. | 17 | 10 of 17 |
| Trimaxx Construction, Inc. | 17 | 8 of 17 |
| Imco General Construction, Inc | 13 | 6 of 13 |
| Ram Construction General | 13 | 9 of 13 |
| Wilder Construction Company | 12 | 9 of 12 |
| Tri-State Construction, Inc. | 11 | 7 of 11 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2023 | 009924 | NWR region | Sr 20 unnamed tributary to red creek fish passage | 3 of 7 | $3,323,277 | +10% |
| 10 FEB 2021 | 009643 | NWR region | Sr 20 fish creek & lorenzan creek fish passage | 1 of 8 | $2,737,770 | Low, 1.0% under the second |
| 03 FEB 2021 | 009639 | NCR region | Us 97a s of entiat site 3 rock slope scaling | 1 of 2 | $309,912 | Low, 57% under the second |
| 20 FEB 2020 | 009523 | NWR region | Sr 11 hoags creek fish passage | 1 of 6 | $868,883 | Low, 15% under the second |
| 08 JAN 2020 | 009511 | NCR region | Us 97a rock slope scaling | 1 of 2 | $660,265 | Low, 23% under the second |
| 27 MAR 2019 | 009399 | NCR region | Us 2 stevens pass avalanche deflection berm | 1 of 3 | $748,525 | Low, 13% under the second |
| 14 FEB 2018 | 009209 | NCR region | Us 97 swauk creek campground remove fish barrier | 1 of 3 | $4,314,133 | Low, 23% under the second |
| 13 DEC 2017 | 009172 | NWR region | Sr 542 sr 9 east junction intersection improvements | 4 of 8 | $1,123,020 | +13% |
| 15 MAR 2017 | 009042 | NWR region | Sr 542 hedrick creek fish barrier | 1 of 6 | $3,722,089 | Low, 2.0% under the second |
| 01 FEB 2017 | 009010 | NCR region | Sr 150 no-see-um road intersection improvements | 1 of 6 | $5,283,745 | Low, 12% under the second |
| 11 JAN 2017 | 009002 | NWR region | Sr 532 church creek fish passage | 2 of 11 | $3,732,622 | +2.0% |
| 05 JAN 2017 | 009004 | NWR region | Sr 542 hedrick creek fish barrier tree clearing | 5 of 11 | $59,003 | +46% |
| 14 DEC 2016 | 008990 | Region 0 | Blg i-5 silver lake sb rv dump station rehabilitation | 5 of 12 | $510,000 | +8.0% |
| 09 MAR 2016 | 008840 | NWR region | I-5 fisher creek - fish passage 15a013 (rev. 2/23/16) | 6 of 11 | $6,612,555 | +23% |
| 27 JAN 2016 | 008834 | SWR region | Us 97 and sr 14 rockfall projects for 2015 15x301 | 3 of 4 | $362,404 | +30% |
| 18 MAR 2015 | 008720 | NWR region | Sr 9 lake creek - fish passage 14a027 | 1 of 3 | $1,345,271 | Low, 12% under the second |
| 04 MAR 2015 | 008708 | NWR region | Mount vernon siding extension road improvements 14a007 | 4 of 14 | $170,860 | +9.0% |
| 04 MAR 2015 | 008717 | NCR region | Sr 281 / south of quincy at road 9 nw left turn lanes 15b007 | 2 of 4 | $426,299 | +4.0% |
| 14 JAN 2015 | 008701 | NCR region | Us 97a entiat pedestrian improvements 15b005 | 5 of 6 | $309,515 | +29% |
| 07 JAN 2015 | 008676 | NWR region | Sr 203 coe-clemons creek ced 14a009 | 6 of 10 | $2,088,963 | +18% |
| 30 APR 2014 | 008608 | NWR region | Sr 539 lynden aldergrove port of entry improvements 13a018 (rev. 4/11/2014) | 2 of 7 | $3,322,561 | +2.0% |
| 30 APR 2014 | 008617 | NWR region | Sr 530 slide - roadway clearing 14a016 (rev. 4/29/14) | 3 of 9 | $5,082,510 | +2.0% |
| 26 MAR 2014 | 008586 | SCR region | Sr 410 0.47 miles to 1.45 miles e of chinook pass - rock scaling 14y001 | 3 of 6 | $1,044,122 | +25% |
| 26 FEB 2014 | 008580 | SCR region | Sr 129 oregon state line vic to mp 11.35 vic - stabilize slopes 13y013 | 1 of 4 | $431,860 | Low, 26% under the second |
| 25 APR 2013 | 008458 | NCR region | Us 97 cameron lake road intersection improvements | 2 of 3 | $996,870 | +12% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.