Imco General Construction, Inc: WSDOT bid record
Imco General Construction, Inc submitted 37 bids on Washington State DOT contracts in the data, from 27 FEB 2002 to 08 MAR 2023, and was the low bidder on 5 of them (14%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $101,580,004
- Latest bid
- 08 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 2 | 0 | 0% |
| 2004 | 1 | 0 | 0% |
| 2006 | 1 | 1 | 100% |
| 2007 | 2 | 1 | 50% |
| 2008 | 3 | 1 | 33% |
| 2009 | 2 | 0 | 0% |
| 2010 | 2 | 0 | 0% |
| 2011 | 3 | 0 | 0% |
| 2013 | 3 | 0 | 0% |
| 2014 | 2 | 1 | 50% |
| 2016 | 2 | 0 | 0% |
| 2017 | 3 | 1 | 33% |
| 2018 | 3 | 0 | 0% |
| 2019 | 4 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 23 | 4 | 17% |
| SCR region | 6 | 1 | 17% |
| SWR region | 3 | 0 | 0% |
| ER region | 2 | 0 | 0% |
| OR region | 1 | 0 | 0% |
| Region 9 | 1 | 0 | 0% |
| NCR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Roadway excavation including haul | CY | 24 | 10 (42%) | $15.00 | $20.00 | |
| High visibility fence | LF | 22 | 9 (41%) | $2.75 | $3.09 | |
| Planing bituminous pavement | SY | 24 | 8 (33%) | $4.75 | $4.75 | |
| Paint line | LF | 28 | 6 (21%) | $0.45 | $0.25 | |
| Removing guardrail | LF | 19 | 6 (32%) | $7.00 | $5.00 | |
| Removing guardrail anchor | EACH | 16 | 6 (38%) | $230.00 | $215.00 | |
| Steel reinf. bar for bridge | LB | 11 | 6 (55%) | $1.00 | $1.00 | |
| Ditch excavation including haul | CY | 9 | 6 (67%) | $6.50 | $19.00 | |
| Construction signs class A | SF | 24 | 5 (21%) | $21.00 | $16.21 | |
| Flexible guide post | EACH | 24 | 5 (21%) | $42.50 | $33.23 | |
| Structure excavation class B including haul | CY | 20 | 5 (25%) | $12.62 | $15.00 | |
| Temporary impact attenuator | EACH | 16 | 5 (31%) | $3,500.00 | $4,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Strider Construction Co., Inc. | 13 | 7 of 13 |
| Scarsella Bros., Inc. | 10 | 5 of 10 |
| Interwest Construction, Inc. | 10 | 6 of 10 |
| Granite Construction Company | 10 | 4 of 10 |
| Cascade Bridge LLC | 6 | 3 of 6 |
| Wilder Construction Company | 6 | 1 of 6 |
| Colacurcio Brothers, Inc. | 6 | 4 of 6 |
| KLB Construction, Inc. | 5 | 2 of 5 |
| A-1 Landscaping and Constructi | 5 | 0 of 5 |
| Pacific Road & Bridge Co. | 4 | 2 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAR 2023 | 009937 | NWR region | Sr 542 squalicum crk to bellingham bay fish passage | 2 of 3 | $9,212,662 | +5.0% |
| 01 FEB 2023 | 009924 | NWR region | Sr 20 unnamed tributary to red creek fish passage | 5 of 7 | $3,334,737 | +10% |
| 25 JAN 2023 | 009910 | NWR region | I-5 sb joe leary slough to nulle rd vic concrete rehabilitation | 2 of 5 | $9,262,484 | +5.0% |
| 21 APR 2021 | 009672 | NWR region | Sr 546 kamm ditch fish passage | 3 of 6 | $919,114 | +11% |
| 24 APR 2019 | 009426 | ER region | Sr 21 w fork san poil bridge- replace structure | 3 of 4 | $6,459,505 | +14% |
| 17 APR 2019 | 009418 | SCR region | Sr 129 buford creek barrier fish passage | 2 of 3 | $3,664,000 | +12% |
| 13 MAR 2019 | 009385 | SCR region | I-90 bullfrog rd vic - concrete rehab, bridge deck rehab & painting | 3 of 5 | $16,342,838 | +10% |
| 06 MAR 2019 | 009380 | NWR region | Sr 9 tawes cr & two tributaries to tawes cr fish passage | 2 of 3 | $2,661,704 | +36% |
| 11 APR 2018 | 009251 | NWR region | Sr 524 great dane creek fish passage | 3 of 5 | $910,598 | +39% |
| 07 MAR 2018 | 009214 | SCR region | I-90 yakima river bridges cle elum to ellensburg eb & wb - deck rehab | 5 of 6 | $17,543,111 | +25% |
| 24 JAN 2018 | 009201 | SCR region | Sr 128 snake river red wolf bridge - deck rehabilitation | 5 of 6 | $2,087,581 | +63% |
| 15 MAR 2017 | 009036 | SCR region | I-90 468th ave se to w summit rd - concrete, deck, & culvert rehab | 1 of 6 | $27,799,359 | Low, 3.0% under the second |
| 25 JAN 2017 | 009011 | ER region | Us 395 nsc freya st - structures | 5 of 7 | $8,822,213 | +15% |
| 11 JAN 2017 | 009002 | NWR region | Sr 532 church creek fish passage | 5 of 11 | $4,373,909 | +19% |
| 30 MAR 2016 | 008865 | NWR region | Sr 202 little bear creek fish barrier removal 15a034 | 4 of 4 | $5,217,565 | +18% |
| 09 MAR 2016 | 008840 | NWR region | I-5 fisher creek - fish passage 15a013 (rev. 2/23/16) | 3 of 11 | $6,130,868 | +14% |
| 30 APR 2014 | 008608 | NWR region | Sr 539 lynden aldergrove port of entry improvements 13a018 (rev. 4/11/2014) | 5 of 7 | $3,848,010 | +18% |
| 30 APR 2014 | 008617 | NWR region | Sr 530 slide - roadway clearing 14a016 (rev. 4/29/14) | 1 of 9 | $4,959,924 | Low, 2.0% under the second |
| 18 DEC 2013 | 008559 | NWR region | I-5 s 272nd st vic to s rose st seismic retrofit 13a015 | 2 of 8 | $8,997,904 | +6.0% |
| 18 DEC 2013 | 008565 | NWR region | I-5 sr 18 i/c to s 288th st seismic retrofit 13a029 | 6 of 6 | $5,264,519 | +13% |
| 03 APR 2013 | 008423 | NWR region | Sr 20 skagit river - ced permanent restoration | 4 of 12 | $5,894,679 | +14% |
| 08 DEC 2011 | 008229 | NCR region | Us 2 stevens pass west slope stabilization | 6 of 6 | $7,107,449 | +54% |
| 09 MAR 2011 | 008089 | NWR region | Sr 548 terrell creek-fish passage | 6 of 14 | $813,875 | +21% |
| 02 MAR 2011 | 008088 | Region 9 | Seattle ferry terminal bicycle entry gate | 4 of 4 | $142,744 | +70% |
| 07 APR 2010 | 007903 | SWR region | I-5 blakeslee junction rr xing to grand mound i/c - add lane | 7 of 8 | $24,447,668 | +24% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.