Interwest Construction, Inc.: WSDOT bid record

Interwest Construction, Inc. submitted 81 bids on Washington State DOT contracts in the data, from 22 MAR 2006 to 26 AUG 2026, and was the low bidder on 23 of them (28%). When it was not low, its total sat a median +14% above the low bid.

Owner
Washington State DOT
Low bid volume
$72,012,565
Latest bid
26 AUG 2026
Data through
07 OCT 2026
81Bids
23Low bids
28Win rate, percent
+14%Median gap to the low bid when not low, 57 bids

By year

YearBidsLow bidsWin rate
2006100%
2007100%
20085120%
2009500%
20106350%
20118225%
20123133%
20137114%
2014500%
2015600%
20168450%
20177229%
201811100%
202011100%
20214125%
20225240%
20235240%
20263267%
Interwest Construction, Inc., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NWR region491327%
Region 99111%
OR region9444%
SCR region6233%
NCR region6350%
Region 0200%
Interwest Construction, Inc., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Crushed surfacing base courseTON6414 (22%)$29.25$26.44
Paint lineLF5412 (22%)$0.95$0.25
Erosion and sediment control leadDAY3512 (34%)$100.00$100.00
Roadway excavation including haulCY4511 (24%)$21.00$20.00
High visibility fenceLF4610 (22%)$3.00$3.09
Beam guardrail type 31 non-flared terminalEACH309 (30%)$3,000.00$2,700.00
Temporary pavement marking-short durationLF239 (39%)$1.50$0.40
Plastic drainage markingEACH368 (22%)$58.50$34.00
Removing guardrail anchorEACH268 (31%)$272.50$215.00
Streambed sedimentTON228 (36%)$40.00$45.00
Flexible guide postEACH407 (18%)$50.00$33.23
Removing guardrailLF307 (23%)$7.20$5.00
Interwest Construction, Inc., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Granite Construction Company328 of 32
Strider Construction Co., Inc.3112 of 31
Colacurcio Brothers, Inc.224 of 22
Trimaxx Construction, Inc.209 of 20
A-1 Landscaping and Constructi201 of 20
Scarsella Bros., Inc.1810 of 18
Ram Construction General147 of 14
Ceccanti, Inc.113 of 11
Boss Construction, Inc.114 of 11
Tiger Construction, LTD.115 of 11
Interwest Construction, Inc., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
26 AUG 2026XE3764SCR regionUs 12 Locust Ln Vicinity Emergency Washout Repair1 of 7$329,923Low, 9.0% under the second
15 JUL 2026XE3755SCR regionUs 12 Eschbach Rd & Ackley Rd/Clover Ln - I/S Safety Improvements1 of 5$1,717,172Low, 23% under the second
01 JUL 2026XE3756SCR regionI-90 Hansen Rd Overpass Emergency Bridge Replacement4 of 6$6,262,626+16%
12 APR 2023009945SCR regionSr 241 mabton vicinity retrofit bridges3 of 3$19,827,827+9.0%
08 MAR 2023009937NWR regionSr 542 squalicum crk to bellingham bay fish passage1 of 3$8,787,879Low, 5.0% under the second
01 FEB 2023009924NWR regionSr 20 unnamed tributary to red creek fish passage1 of 7$3,034,008Low, 7.0% under the second
25 JAN 2023009910NWR regionI-5 sb joe leary slough to nulle rd vic concrete rehabilitation3 of 5$9,285,571+6.0%
19 JAN 2023009891OR regionUs 101 elwha river bridge bridge replacement5 of 7$35,530,990+29%
06 APR 2022009789OR regionUs 101 may cr in vic of dowans cr rd ground anchor load testing1 of 3$891,587Low, 15% under the second
23 MAR 2022009783NWR regionI-5 northgate way & maple rd bridges seismic retrofit1 of 7$5,296,238Low, 6.0% under the second
16 MAR 202200000NWR regionSr 9 sr 204 intersection improvements demo #22 of 2$115,115+351%
16 MAR 2022009794OR regionSr112 jim creek west emergency repair5 of 5$1,533,345+51%
24 FEB 2022009769NWR regionSr 20 skagit river fish passage3 of 4$4,765,432+14%
21 APR 2021009681OR regionSr 112 w of jim creek landslides emergency repairs2 of 4$979,0850.0%
07 APR 2021009668NWR regionSr 538 logan creek fish passage1 of 5$1,619,452Low, 14% under the second
10 FEB 2021009643NWR regionSr 20 fish creek & lorenzan creek fish passage2 of 8$2,772,423+1.0%
06 JAN 2021009617Region 9Sr305 eagle harbor maintenance facility physical security infrastructure2 of 4$283,686+11%
20 FEB 2020009516OR regionUs 101 bagley and siebert creeks remove fish barriers1 of 8$21,885,061Low, 2.0% under the second
28 FEB 2018009215OR regionSr 112 olsen creek in vicinity of vista dr remove fish barrier1 of 4$1,681,910Low, 7.0% under the second
13 DEC 2017009177NWR regionSr20 sharpes corner vicinity improvements2 of 3$7,293,937+1.0%
13 DEC 2017009172NWR regionSr 542 sr 9 east junction intersection improvements7 of 8$1,175,128+19%
05 APR 2017009055OR regionSr 20 n of eaglemount half bridge culvert replacement1 of 3$396,396Low, 4.0% under the second
15 MAR 2017009041NCR regionSr 112 nordstrom creek remove fish barrier3 of 5$1,462,426+34%
15 FEB 2017009020NCR regionUs 101 matriotti creek remove fish barrier1 of 8$1,436,932Low, 26% under the second
11 JAN 2017009002NWR regionSr 532 church creek fish passage8 of 11$4,873,649+33%
Interwest Construction, Inc.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way