Interwest Construction, Inc.: WSDOT bid record
Interwest Construction, Inc. submitted 81 bids on Washington State DOT contracts in the data, from 22 MAR 2006 to 26 AUG 2026, and was the low bidder on 23 of them (28%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $72,012,565
- Latest bid
- 26 AUG 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2006 | 1 | 0 | 0% |
| 2007 | 1 | 0 | 0% |
| 2008 | 5 | 1 | 20% |
| 2009 | 5 | 0 | 0% |
| 2010 | 6 | 3 | 50% |
| 2011 | 8 | 2 | 25% |
| 2012 | 3 | 1 | 33% |
| 2013 | 7 | 1 | 14% |
| 2014 | 5 | 0 | 0% |
| 2015 | 6 | 0 | 0% |
| 2016 | 8 | 4 | 50% |
| 2017 | 7 | 2 | 29% |
| 2018 | 1 | 1 | 100% |
| 2020 | 1 | 1 | 100% |
| 2021 | 4 | 1 | 25% |
| 2022 | 5 | 2 | 40% |
| 2023 | 5 | 2 | 40% |
| 2026 | 3 | 2 | 67% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 49 | 13 | 27% |
| Region 9 | 9 | 1 | 11% |
| OR region | 9 | 4 | 44% |
| SCR region | 6 | 2 | 33% |
| NCR region | 6 | 3 | 50% |
| Region 0 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Crushed surfacing base course | TON | 64 | 14 (22%) | $29.25 | $26.44 | |
| Paint line | LF | 54 | 12 (22%) | $0.95 | $0.25 | |
| Erosion and sediment control lead | DAY | 35 | 12 (34%) | $100.00 | $100.00 | |
| Roadway excavation including haul | CY | 45 | 11 (24%) | $21.00 | $20.00 | |
| High visibility fence | LF | 46 | 10 (22%) | $3.00 | $3.09 | |
| Beam guardrail type 31 non-flared terminal | EACH | 30 | 9 (30%) | $3,000.00 | $2,700.00 | |
| Temporary pavement marking-short duration | LF | 23 | 9 (39%) | $1.50 | $0.40 | |
| Plastic drainage marking | EACH | 36 | 8 (22%) | $58.50 | $34.00 | |
| Removing guardrail anchor | EACH | 26 | 8 (31%) | $272.50 | $215.00 | |
| Streambed sediment | TON | 22 | 8 (36%) | $40.00 | $45.00 | |
| Flexible guide post | EACH | 40 | 7 (18%) | $50.00 | $33.23 | |
| Removing guardrail | LF | 30 | 7 (23%) | $7.20 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Granite Construction Company | 32 | 8 of 32 |
| Strider Construction Co., Inc. | 31 | 12 of 31 |
| Colacurcio Brothers, Inc. | 22 | 4 of 22 |
| Trimaxx Construction, Inc. | 20 | 9 of 20 |
| A-1 Landscaping and Constructi | 20 | 1 of 20 |
| Scarsella Bros., Inc. | 18 | 10 of 18 |
| Ram Construction General | 14 | 7 of 14 |
| Ceccanti, Inc. | 11 | 3 of 11 |
| Boss Construction, Inc. | 11 | 4 of 11 |
| Tiger Construction, LTD. | 11 | 5 of 11 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 1 of 7 | $329,923 | Low, 9.0% under the second |
| 15 JUL 2026 | XE3755 | SCR region | Us 12 Eschbach Rd & Ackley Rd/Clover Ln - I/S Safety Improvements | 1 of 5 | $1,717,172 | Low, 23% under the second |
| 01 JUL 2026 | XE3756 | SCR region | I-90 Hansen Rd Overpass Emergency Bridge Replacement | 4 of 6 | $6,262,626 | +16% |
| 12 APR 2023 | 009945 | SCR region | Sr 241 mabton vicinity retrofit bridges | 3 of 3 | $19,827,827 | +9.0% |
| 08 MAR 2023 | 009937 | NWR region | Sr 542 squalicum crk to bellingham bay fish passage | 1 of 3 | $8,787,879 | Low, 5.0% under the second |
| 01 FEB 2023 | 009924 | NWR region | Sr 20 unnamed tributary to red creek fish passage | 1 of 7 | $3,034,008 | Low, 7.0% under the second |
| 25 JAN 2023 | 009910 | NWR region | I-5 sb joe leary slough to nulle rd vic concrete rehabilitation | 3 of 5 | $9,285,571 | +6.0% |
| 19 JAN 2023 | 009891 | OR region | Us 101 elwha river bridge bridge replacement | 5 of 7 | $35,530,990 | +29% |
| 06 APR 2022 | 009789 | OR region | Us 101 may cr in vic of dowans cr rd ground anchor load testing | 1 of 3 | $891,587 | Low, 15% under the second |
| 23 MAR 2022 | 009783 | NWR region | I-5 northgate way & maple rd bridges seismic retrofit | 1 of 7 | $5,296,238 | Low, 6.0% under the second |
| 16 MAR 2022 | 00000 | NWR region | Sr 9 sr 204 intersection improvements demo #2 | 2 of 2 | $115,115 | +351% |
| 16 MAR 2022 | 009794 | OR region | Sr112 jim creek west emergency repair | 5 of 5 | $1,533,345 | +51% |
| 24 FEB 2022 | 009769 | NWR region | Sr 20 skagit river fish passage | 3 of 4 | $4,765,432 | +14% |
| 21 APR 2021 | 009681 | OR region | Sr 112 w of jim creek landslides emergency repairs | 2 of 4 | $979,085 | 0.0% |
| 07 APR 2021 | 009668 | NWR region | Sr 538 logan creek fish passage | 1 of 5 | $1,619,452 | Low, 14% under the second |
| 10 FEB 2021 | 009643 | NWR region | Sr 20 fish creek & lorenzan creek fish passage | 2 of 8 | $2,772,423 | +1.0% |
| 06 JAN 2021 | 009617 | Region 9 | Sr305 eagle harbor maintenance facility physical security infrastructure | 2 of 4 | $283,686 | +11% |
| 20 FEB 2020 | 009516 | OR region | Us 101 bagley and siebert creeks remove fish barriers | 1 of 8 | $21,885,061 | Low, 2.0% under the second |
| 28 FEB 2018 | 009215 | OR region | Sr 112 olsen creek in vicinity of vista dr remove fish barrier | 1 of 4 | $1,681,910 | Low, 7.0% under the second |
| 13 DEC 2017 | 009177 | NWR region | Sr20 sharpes corner vicinity improvements | 2 of 3 | $7,293,937 | +1.0% |
| 13 DEC 2017 | 009172 | NWR region | Sr 542 sr 9 east junction intersection improvements | 7 of 8 | $1,175,128 | +19% |
| 05 APR 2017 | 009055 | OR region | Sr 20 n of eaglemount half bridge culvert replacement | 1 of 3 | $396,396 | Low, 4.0% under the second |
| 15 MAR 2017 | 009041 | NCR region | Sr 112 nordstrom creek remove fish barrier | 3 of 5 | $1,462,426 | +34% |
| 15 FEB 2017 | 009020 | NCR region | Us 101 matriotti creek remove fish barrier | 1 of 8 | $1,436,932 | Low, 26% under the second |
| 11 JAN 2017 | 009002 | NWR region | Sr 532 church creek fish passage | 8 of 11 | $4,873,649 | +33% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.