Ceccanti, Inc.: WSDOT bid record
Ceccanti, Inc. submitted 46 bids on Washington State DOT contracts in the data, from 31 JAN 2001 to 12 AUG 2026, and was the low bidder on 2 of them (4%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $32,294,650
- Latest bid
- 12 AUG 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2001 | 2 | 0 | 0% |
| 2003 | 1 | 0 | 0% |
| 2004 | 2 | 0 | 0% |
| 2009 | 6 | 0 | 0% |
| 2010 | 3 | 0 | 0% |
| 2011 | 1 | 0 | 0% |
| 2012 | 2 | 0 | 0% |
| 2013 | 6 | 1 | 17% |
| 2014 | 1 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 7 | 0 | 0% |
| 2017 | 1 | 0 | 0% |
| 2018 | 3 | 0 | 0% |
| 2019 | 3 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2026 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 18 | 1 | 6% |
| NWR region | 17 | 1 | 6% |
| SCR region | 4 | 0 | 0% |
| SWR region | 3 | 0 | 0% |
| NCR region | 3 | 0 | 0% |
| Region 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 26 | 18 (69%) | $12.50 | $100.00 | |
| Sequential arrow sign | HR | 16 | 15 (94%) | $2.00 | $3.50 | |
| Construction signs class A | SF | 23 | 11 (48%) | $16.00 | $16.21 | |
| Street cleaning | HR | 16 | 11 (69%) | $95.00 | $115.00 | |
| Paint line | LF | 28 | 10 (36%) | $0.60 | $0.25 | |
| Plastic traffic arrow | EACH | 19 | 10 (53%) | $160.00 | $135.00 | |
| Seeding, fertilizing, and mulching | ACRE | 16 | 10 (63%) | $2,700.00 | $2,750.00 | |
| Plastic drainage marking | EACH | 24 | 9 (38%) | $57.50 | $34.00 | |
| High visibility fence | LF | 23 | 9 (39%) | $2.00 | $3.09 | |
| Shoring or extra excavation class B | SF | 18 | 9 (50%) | $1.00 | $1.00 | |
| Inlet protection | EACH | 27 | 8 (30%) | $80.00 | $95.00 | |
| Embankment compaction | CY | 16 | 8 (50%) | $3.50 | $3.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scarsella Bros., Inc. | 22 | 19 of 22 |
| Quigg Bros., Inc. | 14 | 11 of 14 |
| Granite Construction Company | 13 | 4 of 13 |
| Tri-State Construction, Inc. | 13 | 11 of 13 |
| Tucci & Sons, Inc. | 12 | 7 of 12 |
| Interwest Construction, Inc. | 11 | 8 of 11 |
| Active Construction, Inc. | 11 | 5 of 11 |
| Midmountain Contractors, Inc. | 9 | 3 of 9 |
| C.A. Carey Corporation | 9 | 7 of 9 |
| Rognlin'S, Inc. | 8 | 7 of 8 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 AUG 2026 | XE3760 | SCR region | I-90 Eb 3 Miles E Of North Bend - Emergency Seeding And Erosion Control | 5 of 5 | $496,084 | +112% |
| 01 JUL 2026 | XE3756 | SCR region | I-90 Hansen Rd Overpass Emergency Bridge Replacement | 6 of 6 | $8,339,495 | +54% |
| 19 JAN 2023 | 009891 | OR region | Us 101 elwha river bridge bridge replacement | 1 of 7 | $27,649,814 | Low, 7.0% under the second |
| 06 APR 2022 | 009795 | SWR region | Sr 506 1.5 miles n of frontage rd to i-5 emergency bridge repair | 5 of 8 | $1,061,573 | +28% |
| 03 MAR 2021 | 009654 | NWR region | I-90 coal mine wall vic to soderman cr vic stormwater retrofit | 2 of 5 | $384,460 | +6.0% |
| 20 FEB 2020 | 009516 | OR region | Us 101 bagley and siebert creeks remove fish barriers | 4 of 8 | $27,626,093 | +26% |
| 05 FEB 2020 | 009501 | NWR region | Sr 522 i-5 to 61st ave ne paving & ada compliance | 3 of 5 | $12,787,026 | +15% |
| 27 MAR 2019 | 009398 | OR region | Us 101 west jefferson county remove fish barriers | 7 of 7 | $24,100,743 | +55% |
| 24 JAN 2019 | 009360 | OR region | Sr 107 chehalis river bridge structural rehabilitation & painting | 5 of 10 | $20,614,851 | +6.0% |
| 09 JAN 2019 | 009357 | NWR region | Sr 509 & sr 518 s 192 st to normandy pk & sr 509 to sr 99 paving & ada & deck & seismic | 3 of 6 | $10,365,283 | +15% |
| 11 APR 2018 | 009245 | NWR region | I-405 sr 167 interchange catch basins - drainage repair | 5 of 5 | $1,594,014 | +48% |
| 22 FEB 2018 | 009211 | OR region | Us 12 unnamed tributary to wynoochee river remove fish barrier | 4 of 6 | $3,617,136 | +36% |
| 07 JAN 2018 | 009197 | SWR region | Sr 508 s. fork newaukum river bridge replacement | 9 of 10 | $5,886,294 | +17% |
| 15 FEB 2017 | 009020 | NCR region | Us 101 matriotti creek remove fish barrier | 8 of 8 | $2,783,160 | +94% |
| 21 DEC 2016 | 008993 | OR region | I-5 mounts rd to center dr auxiliary lane extension | 4 of 9 | $8,326,343 | +6.0% |
| 13 APR 2016 | 008869 | OR region | Sr 161 south creek remove fish barrier 14c508 | 5 of 5 | $891,560 | +27% |
| 30 MAR 2016 | 008847 | NWR region | Sr 520 union bay natural area west approach wetland mitigation 15a801 | 5 of 6 | $5,723,332 | +31% |
| 23 MAR 2016 | 008861 | OR region | Sr 16 anderson creek trib to sinclair inlet - fish barrier removal 15c522 | 2 of 7 | $4,625,398 | +6.0% |
| 16 MAR 2016 | 008853 | OR region | Sr 121 blooms ditch remove fish barriers 14c515 | 6 of 10 | $1,577,358 | +13% |
| 10 FEB 2016 | 008839 | NCR region | Sr 112 jansen creek remove fish barrier 16b001 | 6 of 6 | $2,295,499 | +55% |
| 13 JAN 2016 | 008831 | NWR region | Sr 532 pilchuck creek tributary (secret creek) fish barrier xl3750 | 10 of 10 | $3,683,096 | +92% |
| 14 JAN 2015 | 008698 | NWR region | Sr 99 w fork hylebos creek fish passage 14a020 | 4 of 10 | $1,556,372 | +17% |
| 03 DEC 2014 | 008685 | OR region | Sr 162 puyallup river bridge bridge replacement 13c521 | 13 of 15 | $6,340,374 | +16% |
| 18 DEC 2013 | 008559 | NWR region | I-5 s 272nd st vic to s rose st seismic retrofit 13a015 | 4 of 8 | $9,768,140 | +15% |
| 18 DEC 2013 | 008565 | NWR region | I-5 sr 18 i/c to s 288th st seismic retrofit 13a029 | 1 of 6 | $4,644,837 | Low, 1.0% under the second |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.