Granite Construction Company: WSDOT bid record
Granite Construction Company submitted 267 bids on Washington State DOT contracts in the data, from 02 DEC 2009 to 23 SEP 2026, and was the low bidder on 60 of them (22%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $185,456,616
- Latest bid
- 23 SEP 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2009 | 3 | 0 | 0% |
| 2010 | 14 | 2 | 14% |
| 2011 | 16 | 2 | 13% |
| 2012 | 9 | 2 | 22% |
| 2013 | 24 | 8 | 33% |
| 2014 | 15 | 7 | 47% |
| 2015 | 19 | 4 | 21% |
| 2016 | 27 | 6 | 22% |
| 2017 | 28 | 3 | 11% |
| 2018 | 29 | 7 | 24% |
| 2019 | 23 | 8 | 35% |
| 2020 | 12 | 2 | 17% |
| 2021 | 12 | 2 | 17% |
| 2022 | 14 | 4 | 29% |
| 2023 | 16 | 3 | 19% |
| 2026 | 6 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 98 | 25 | 26% |
| SCR region | 48 | 6 | 13% |
| OR region | 43 | 10 | 23% |
| NCR region | 33 | 10 | 30% |
| SWR region | 25 | 8 | 32% |
| ER region | 13 | 0 | 0% |
| Region 9 | 6 | 1 | 17% |
| Region 0 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 126 | 78 (62%) | $50.00 | $100.00 | |
| Planing bituminous pavement | SY | 203 | 74 (36%) | $3.75 | $4.75 | |
| Paint line | LF | 183 | 74 (40%) | $0.25 | $0.25 | |
| Flexible guide post | EACH | 183 | 64 (35%) | $45.00 | $33.23 | |
| Plastic traffic arrow | EACH | 160 | 63 (39%) | $200.00 | $135.00 | |
| Pavement repair excavation including haul | SY | 140 | 57 (41%) | $26.50 | $22.00 | |
| Plastic wide lane line | LF | 122 | 55 (45%) | $3.00 | $3.23 | |
| Plastic stop line | LF | 132 | 48 (36%) | $12.00 | $10.00 | |
| Temporary pavement marking-short duration | LF | 136 | 47 (35%) | $0.30 | $0.40 | |
| Plastic crosswalk line | SF | 92 | 42 (46%) | $7.25 | $6.00 | |
| Plastic drainage marking | EACH | 114 | 41 (36%) | $47.00 | $34.00 | |
| Portable changeable message sign | HR | 103 | 41 (40%) | $7.00 | $5.12 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lakeside Industries, Inc. | 59 | 30 of 59 |
| Central Washington Asphalt, In | 57 | 45 of 57 |
| Interwest Construction, Inc. | 32 | 24 of 32 |
| Strider Construction Co., Inc. | 23 | 14 of 23 |
| Scarsella Bros., Inc. | 22 | 19 of 22 |
| Colacurcio Brothers, Inc. | 20 | 8 of 20 |
| Central Washington Asphalt, I | 20 | 10 of 20 |
| Doolittle Construction, LLC | 19 | 10 of 19 |
| Poe Asphalt Paving, Inc. | 18 | 12 of 18 |
| Midmountain Contractors, Inc. | 17 | 13 of 17 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 8 of 8 | $2,613,566 | +110% |
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 7 of 7 | $580,672 | +76% |
| 15 JUL 2026 | XE3755 | SCR region | Us 12 Eschbach Rd & Ackley Rd/Clover Ln - I/S Safety Improvements | 4 of 5 | $2,181,978 | +27% |
| 08 JUL 2026 | XE3751 | SCR region | Us 395 Kartchner St I/C Nb Ramp Terminal Improvements | 3 of 4 | $1,161,539 | +6.0% |
| 01 JUL 2026 | XE3749 | SCR region | Sr 240 Beloit Road To Hagen Rd Pavement Repairs | 2 of 3 | $581,784 | +45% |
| 01 JUL 2026 | XE3756 | SCR region | I-90 Hansen Rd Overpass Emergency Bridge Replacement | 5 of 6 | $7,576,200 | +40% |
| 19 APR 2023 | 009952 | SCR region | Us 97 jones rd - intersection improvements | 2 of 4 | $3,896,703 | 0.0% |
| 29 MAR 2023 | 009954 | NWR region | Sr 530 montague creek bridge to seeman st vic paving | 1 of 2 | $5,629,677 | Low, 7.0% under the second |
| 08 MAR 2023 | 009937 | NWR region | Sr 542 squalicum crk to bellingham bay fish passage | 3 of 3 | $10,276,630 | +17% |
| 01 MAR 2023 | 009935 | NWR region | Sr 539 duffner ditch fish passage | 5 of 5 | $4,745,332 | +74% |
| 01 MAR 2023 | 009938 | ER region | I-90 ritzville to tokio paving | 3 of 3 | $14,937,363 | +33% |
| 23 FEB 2023 | 009932 | NWR region | Sr 530 59th ave ne & 211th pl ne intersection improvements | 3 of 4 | $1,993,340 | +21% |
| 23 FEB 2023 | 009939 | Region 9 | Sr 525 clinton ferry terminal paving preservation | 3 of 3 | $1,327,030 | +38% |
| 23 FEB 2023 | 009934 | NCR region | Us 2 & us 97 leavenworth & n of blewett pass paving | 3 of 3 | $11,930,371 | +22% |
| 01 FEB 2023 | 009916 | NWR region | Sr 9 sr 528 to 132nd st ne vic paving with exceptions | 1 of 2 | $2,502,440 | Low, 17% under the second |
| 01 FEB 2023 | 009924 | NWR region | Sr 20 unnamed tributary to red creek fish passage | 4 of 7 | $3,332,889 | +10% |
| 01 FEB 2023 | 009921 | NCR region | Us 2 / 97 easy street roundabout | 4 of 4 | $7,505,311 | +38% |
| 25 JAN 2023 | 009910 | NWR region | I-5 sb joe leary slough to nulle rd vic concrete rehabilitation | 5 of 5 | $11,703,486 | +33% |
| 25 JAN 2023 | 009926 | OR region | Sr 109 w of hoquiam stabilize slope | 8 of 8 | $848,104 | +173% |
| 19 JAN 2023 | 009912 | NWR region | Us 2 et al northwest region hma crack seal and pavement repair | 1 of 3 | $2,166,312 | Low, 20% under the second |
| 11 JAN 2023 | 009903 | SWR region | Sr 433 lewis and clark bridge expansion joint replacement | 4 of 5 | $1,496,924 | +56% |
| 11 JAN 2023 | 009909 | SWR region | Sr 500 ne fourth plain blvd, 162nd-166th ave safe route to school | 4 of 4 | $1,385,385 | +45% |
| 13 APR 2022 | 009796 | NWR region | Sr 20 rocky creek to granite creek bst | 1 of 2 | $8,305,491 | Low, 44% under the second |
| 06 APR 2022 | 009787 | SWR region | Sr 142 lyle to little klickitat river br chip seal | 3 of 3 | $3,423,990 | +14% |
| 30 MAR 2022 | 009778 | NCR region | Sr 17 et al ncr seal 2022 | 2 of 3 | $5,366,799 | +8.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.