Lakeside Industries, Inc.: WSDOT bid record
Lakeside Industries, Inc. submitted 164 bids on Washington State DOT contracts in the data, from 24 FEB 2000 to 07 OCT 2026, and was the low bidder on 60 of them (37%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $137,695,872
- Latest bid
- 07 OCT 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 7 | 3 | 43% |
| 2001 | 7 | 3 | 43% |
| 2002 | 6 | 5 | 83% |
| 2003 | 5 | 1 | 20% |
| 2004 | 6 | 1 | 17% |
| 2005 | 11 | 3 | 27% |
| 2006 | 5 | 0 | 0% |
| 2007 | 7 | 1 | 14% |
| 2008 | 5 | 1 | 20% |
| 2009 | 5 | 1 | 20% |
| 2010 | 8 | 1 | 13% |
| 2011 | 8 | 6 | 75% |
| 2012 | 3 | 1 | 33% |
| 2013 | 5 | 2 | 40% |
| 2014 | 3 | 0 | 0% |
| 2015 | 13 | 5 | 38% |
| 2016 | 12 | 4 | 33% |
| 2017 | 13 | 8 | 62% |
| 2018 | 13 | 6 | 46% |
| 2019 | 11 | 3 | 27% |
| 2021 | 2 | 1 | 50% |
| 2022 | 5 | 2 | 40% |
| 2023 | 3 | 1 | 33% |
| 2026 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 95 | 30 | 32% |
| OR region | 46 | 19 | 41% |
| SWR region | 15 | 6 | 40% |
| Region 9 | 5 | 5 | 100% |
| SCR region | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Plastic traffic arrow | EACH | 115 | 53 (46%) | $140.00 | $135.00 | |
| Paint line | LF | 100 | 53 (53%) | $0.18 | $0.25 | |
| Plastic drainage marking | EACH | 109 | 51 (47%) | $30.00 | $34.00 | |
| Plastic stop line | LF | 107 | 51 (48%) | $9.50 | $10.00 | |
| Planing bituminous pavement | SY | 133 | 49 (37%) | $3.15 | $4.75 | |
| Raised pavement marker type 2 | HUND | 98 | 44 (45%) | $385.00 | $478.00 | |
| Pavement repair excavation including haul | SY | 118 | 43 (36%) | $30.00 | $22.00 | |
| Inlet protection | EACH | 109 | 42 (39%) | $95.00 | $95.00 | |
| Flexible guide post | EACH | 102 | 38 (37%) | $38.75 | $33.23 | |
| Crushed surfacing base course | TON | 88 | 38 (43%) | $40.00 | $26.44 | |
| Plastic crosswalk line | SF | 81 | 38 (47%) | $6.05 | $6.00 | |
| Construction signs class A | SF | 85 | 37 (44%) | $20.00 | $16.21 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Granite Construction Company | 59 | 29 of 59 |
| Tucci & Sons, Inc. | 39 | 32 of 39 |
| Watson Asphalt Paving Company, | 34 | 13 of 34 |
| Wilder Construction Company | 30 | 21 of 30 |
| Miles Resources, LLC | 20 | 13 of 20 |
| Woodworth & Company, Inc | 16 | 10 of 16 |
| Rinker Materials West, LLC DBA | 15 | 11 of 15 |
| Icon Materials DBA CPM Develop | 13 | 6 of 13 |
| Cemex Construction Materials | 12 | 6 of 12 |
| CPM Development Corporation | 9 | 5 of 9 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | XE3773 | OR region | Sr 20 Us 101 I/S To N Of Fairmount Rd Hfst | 1 of 6 | $355,249 | Low, 17% under the second |
| 29 MAR 2023 | 009954 | NWR region | Sr 530 montague creek bridge to seeman st vic paving | 2 of 2 | $6,024,170 | +7.0% |
| 23 FEB 2023 | 009939 | Region 9 | Sr 525 clinton ferry terminal paving preservation | 1 of 3 | $959,695 | Low, 12% under the second |
| 01 FEB 2023 | 009916 | NWR region | Sr 9 sr 528 to 132nd st ne vic paving with exceptions | 2 of 2 | $2,937,742 | +17% |
| 13 APR 2022 | 009781 | NWR region | Sr 18 & sr 99 & sr 516 jenkins ck vic & tukwila vic & sr 181 vic paving & deck rehab & ada | 2 of 4 | $9,608,262 | +9.0% |
| 13 APR 2022 | 009796 | NWR region | Sr 20 rocky creek to granite creek bst | 2 of 2 | $11,937,003 | +44% |
| 16 MAR 2022 | 009782 | Region 9 | Sr 104 edmonds ferry terminal paving preservation | 1 of 2 | $357,600 | Low, 1.0% under the second |
| 02 MAR 2022 | 009772 | OR region | Us 101 delphi rd to i-5 paving and concrete barrier | 3 of 3 | $1,975,536 | +23% |
| 26 JAN 2022 | 009755 | NWR region | I-405 & sr 92 sr 520 vic i-5 vic & sr 9 vic paving & ada compliance | 1 of 2 | $10,424,975 | Low, 5.0% under the second |
| 18 FEB 2021 | 009650 | NWR region | Sr 202 snoqualmie falls pk to boalch ave nw paving & ada | 1 of 2 | $2,048,650 | Low, 54% under the second |
| 27 JAN 2021 | 009630 | OR region | Sr 300 belfair state park to sr 3 paving | 3 of 3 | $1,131,296 | +19% |
| 03 APR 2019 | 009411 | OR region | Sr 8 us 12 to w of wilson rd paving | 2 of 3 | $3,777,629 | +7.0% |
| 13 MAR 2019 | 009384 | OR region | I-5 plum st to s tacoma way paving | 3 of 3 | $2,709,325 | +21% |
| 06 MAR 2019 | 009397 | NWR region | Sr 99 pierce county line to s 359th st vic paving | 3 of 4 | $1,042,701 | +20% |
| 06 MAR 2019 | 009393 | Region 9 | Sr20 spur anacortes ferry terminal parking lot and slip 1 paving | 1 of 2 | $391,684 | Low, 32% under the second |
| 27 FEB 2019 | 009394 | SWR region | Sr 14 se 164th ave to nw 6th ave paving | 2 of 2 | $2,314,314 | +6.0% |
| 21 FEB 2019 | 009378 | NWR region | Sr 522 north creek bridge to sr 9 vic paving | 1 of 3 | $4,081,627 | Low, 10% under the second |
| 30 JAN 2019 | 009373 | OR region | Sr 507 n of rainier to jct sr 7 paving | 4 of 4 | $3,058,844 | +31% |
| 24 JAN 2019 | 009363 | NWR region | Us 2 & sr 9 bickford ave to gold bar paving & joints & improvements & ada | 2 of 2 | $12,290,130 | +4.0% |
| 16 JAN 2019 | 009371 | OR region | Kitsap area paving and ada compliance - 2019 | 3 of 4 | $7,387,940 | +29% |
| 16 JAN 2019 | 009364 | OR region | Us 101 old gardiner rd to n of w uncas rd paving and bridge deck repair | 1 of 2 | $1,373,143 | Low, 2.0% under the second |
| 09 JAN 2019 | 009362 | NWR region | Sr 542 i-5 to britton road paving & ada compliance | 2 of 2 | $5,565,132 | +18% |
| 11 APR 2018 | 009250 | SCR region | Us 12/fs rd 1284 to white pass & sr 123/ us 12 to lewis county line – paving | 4 of 4 | $1,946,274 | +48% |
| 04 APR 2018 | 009239 | NWR region | Sr 99 & sr 509 s cloverdale st to duwamish river paving and ada compliance | 3 of 3 | $7,769,070 | +64% |
| 04 APR 2018 | 009230 | OR region | Sr 167 milwaukee ave to s of pierce co line - paving | 4 of 4 | $2,512,842 | +91% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.