Miles Resources, LLC: WSDOT bid record
Miles Resources, LLC submitted 26 bids on Washington State DOT contracts in the data, from 19 MAR 2014 to 07 OCT 2026, and was the low bidder on 4 of them (15%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $6,613,375
- Latest bid
- 07 OCT 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2014 | 1 | 0 | 0% |
| 2015 | 5 | 0 | 0% |
| 2016 | 4 | 1 | 25% |
| 2017 | 4 | 2 | 50% |
| 2018 | 3 | 0 | 0% |
| 2019 | 3 | 1 | 33% |
| 2021 | 1 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 15 | 3 | 20% |
| NWR region | 11 | 1 | 9% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary pavement marking-short duration | LF | 24 | 7 (29%) | $0.25 | $0.40 | |
| Plastic drainage marking | EACH | 21 | 6 (29%) | $40.00 | $34.00 | |
| Plastic crosswalk line | SF | 18 | 6 (33%) | $7.78 | $6.00 | |
| Paint line | LF | 15 | 6 (40%) | $0.20 | $0.25 | |
| Crushed surfacing base course | TON | 14 | 6 (43%) | $44.50 | $26.44 | |
| Planing bituminous pavement | SY | 25 | 5 (20%) | $3.30 | $4.75 | |
| Inlet protection | EACH | 24 | 5 (21%) | $93.00 | $95.00 | |
| Plastic line | LF | 12 | 5 (42%) | $2.25 | $1.51 | |
| Adjust monument case and cover | EACH | 9 | 5 (56%) | $500.00 | $317.26 | |
| Pavement repair excavation including haul | SY | 23 | 4 (17%) | $50.00 | $22.00 | |
| Plastic stop line | LF | 22 | 4 (18%) | $13.00 | $10.00 | |
| Plastic traffic arrow | EACH | 21 | 4 (19%) | $195.00 | $135.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tucci & Sons, Inc. | 23 | 20 of 23 |
| Lakeside Industries, Inc. | 20 | 7 of 20 |
| CPM Development Corporation | 9 | 4 of 9 |
| Granite Construction Company | 6 | 2 of 6 |
| Icon Materials DBA CPM Develop | 5 | 3 of 5 |
| Active Construction, Inc. | 4 | 2 of 4 |
| Puget Paving and Construction, Inc. | 3 | 2 of 3 |
| Watson Asphalt Paving Company, | 2 | 0 of 2 |
| Johansen Construction Company, | 2 | 2 of 2 |
| Combined Construction, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | XE3773 | OR region | Sr 20 Us 101 I/S To N Of Fairmount Rd Hfst | 6 of 6 | $42,121,123 | +11757% |
| 29 MAR 2023 | 009941 | OR region | Sr 166 bay st./bethel ave./maple ave. intersection - roundabout | 3 of 6 | $1,539,087 | +6.0% |
| 01 FEB 2023 | 009928 | OR region | Sr 7 unnamed tribs to s creek remove fish barriers & paving | 4 of 4 | $6,518,048 | +23% |
| 13 APR 2022 | 009781 | NWR region | Sr 18 & sr 99 & sr 516 jenkins ck vic & tukwila vic & sr 181 vic paving & deck rehab & ada | 3 of 4 | $9,898,922 | +13% |
| 23 MAR 2022 | 009771 | OR region | Sr 7 sr 507 to s of s 38th st paving | 2 of 3 | $1,666,202 | +3.0% |
| 27 JAN 2021 | 009630 | OR region | Sr 300 belfair state park to sr 3 paving | 2 of 3 | $965,443 | +2.0% |
| 06 MAR 2019 | 009397 | NWR region | Sr 99 pierce county line to s 359th st vic paving | 2 of 4 | $980,596 | +13% |
| 30 JAN 2019 | 009373 | OR region | Sr 507 n of rainier to jct sr 7 paving | 1 of 4 | $2,343,074 | Low, 19% under the second |
| 16 JAN 2019 | 009371 | OR region | Kitsap area paving and ada compliance - 2019 | 2 of 4 | $6,607,047 | +16% |
| 04 APR 2018 | 009230 | OR region | Sr 167 milwaukee ave to s of pierce co line - paving | 2 of 4 | $1,373,494 | +4.0% |
| 22 FEB 2018 | 009212 | NWR region | Sr 18 et al wb w valley hwy vic to se 231st st paving & ada compliance | 4 of 4 | $8,780,120 | +32% |
| 14 FEB 2018 | 009182 | NWR region | Sr 164 sr 18 to 17th st se paving and ada compliance | 5 of 5 | $3,534,724 | +49% |
| 12 APR 2017 | 009056 | OR region | Sr 162 sr 410 to s of 96th st e paving and ada compliance | 3 of 3 | $1,842,985 | +29% |
| 23 FEB 2017 | 009027 | NWR region | Sr 516 102nd pl se vic to 132nd ave se paving and ada compliance | 1 of 3 | $2,465,697 | Low, 3.0% under the second |
| 23 FEB 2017 | 009021 | OR region | I-5 n of maytown rd to martin way paving | 3 of 4 | $4,353,353 | +8.0% |
| 05 JAN 2017 | 009000 | OR region | Sr 167 sw of grandview ave to w of 87th ave e - paving | 1 of 4 | $749,207 | Low, 6.0% under the second |
| 21 DEC 2016 | 008994 | NWR region | Sr 410 white river bridge to sr 164 paving & ada compliance | 3 of 4 | $1,993,581 | +35% |
| 21 DEC 2016 | 008993 | OR region | I-5 mounts rd to center dr auxiliary lane extension | 7 of 9 | $9,919,211 | +26% |
| 30 MAR 2016 | 008862 | OR region | Sr 507 and sr 510 golphnee lp se to 295th st s paving 15c510 | 1 of 4 | $1,055,397 | Low, 1.0% under the second |
| 23 MAR 2016 | 008854 | NWR region | Sr 18 and sr 167 eb w valley to c st sw & nb s 212th st to s 43rd st-paving 15a017 | 3 of 4 | $2,199,758 | +18% |
| 29 APR 2015 | 008739 | NWR region | Sr 164 hemlock st to se 408th st paving and ada compliance 14a030 (rev. 3/20/2015) | 3 of 3 | $3,854,605 | +38% |
| 22 APR 2015 | 008742 | OR region | Sr 507 old hwy 99 to e of water st paving 13c523 | 3 of 4 | $2,583,671 | +3.0% |
| 08 APR 2015 | 008733 | NWR region | Sr 518 wb 24th ave s vic to i-5 i/c vic paving 14a034 | 2 of 3 | $1,997,901 | +26% |
| 11 MAR 2015 | 008718 | NWR region | Sr 167 nb s 277th st to green river bridge paving 14a035 | 3 of 5 | $566,389 | +21% |
| 07 JAN 2015 | 008696 | NWR region | Sr 181 s 180th st to southcenter blvd paving & ada compliance 14a010 | 4 of 6 | $1,653,171 | +4.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.