Combined Construction, Inc.: WSDOT bid record
Combined Construction, Inc. submitted 18 bids on Washington State DOT contracts in the data, from 18 APR 2018 to 07 OCT 2026, and was the low bidder on 4 of them (22%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $13,035,561
- Latest bid
- 07 OCT 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 1 | 50% |
| 2019 | 2 | 1 | 50% |
| 2020 | 2 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2022 | 4 | 0 | 0% |
| 2023 | 4 | 2 | 50% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 5 | 1 | 20% |
| NWR region | 4 | 1 | 25% |
| NCR region | 3 | 1 | 33% |
| SWR region | 2 | 0 | 0% |
| SCR region | 2 | 1 | 50% |
| Region 9 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection | EACH | 7 | 1 (14%) | $350.00 | $95.00 | |
| Crushed surfacing base course | TON | 5 | 1 (20%) | $235.00 | $26.44 | |
| Planing bituminous pavement | SY | 5 | 1 (20%) | $25.00 | $4.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M.J. Hughes Construction, Inc. | 8 | 3 of 8 |
| Massana Construction, Inc. | 7 | 5 of 7 |
| Hamilton Construction Co. | 4 | 3 of 4 |
| Granite Construction Company | 4 | 1 of 4 |
| Lakeside Industries, Inc. | 2 | 2 of 2 |
| C.A. Carey Corporation | 2 | 1 of 2 |
| Graham Contracting, LTD. | 2 | 1 of 2 |
| Walsh Construction Co II LLC | 2 | 0 of 2 |
| Conway Construction Company | 2 | 0 of 2 |
| Cascade Bridge LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | XE3773 | OR region | Sr 20 Us 101 I/S To N Of Fairmount Rd Hfst | 3 of 6 | $487,181 | +37% |
| 05 APR 2023 | 009948 | SCR region | I-82 yakima river bridges & chandler canal br wb - deck rehabilitation | 1 of 3 | $10,007,084 | Low, 3.0% under the second |
| 22 MAR 2023 | 009950 | NWR region | Sr 525 pedestrian and traffic improvements | 1 of 2 | $610,156 | Low, 113% under the second |
| 23 FEB 2023 | 009939 | Region 9 | Sr 525 clinton ferry terminal paving preservation | 2 of 3 | $1,071,967 | +12% |
| 11 JAN 2023 | 009903 | SWR region | Sr 433 lewis and clark bridge expansion joint replacement | 2 of 5 | $1,009,305 | +5.0% |
| 13 APR 2022 | 009785 | Region 9 | Sr163 tahlequah ferry terminal facility ada compliance improvements | 2 of 2 | $601,084 | +30% |
| 23 MAR 2022 | 009783 | NWR region | I-5 northgate way & maple rd bridges seismic retrofit | 2 of 7 | $5,620,563 | +6.0% |
| 09 MAR 2022 | 009777 | OR region | Or strategic bridge preservation 21-23 - bridge deck patching | 3 of 3 | $2,005,598 | +73% |
| 05 JAN 2022 | 009753 | NCR region | Us 2 et al ncr bridge patching 21 - 23 | 2 of 4 | $2,996,279 | +9.0% |
| 28 APR 2021 | 009678 | SWR region | Sw region wide crack seal | 3 of 4 | $1,104,231 | +29% |
| 28 APR 2021 | 009667 | SCR region | I-90 cle elum vicinity wb - weigh station preservation | 3 of 4 | $1,567,957 | +85% |
| 18 FEB 2021 | 009642 | OR region | Sr 104 hood canal bridge centerlock rehabilitation | 6 of 6 | $3,001,823 | +54% |
| 12 FEB 2020 | 009520 | NWR region | I-90 sr 202 to snoqualmie valley trail bridge seismic retrofit | 2 of 8 | $2,262,633 | +2.0% |
| 08 JAN 2020 | 009510 | NWR region | Sr 99 nb duwamish river bridge select grid deck replacement | 2 of 3 | $1,665,633 | +86% |
| 27 FEB 2019 | 009388 | NCR region | Sr 153/methow river bridges structural rehabilitation phase 3 | 2 of 2 | $1,242,001 | +12% |
| 09 JAN 2019 | 009358 | OR region | Sr 104 hood canal br stage one column & crossbeam sealing | 1 of 2 | $645,323 | Low, 62% under the second |
| 25 APR 2018 | 009259 | NCR region | Sr 153/methow river bridges structural rehabilitation phase 2 | 1 of 3 | $1,772,998 | Low, 9.0% under the second |
| 18 APR 2018 | 009253 | OR region | I-5 martin way bridges special repair | 3 of 3 | $734,705 | +23% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.