Combined Construction, Inc.: WSDOT bid record

Combined Construction, Inc. submitted 18 bids on Washington State DOT contracts in the data, from 18 APR 2018 to 07 OCT 2026, and was the low bidder on 4 of them (22%). When it was not low, its total sat a median +26% above the low bid.

Owner
Washington State DOT
Low bid volume
$13,035,561
Latest bid
07 OCT 2026
Data through
07 OCT 2026
18Bids
4Low bids
22Win rate, percent
+26%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
20182150%
20192150%
2020200%
2021300%
2022400%
20234250%
2026100%
Combined Construction, Inc., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
OR region5120%
NWR region4125%
NCR region3133%
SWR region200%
SCR region2150%
Region 9200%
Combined Construction, Inc., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Inlet protectionEACH71 (14%)$350.00$95.00
Crushed surfacing base courseTON51 (20%)$235.00$26.44
Planing bituminous pavementSY51 (20%)$25.00$4.75
Combined Construction, Inc., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
M.J. Hughes Construction, Inc.83 of 8
Massana Construction, Inc.75 of 7
Hamilton Construction Co.43 of 4
Granite Construction Company41 of 4
Lakeside Industries, Inc.22 of 2
C.A. Carey Corporation21 of 2
Graham Contracting, LTD.21 of 2
Walsh Construction Co II LLC20 of 2
Conway Construction Company20 of 2
Cascade Bridge LLC20 of 2
Combined Construction, Inc., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
07 OCT 2026XE3773OR regionSr 20 Us 101 I/S To N Of Fairmount Rd Hfst3 of 6$487,181+37%
05 APR 2023009948SCR regionI-82 yakima river bridges & chandler canal br wb - deck rehabilitation1 of 3$10,007,084Low, 3.0% under the second
22 MAR 2023009950NWR regionSr 525 pedestrian and traffic improvements1 of 2$610,156Low, 113% under the second
23 FEB 2023009939Region 9Sr 525 clinton ferry terminal paving preservation2 of 3$1,071,967+12%
11 JAN 2023009903SWR regionSr 433 lewis and clark bridge expansion joint replacement2 of 5$1,009,305+5.0%
13 APR 2022009785Region 9Sr163 tahlequah ferry terminal facility ada compliance improvements2 of 2$601,084+30%
23 MAR 2022009783NWR regionI-5 northgate way & maple rd bridges seismic retrofit2 of 7$5,620,563+6.0%
09 MAR 2022009777OR regionOr strategic bridge preservation 21-23 - bridge deck patching3 of 3$2,005,598+73%
05 JAN 2022009753NCR regionUs 2 et al ncr bridge patching 21 - 232 of 4$2,996,279+9.0%
28 APR 2021009678SWR regionSw region wide crack seal3 of 4$1,104,231+29%
28 APR 2021009667SCR regionI-90 cle elum vicinity wb - weigh station preservation3 of 4$1,567,957+85%
18 FEB 2021009642OR regionSr 104 hood canal bridge centerlock rehabilitation6 of 6$3,001,823+54%
12 FEB 2020009520NWR regionI-90 sr 202 to snoqualmie valley trail bridge seismic retrofit2 of 8$2,262,633+2.0%
08 JAN 2020009510NWR regionSr 99 nb duwamish river bridge select grid deck replacement2 of 3$1,665,633+86%
27 FEB 2019009388NCR regionSr 153/methow river bridges structural rehabilitation phase 32 of 2$1,242,001+12%
09 JAN 2019009358OR regionSr 104 hood canal br stage one column & crossbeam sealing1 of 2$645,323Low, 62% under the second
25 APR 2018009259NCR regionSr 153/methow river bridges structural rehabilitation phase 21 of 3$1,772,998Low, 9.0% under the second
18 APR 2018009253OR regionI-5 martin way bridges special repair3 of 3$734,705+23%
Combined Construction, Inc.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy