Walsh Construction Co II LLC: WSDOT bid record

Walsh Construction Co II LLC submitted 14 bids on Washington State DOT contracts in the data, from 11 DEC 2013 to 23 MAR 2022, and was the low bidder on 2 of them (14%). When it was not low, its total sat a median +18% above the low bid.

Owner
Washington State DOT
Low bid volume
$42,829,493
Latest bid
23 MAR 2022
Data through
07 OCT 2026
14Bids
2Low bids
14Win rate, percent
+18%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
201311100%
2014300%
20153133%
2016100%
2020200%
2021200%
2022200%
Walsh Construction Co II LLC, WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NWR region10220%
OR region300%
SCR region100%
Walsh Construction Co II LLC, WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Paint lineLF105 (50%)$0.45$0.25
Raised pavement marker type 2HUND105 (50%)$457.50$478.00
Plastic drainage markingEACH95 (56%)$40.00$34.00
Extruded curbLF65 (83%)$14.00$12.00
Planing bituminous pavementSY104 (40%)$3.82$4.75
Resetting impact attenuatorEACH84 (50%)$874.21$1,000.00
Connection to drainage structureEACH74 (57%)$1,250.51$750.00
Plastic wide lane lineLF64 (67%)$2.80$3.23
Plastic traffic letterEACH54 (80%)$95.00$65.00
Temporary impact attenuatorEACH103 (30%)$3,597.39$4,000.00
Erosion and sediment control leadDAY73 (43%)$70.00$100.00
Removing plastic lineLF73 (43%)$1.00$1.00
Walsh Construction Co II LLC, WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Walsh Construction Co II LLC, WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
23 MAR 2022009783NWR regionI-5 northgate way & maple rd bridges seismic retrofit4 of 7$5,799,796+10%
09 FEB 2022009763OR regionSr 16 and sr 302 (spur) purdy creek remove fish barriers and paving5 of 11$30,241,937+18%
21 APR 2021009662NWR regionSr 99 alaskan way viaduct - replacement south access surface streets2 of 4$25,057,1340.0%
24 MAR 2021009636OR regionSr 167 sr 410 to sr 18 congestion management3 of 4$26,587,454+17%
20 FEB 2020009516OR regionUs 101 bagley and siebert creeks remove fish barriers7 of 8$30,438,084+39%
12 FEB 2020009520NWR regionI-90 sr 202 to snoqualmie valley trail bridge seismic retrofit6 of 8$2,707,053+22%
09 MAR 2016008840NWR regionI-5 fisher creek - fish passage 15a013 (rev. 2/23/16)9 of 11$7,432,817+39%
09 DEC 2015008822NWR regionSr 900 tukwila ncl to sr 167 concrete pavement rehabilitation 15a0164 of 5$2,542,079+7.0%
22 APR 2015008744NWR regionSr 900 tukwila ncl to sr 167 concrete pavement rehabilitation 14a0291 of 3$2,175,476Low, 24% under the second
01 APR 2015008715SCR regionI-90 keechelus dam to stampede pass phase 2a - add lanes / build wildlife bridges 14y0155 of 6$90,324,161+24%
30 APR 2014008617NWR regionSr 530 slide - roadway clearing 14a016 (rev. 4/29/14)5 of 9$5,814,234+17%
12 MAR 2014008582NWR regionI-5 stillaguamish river bridge major bridge rehabilitation 13a0134 of 8$6,951,130+18%
20 FEB 2014008569NWR regionI-90 two-way transit & hov operations stage 3a – eb bellevue way ramps 13a006 rev. 2-4-20147 of 8$8,973,044+21%
11 DEC 2013008549NWR regionSr 99 alaskan way viaduct - replacement north access connection 13a003 (rev. 11/22/2013)1 of 7$40,654,017Low, 2.0% under the second
Walsh Construction Co II LLC: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy