Walsh Construction Co II LLC: WSDOT bid record
Walsh Construction Co II LLC submitted 14 bids on Washington State DOT contracts in the data, from 11 DEC 2013 to 23 MAR 2022, and was the low bidder on 2 of them (14%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $42,829,493
- Latest bid
- 23 MAR 2022
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 1 | 1 | 100% |
| 2014 | 3 | 0 | 0% |
| 2015 | 3 | 1 | 33% |
| 2016 | 1 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 10 | 2 | 20% |
| OR region | 3 | 0 | 0% |
| SCR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint line | LF | 10 | 5 (50%) | $0.45 | $0.25 | |
| Raised pavement marker type 2 | HUND | 10 | 5 (50%) | $457.50 | $478.00 | |
| Plastic drainage marking | EACH | 9 | 5 (56%) | $40.00 | $34.00 | |
| Extruded curb | LF | 6 | 5 (83%) | $14.00 | $12.00 | |
| Planing bituminous pavement | SY | 10 | 4 (40%) | $3.82 | $4.75 | |
| Resetting impact attenuator | EACH | 8 | 4 (50%) | $874.21 | $1,000.00 | |
| Connection to drainage structure | EACH | 7 | 4 (57%) | $1,250.51 | $750.00 | |
| Plastic wide lane line | LF | 6 | 4 (67%) | $2.80 | $3.23 | |
| Plastic traffic letter | EACH | 5 | 4 (80%) | $95.00 | $65.00 | |
| Temporary impact attenuator | EACH | 10 | 3 (30%) | $3,597.39 | $4,000.00 | |
| Erosion and sediment control lead | DAY | 7 | 3 (43%) | $70.00 | $100.00 | |
| Removing plastic line | LF | 7 | 3 (43%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scarsella Bros., Inc. | 5 | 4 of 5 |
| Gary Merlino Construction Co., | 5 | 2 of 5 |
| Midmountain Contractors, Inc. | 5 | 4 of 5 |
| Interwest Construction, Inc. | 5 | 5 of 5 |
| Max J. Kuney Company | 4 | 2 of 4 |
| C.A. Carey Corporation | 4 | 2 of 4 |
| Guy F. Atkinson Construction, | 3 | 2 of 3 |
| Granite Construction Company | 3 | 0 of 3 |
| Graham Contracting, LTD. | 3 | 3 of 3 |
| Massana Construction, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 MAR 2022 | 009783 | NWR region | I-5 northgate way & maple rd bridges seismic retrofit | 4 of 7 | $5,799,796 | +10% |
| 09 FEB 2022 | 009763 | OR region | Sr 16 and sr 302 (spur) purdy creek remove fish barriers and paving | 5 of 11 | $30,241,937 | +18% |
| 21 APR 2021 | 009662 | NWR region | Sr 99 alaskan way viaduct - replacement south access surface streets | 2 of 4 | $25,057,134 | 0.0% |
| 24 MAR 2021 | 009636 | OR region | Sr 167 sr 410 to sr 18 congestion management | 3 of 4 | $26,587,454 | +17% |
| 20 FEB 2020 | 009516 | OR region | Us 101 bagley and siebert creeks remove fish barriers | 7 of 8 | $30,438,084 | +39% |
| 12 FEB 2020 | 009520 | NWR region | I-90 sr 202 to snoqualmie valley trail bridge seismic retrofit | 6 of 8 | $2,707,053 | +22% |
| 09 MAR 2016 | 008840 | NWR region | I-5 fisher creek - fish passage 15a013 (rev. 2/23/16) | 9 of 11 | $7,432,817 | +39% |
| 09 DEC 2015 | 008822 | NWR region | Sr 900 tukwila ncl to sr 167 concrete pavement rehabilitation 15a016 | 4 of 5 | $2,542,079 | +7.0% |
| 22 APR 2015 | 008744 | NWR region | Sr 900 tukwila ncl to sr 167 concrete pavement rehabilitation 14a029 | 1 of 3 | $2,175,476 | Low, 24% under the second |
| 01 APR 2015 | 008715 | SCR region | I-90 keechelus dam to stampede pass phase 2a - add lanes / build wildlife bridges 14y015 | 5 of 6 | $90,324,161 | +24% |
| 30 APR 2014 | 008617 | NWR region | Sr 530 slide - roadway clearing 14a016 (rev. 4/29/14) | 5 of 9 | $5,814,234 | +17% |
| 12 MAR 2014 | 008582 | NWR region | I-5 stillaguamish river bridge major bridge rehabilitation 13a013 | 4 of 8 | $6,951,130 | +18% |
| 20 FEB 2014 | 008569 | NWR region | I-90 two-way transit & hov operations stage 3a – eb bellevue way ramps 13a006 rev. 2-4-2014 | 7 of 8 | $8,973,044 | +21% |
| 11 DEC 2013 | 008549 | NWR region | Sr 99 alaskan way viaduct - replacement north access connection 13a003 (rev. 11/22/2013) | 1 of 7 | $40,654,017 | Low, 2.0% under the second |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.