Guy F. Atkinson Construction,: WSDOT bid record
Guy F. Atkinson Construction, submitted 35 bids on Washington State DOT contracts in the data, from 01 MAR 2000 to 23 FEB 2022, and was the low bidder on 6 of them (17%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $200,705,750
- Latest bid
- 23 FEB 2022
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 2 | 0 | 0% |
| 2001 | 3 | 0 | 0% |
| 2002 | 2 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2009 | 5 | 1 | 20% |
| 2010 | 3 | 1 | 33% |
| 2011 | 4 | 1 | 25% |
| 2012 | 2 | 0 | 0% |
| 2013 | 4 | 1 | 25% |
| 2014 | 3 | 0 | 0% |
| 2015 | 3 | 1 | 33% |
| 2019 | 1 | 0 | 0% |
| 2020 | 1 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 21 | 5 | 24% |
| SCR region | 9 | 1 | 11% |
| OR region | 4 | 0 | 0% |
| Region 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 17 | 10 (59%) | $50.00 | $100.00 | |
| Sequential arrow sign | HR | 16 | 10 (63%) | $3.00 | $3.50 | |
| High visibility fence | LF | 20 | 7 (35%) | $3.00 | $3.09 | |
| Paint line | LF | 15 | 6 (40%) | $0.25 | $0.25 | |
| Operation of portable changeable message sign | HR | 9 | 6 (67%) | $3.00 | $3.00 | |
| Schedule update | EACH | 7 | 6 (86%) | $1,000.00 | $1,000.00 | |
| Crushed surfacing base course | TON | 16 | 5 (31%) | $15.50 | $26.44 | |
| Plastic traffic arrow | EACH | 16 | 5 (31%) | $127.50 | $135.00 | |
| Embankment compaction | CY | 17 | 4 (24%) | $4.00 | $3.50 | |
| Temporary pavement marking | LF | 14 | 4 (29%) | $0.36 | $0.20 | |
| Structure excavation class B including haul | CY | 14 | 4 (29%) | $10.50 | $15.00 | |
| Temporary concrete barrier | LF | 14 | 4 (29%) | $10.50 | $14.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Max J. Kuney Company | 13 | 7 of 13 |
| Mowat Construction Company | 10 | 7 of 10 |
| Tri-State Construction, Inc. | 9 | 7 of 9 |
| Scarsella Bros., Inc. | 8 | 5 of 8 |
| C.A. Carey Corporation | 8 | 2 of 8 |
| Kiewit Pacific Co. | 7 | 1 of 7 |
| Midmountain Contractors, Inc. | 7 | 2 of 7 |
| Gary Merlino Construction Co., | 6 | 3 of 6 |
| Granite Construction Company | 6 | 1 of 6 |
| MJ Hughes Construction, Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 FEB 2022 | 009551 | NWR region | I-5 marine view dr to sr 529 corridor & interchange improvements | 1 of 3 | $67,785,885 | Low |
| 20 FEB 2020 | 009516 | OR region | Us 101 bagley and siebert creeks remove fish barriers | 5 of 8 | $28,135,295 | +29% |
| 21 FEB 2019 | 009376 | SCR region | I-90 hyak to stampede pass phases 1f & 2f - fencing 1b and 2a xl5793 | 2 of 2 | $2,895,112 | +3.0% |
| 21 DEC 2015 | 008828 | SCR region | I-90 stampede pass interchange - bridge repair 15y012 | 6 of 8 | $635,586 | +48% |
| 01 APR 2015 | 008726 | SCR region | I-90 hyak to keechelus dam phase 1f - fencing 1b 14y012 | 2 of 2 | $1,367,888 | 0.0% |
| 01 APR 2015 | 008715 | SCR region | I-90 keechelus dam to stampede pass phase 2a - add lanes / build wildlife bridges 14y015 | 1 of 6 | $72,777,532 | Low, 5.0% under the second |
| 26 MAR 2014 | 008586 | SCR region | Sr 410 0.47 miles to 1.45 miles e of chinook pass - rock scaling 14y001 | 4 of 6 | $1,070,888 | +29% |
| 19 MAR 2014 | 008585 | NWR region | Sr 99 spokane st br to alaskan way viaduct concrete pavement rehab 13a027 | 3 of 4 | $1,263,000 | +32% |
| 08 JAN 2014 | 008558 | SCR region | I-90 snoq pass vic - pccp rehab eb/ stormwater retrofit/delineation 13y011 | 2 of 3 | $6,519,888 | +1.0% |
| 11 DEC 2013 | 008549 | NWR region | Sr 99 alaskan way viaduct - replacement north access connection 13a003 (rev. 11/22/2013) | 2 of 7 | $41,640,623 | +2.0% |
| 03 APR 2013 | 008432 | Region 8 | Sr 520 west connection bridge | 2 of 4 | $23,451,451 | +6.0% |
| 13 MAR 2013 | 008400 | NWR region | Sr 92 and i-90 intersection improvements and regionwide roadside safety project | 2 of 3 | $7,499,888 | +5.0% |
| 07 FEB 2013 | 008393 | NWR region | I-405 and sr 518 concrete pavement rehabilitation | 1 of 3 | $7,277,888 | Low |
| 08 FEB 2012 | 008244 | SCR region | Us 97 satus creek vicinity - replace br. 97/106 and paving | 6 of 13 | $9,864,556 | +12% |
| 25 JAN 2012 | 008240 | SCR region | Sr 410 nile valley landslide - re-construct route | 10 of 14 | $5,067,234 | +24% |
| 20 APR 2011 | 008113 | NWR region | Sr 518 bridges - seismic retrofit | 2 of 11 | $3,750,000 | +1.0% |
| 24 FEB 2011 | 008080 | NWR region | Sr 99 aurora ave - g washington memorial br seismic | 6 of 7 | $9,264,113 | +50% |
| 26 JAN 2011 | 008073 | NWR region | Us 2 43rd ave se vic to 50th ave se vic bridge rehabilitation | 1 of 4 | $4,135,763 | Low, 1.0% under the second |
| 05 JAN 2011 | 008047 | OR region | I-5 exit 111 lacey vic. noise walls | 8 of 17 | $3,251,867 | +13% |
| 21 APR 2010 | 007925 | NWR region | I-90 and sr 520 br 90/50n & sr520/i-405 vicinity seismic retrofit | 1 of 6 | $3,728,682 | Low, 7.0% under the second |
| 10 FEB 2010 | 007870 | NWR region | I-90 two-way transit & hov operations stage 2 | 2 of 9 | $11,694,391 | +1.0% |
| 21 JAN 2010 | 007852 | SCR region | I-90 hyak to snowshed vicinity phase 1b - add lanes and bridges | 7 of 11 | $93,153,355 | +21% |
| 02 DEC 2009 | 007849 | NWR region | I-90 two-way transit & hov operations dowel bar retrofit | 5 of 6 | $9,556,329 | +26% |
| 11 MAR 2009 | 007671 | NWR region | I-5 sr 532 to hill ditch bridge concrete pavement rehabilitation | 2 of 5 | $4,867,945 | +3.0% |
| 04 MAR 2009 | 007637 | NWR region | Sr 520 w lake sammamish pkwy to sr 202 hov and sr 202 interchange | 7 of 8 | $44,006,708 | +17% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.