Gary Merlino Construction Co.,: WSDOT bid record
Gary Merlino Construction Co., submitted 40 bids on Washington State DOT contracts in the data, from 20 DEC 2000 to 11 JAN 2023, and was the low bidder on 5 of them (13%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $94,429,159
- Latest bid
- 11 JAN 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2001 | 1 | 0 | 0% |
| 2003 | 5 | 0 | 0% |
| 2004 | 2 | 0 | 0% |
| 2005 | 1 | 1 | 100% |
| 2007 | 3 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 2 | 0 | 0% |
| 2010 | 4 | 1 | 25% |
| 2011 | 3 | 1 | 33% |
| 2012 | 3 | 0 | 0% |
| 2013 | 2 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2015 | 4 | 0 | 0% |
| 2016 | 2 | 0 | 0% |
| 2017 | 2 | 1 | 50% |
| 2019 | 1 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 28 | 5 | 18% |
| SCR region | 6 | 0 | 0% |
| OR region | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 29 | 9 (31%) | $50.00 | $100.00 | |
| Shoring or extra excavation class B | SF | 20 | 9 (45%) | $1.00 | $1.00 | |
| Sequential arrow sign | HR | 26 | 7 (27%) | $2.08 | $3.50 | |
| Other traffic control labor | HR | 25 | 6 (24%) | $60.00 | $49.00 | |
| Paint line | LF | 19 | 6 (32%) | $0.20 | $0.25 | |
| Structure excavation class B including haul | CY | 25 | 5 (20%) | $20.00 | $15.00 | |
| Plastic drainage marking | EACH | 22 | 5 (23%) | $31.50 | $34.00 | |
| Removing paint line | LF | 15 | 5 (33%) | $0.40 | $0.70 | |
| Plastic stop line | LF | 14 | 5 (36%) | $14.00 | $10.00 | |
| Removing plastic crosswalk line | SF | 8 | 5 (63%) | $4.00 | $3.00 | |
| Inlet protection | EACH | 30 | 4 (13%) | $100.00 | $95.00 | |
| Roadway excavation including haul | CY | 29 | 4 (14%) | $40.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tri-State Construction, Inc. | 15 | 11 of 15 |
| Midmountain Contractors, Inc. | 15 | 10 of 15 |
| Scarsella Bros., Inc. | 12 | 9 of 12 |
| Wilder Construction Company | 11 | 9 of 11 |
| C.A. Carey Corporation | 9 | 6 of 9 |
| Acme Concrete Paving, Inc. | 8 | 3 of 8 |
| Rodarte Construction, Inc. | 7 | 5 of 7 |
| Mowat Construction Company | 6 | 4 of 6 |
| Marshbank Construction, Inc. | 6 | 3 of 6 |
| Guy F. Atkinson Construction, | 6 | 3 of 6 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 JAN 2023 | 009901 | NWR region | I-5 duwamish river to s lucile st concrete pavement rehab & joints | 1 of 1 | $37,397,513 | Low |
| 21 APR 2021 | 009662 | NWR region | Sr 99 alaskan way viaduct - replacement south access surface streets | 3 of 4 | $26,752,847 | +7.0% |
| 13 MAR 2019 | 009385 | SCR region | I-90 bullfrog rd vic - concrete rehab, bridge deck rehab & painting | 4 of 5 | $17,384,414 | +17% |
| 15 MAR 2017 | 009036 | SCR region | I-90 468th ave se to w summit rd - concrete, deck, & culvert rehab | 6 of 6 | $36,669,861 | +32% |
| 11 JAN 2017 | 008992 | NWR region | I-5 nb s 260th st to duwamish river br concrete pavement rehab & ada | 1 of 4 | $30,811,329 | Low, 11% under the second |
| 20 APR 2016 | 008883 | NWR region | I-5 s 200th st / military rd intersection improvements 15a011 | 4 of 6 | $2,449,194 | +12% |
| 02 MAR 2016 | 008843 | SCR region | I-90/peoh rd bridge to elk heights rd vic wb - replace/rehab concrete | 2 of 2 | $18,242,131 | +3.0% |
| 16 DEC 2015 | 008816 | NWR region | I-5 sb s 320th st to duwamish river br concrete pavement rehab 14a033 revised 12-1-2015 | 3 of 5 | $22,861,227 | +12% |
| 09 DEC 2015 | 008822 | NWR region | Sr 900 tukwila ncl to sr 167 concrete pavement rehabilitation 15a016 | 2 of 5 | $2,387,678 | +1.0% |
| 22 APR 2015 | 008744 | NWR region | Sr 900 tukwila ncl to sr 167 concrete pavement rehabilitation 14a029 | 3 of 3 | $2,856,871 | +31% |
| 22 APR 2015 | 008740 | SCR region | I-90 oakes ave i/c to peoh rd bridge vic wb - replace / rehab concrete 15y001 | 2 of 3 | $10,879,779 | +2.0% |
| 20 FEB 2014 | 008569 | NWR region | I-90 two-way transit & hov operations stage 3a – eb bellevue way ramps 13a006 rev. 2-4-2014 | 6 of 8 | $8,552,376 | +16% |
| 11 DEC 2013 | 008549 | NWR region | Sr 99 alaskan way viaduct - replacement north access connection 13a003 (rev. 11/22/2013) | 6 of 7 | $49,105,880 | +21% |
| 24 JAN 2013 | 008403 | NWR region | I-405 nb sr 167 ramp to nb i-405 major drainage repair | 4 of 9 | $554,349 | +13% |
| 15 FEB 2012 | 008245 | OR region | Sr 167 vic i-5 to puyallup river bridge sidewalk ramps | 3 of 4 | $716,597 | +31% |
| 11 JAN 2012 | 008236 | NWR region | Sr 99 yesler way to spring street nb alaskan way widening | 5 of 5 | $398,152 | +20% |
| 05 JAN 2012 | 008233 | NWR region | I-405 & sr 522 ne 85th st i/c & sr 522 / sr 523 i/s pedestrian access | 5 of 5 | $291,853 | +49% |
| 23 MAR 2011 | 008101 | NWR region | Sr 519 i-90 to sr 519 pedestrian trail | 6 of 6 | $1,317,389 | +19% |
| 02 FEB 2011 | 008053 | NWR region | I-405 ne 116th street interchange and street improvement project | 1 of 10 | $10,693,961 | Low, 4.0% under the second |
| 05 JAN 2011 | 008047 | OR region | I-5 exit 111 lacey vic. noise walls | 12 of 17 | $3,423,082 | +19% |
| 24 MAR 2010 | 007893 | SCR region | I-90 lake easton vic to big creek br vic - replace / rehab concrete | 2 of 8 | $15,362,781 | +1.0% |
| 24 FEB 2010 | 007879 | OR region | Sr 510 yelm loop stage 1 | 15 of 15 | $5,554,610 | +34% |
| 10 FEB 2010 | 007870 | NWR region | I-90 two-way transit & hov operations stage 2 | 1 of 9 | $11,578,632 | Low, 1.0% under the second |
| 03 FEB 2010 | 007866 | OR region | Sr 410 214th ave. e. to 234th ave. e. widening | 11 of 12 | $8,317,955 | +23% |
| 02 DEC 2009 | 007849 | NWR region | I-90 two-way transit & hov operations dowel bar retrofit | 4 of 6 | $9,547,229 | +26% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.