Acme Concrete Paving, Inc.: WSDOT bid record
Acme Concrete Paving, Inc. submitted 23 bids on Washington State DOT contracts in the data, from 05 MAR 2003 to 08 MAR 2023, and was the low bidder on 10 of them (43%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $108,198,957
- Latest bid
- 08 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2003 | 1 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2006 | 1 | 1 | 100% |
| 2007 | 3 | 2 | 67% |
| 2009 | 1 | 0 | 0% |
| 2010 | 2 | 1 | 50% |
| 2014 | 1 | 1 | 100% |
| 2015 | 1 | 0 | 0% |
| 2016 | 1 | 1 | 100% |
| 2017 | 3 | 0 | 0% |
| 2018 | 1 | 1 | 100% |
| 2019 | 2 | 1 | 50% |
| 2021 | 1 | 0 | 0% |
| 2022 | 2 | 1 | 50% |
| 2023 | 2 | 1 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 9 | 2 | 22% |
| SCR region | 7 | 2 | 29% |
| ER region | 6 | 5 | 83% |
| SWR region | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Longitudinal joint seal | LF | 16 | 11 (69%) | $1.52 | $5.00 | |
| Cement concrete pavement grinding | SY | 14 | 8 (57%) | $16.00 | $16.60 | |
| Replace cement concrete panel | SY | 14 | 7 (50%) | $376.05 | $350.00 | |
| Construction signs class A | SF | 20 | 5 (25%) | $26.02 | $16.21 | |
| Roadway excavation including haul | CY | 15 | 5 (33%) | $41.80 | $20.00 | |
| Paint line | LF | 14 | 5 (36%) | $0.16 | $0.25 | |
| Cement concrete pavement | CY | 7 | 5 (71%) | $191.00 | $238.00 | |
| Crushed surfacing base course | TON | 18 | 4 (22%) | $35.50 | $26.44 | |
| Sequential arrow sign | HR | 16 | 4 (25%) | $3.10 | $3.50 | |
| Temporary pavement marking-short duration | LF | 10 | 4 (40%) | $0.46 | $0.40 | |
| Plastic line | LF | 8 | 4 (50%) | $1.20 | $1.51 | |
| Removing plastic line | LF | 8 | 4 (50%) | $0.91 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gary Merlino Construction Co., | 8 | 5 of 8 |
| Midmountain Contractors, Inc. | 6 | 5 of 6 |
| Kiewit Infrastructure West Co. | 5 | 1 of 5 |
| Granite Construction Company | 4 | 2 of 4 |
| C.A. Carey Corporation | 3 | 1 of 3 |
| Penhall Company | 3 | 3 of 3 |
| Imco General Construction, Inc | 3 | 2 of 3 |
| Wilder Construction Company | 2 | 2 of 2 |
| Westway Construction, Inc. | 2 | 1 of 2 |
| Kiewit Pacific Co. | 2 | 0 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAR 2023 | 009942 | NWR region | I 5 nb 206th st vic to sr 516 pavement repair | 2 of 3 | $836,164 | +22% |
| 25 JAN 2023 | 009910 | NWR region | I-5 sb joe leary slough to nulle rd vic concrete rehabilitation | 1 of 5 | $8,794,435 | Low, 5.0% under the second |
| 30 MAR 2022 | 009779 | ER region | Us 195 old bnrr bridge to jct sr 271 pccp rehabilitation | 1 of 2 | $7,916,365 | Low, 17% under the second |
| 02 MAR 2022 | 009762 | NWR region | I-90 & i-5 e sunset way vic & nb lowell rd vic pccp exp jnt rehab & deck overlay | 2 of 3 | $13,657,990 | +2.0% |
| 14 APR 2021 | 009671 | NWR region | I-5 federal way to bellingham selected pccp panel replacement | 3 of 4 | $3,829,696 | +23% |
| 24 APR 2019 | 009428 | ER region | I-90 sprague ave i/c to argonne rd i/c pccp rehabilitation grinding | 1 of 1 | $16,841,154 | Low |
| 13 MAR 2019 | 009385 | SCR region | I-90 bullfrog rd vic - concrete rehab, bridge deck rehab & painting | 5 of 5 | $17,444,144 | +18% |
| 28 FEB 2018 | 009213 | NWR region | I-90 e sunset way i/c vic to 436th ave i/c vic pavement repair | 1 of 3 | $17,345,998 | Low, 0.0% under the second |
| 15 MAR 2017 | 009036 | SCR region | I-90 468th ave se to w summit rd - concrete, deck, & culvert rehab | 4 of 6 | $30,409,668 | +9.0% |
| 15 FEB 2017 | 009026 | SCR region | Us 97 dolarway intersection - intersection improvements | 2 of 3 | $2,969,458 | +10% |
| 11 JAN 2017 | 008992 | NWR region | I-5 nb s 260th st to duwamish river br concrete pavement rehab & ada | 3 of 4 | $34,714,631 | +13% |
| 02 MAR 2016 | 008843 | SCR region | I-90/peoh rd bridge to elk heights rd vic wb - replace/rehab concrete | 1 of 2 | $17,712,492 | Low, 3.0% under the second |
| 16 DEC 2015 | 008816 | NWR region | I-5 sb s 320th st to duwamish river br concrete pavement rehab 14a033 revised 12-1-2015 | 2 of 5 | $21,995,248 | +7.0% |
| 08 JAN 2014 | 008558 | SCR region | I-90 snoq pass vic - pccp rehab eb/ stormwater retrofit/delineation 13y011 | 1 of 3 | $6,425,000 | Low, 1.0% under the second |
| 29 APR 2010 | 007923 | ER region | Us 395 nsc - freya st to farwell rd - sb additional lanes | 1 of 4 | $21,559,230 | Low |
| 18 FEB 2010 | 007885 | SCR region | I-82 granger to w grandview - eb dowel bar retrofit and concrete rehab | 2 of 5 | $4,997,000 | +4.0% |
| 02 DEC 2009 | 007849 | NWR region | I-90 two-way transit & hov operations dowel bar retrofit | 6 of 6 | $9,797,979 | +29% |
| 22 MAR 2007 | 007293 | ER region | Us 195 cornwall rd. to hatch rd. - dowel bar retrofit & paving increasing mileposts | 1 of 2 | $2,994,014 | Low, 12% under the second |
| 22 MAR 2007 | 007282 | ER region | Us 395 us 395 and hastings road pccp intersection rehabilitation | 2 of 2 | $1,149,398 | +9.0% |
| 15 MAR 2007 | 007291 | ER region | I-90 sullivan rd interchange pccp i/s rehabilitation | 1 of 2 | $1,792,097 | Low, 53% under the second |
| 15 FEB 2006 | 007084 | SWR region | I-5 i-205 to n fork lewis river bridge pccp rehabilitation | 1 of 3 | $6,818,172 | Low, 10% under the second |
| 26 JAN 2005 | 006886 | NWR region | I-5 james st. vic. to olive way vic. pavement rehabilitation - pccp | 3 of 4 | $4,337,588 | +10% |
| 05 MAR 2003 | 006510 | SCR region | I-90 indian john hill - pccp replacement | 9 of 9 | $750,000 | +51% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.