Penhall Company: WSDOT bid record
Penhall Company submitted 14 bids on Washington State DOT contracts in the data, from 28 MAR 2001 to 08 MAR 2023, and was the low bidder on 8 of them (57%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $15,047,547
- Latest bid
- 08 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2001 | 1 | 0 | 0% |
| 2008 | 1 | 1 | 100% |
| 2009 | 2 | 0 | 0% |
| 2010 | 2 | 2 | 100% |
| 2011 | 2 | 1 | 50% |
| 2012 | 1 | 0 | 0% |
| 2013 | 3 | 2 | 67% |
| 2014 | 1 | 1 | 100% |
| 2023 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 7 | 3 | 43% |
| SCR region | 2 | 2 | 100% |
| ER region | 2 | 1 | 50% |
| NCR region | 1 | 1 | 100% |
| OR region | 1 | 0 | 0% |
| SWR region | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary pavement marking | LF | 12 | 4 (33%) | $0.43 | $0.20 | |
| Paint line | LF | 10 | 4 (40%) | $0.28 | $0.25 | |
| Raised pavement marker type 2 | HUND | 9 | 4 (44%) | $500.00 | $478.00 | |
| Construction signs class A | SF | 8 | 3 (38%) | $15.00 | $16.21 | |
| Profiled plastic line | LF | 8 | 3 (38%) | $1.30 | $1.25 | |
| Sequential arrow sign | HR | 7 | 3 (43%) | $2.50 | $3.50 | |
| Portable changeable message sign | HR | 7 | 3 (43%) | $4.00 | $5.12 | |
| Temporary concrete barrier | LF | 7 | 3 (43%) | $17.50 | $14.00 | |
| Cement concrete pavement grinding | SY | 6 | 3 (50%) | $11.25 | $16.60 | |
| Other traffic control labor | HR | 5 | 3 (60%) | $75.00 | $49.00 | |
| Planing bituminous pavement | SY | 7 | 2 (29%) | $15.00 | $4.75 | |
| Erosion and sediment control lead | DAY | 8 | 1 (13%) | $187.50 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Interstate Improvement, Inc. | 5 | 1 of 5 |
| C.A. Carey Corporation | 5 | 2 of 5 |
| MJ Hughes Construction, Inc. | 5 | 2 of 5 |
| N.A. Degerstrom, Inc. | 4 | 1 of 4 |
| Guy F. Atkinson Construction, | 3 | 1 of 3 |
| Acme Concrete Paving, Inc. | 3 | 0 of 3 |
| Mowat Construction Company | 3 | 2 of 3 |
| Vetch Construction LLC | 3 | 0 of 3 |
| James W. Fowler Co. | 3 | 1 of 3 |
| Tri-State Construction, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAR 2023 | 009942 | NWR region | I 5 nb 206th st vic to sr 516 pavement repair | 1 of 3 | $687,215 | Low, 22% under the second |
| 19 MAR 2014 | 008585 | NWR region | Sr 99 spokane st br to alaskan way viaduct concrete pavement rehab 13a027 | 1 of 4 | $954,447 | Low, 30% under the second |
| 17 APR 2013 | 008462 | SWR region | I-205 / sr 14 to i-5 merge concrete rehabilitation | 1 of 4 | $2,240,474 | Low, 4.0% under the second |
| 13 MAR 2013 | 008414 | NWR region | I-5 seattle area bridges phase 1 deck rehab and expansion joint repair | 4 of 6 | $4,208,691 | +7.0% |
| 27 FEB 2013 | 008419 | SCR region | I-90 easton to ellensburg vic wb and eb bridges - deck rehabilitation | 1 of 6 | $3,526,489 | Low, 9.0% under the second |
| 20 DEC 2012 | 008395 | ER region | I-90 2013 er bridge deck rehabilitation | 5 of 8 | $565,890 | +14% |
| 20 JAN 2011 | 008069 | OR region | I-5 clover creek bridge bridge deck | 3 of 3 | $827,810 | +28% |
| 13 JAN 2011 | 008070 | ER region | I-90 eastern region bridge deck repair - 09/11 | 1 of 5 | $877,243 | Low, 7.0% under the second |
| 18 FEB 2010 | 007885 | SCR region | I-82 granger to w grandview - eb dowel bar retrofit and concrete rehab | 1 of 5 | $4,798,497 | Low, 4.0% under the second |
| 27 JAN 2010 | 007873 | NWR region | I-5 ship canal bridge noise study | 1 of 5 | $1,560,038 | Low, 8.0% under the second |
| 02 DEC 2009 | 007849 | NWR region | I-90 two-way transit & hov operations dowel bar retrofit | 2 of 6 | $7,866,745 | +4.0% |
| 11 MAR 2009 | 007671 | NWR region | I-5 sr 532 to hill ditch bridge concrete pavement rehabilitation | 4 of 5 | $5,140,857 | +9.0% |
| 11 DEC 2008 | 007643 | NCR region | Us 97 south of tonasket bridge deck repair | 1 of 4 | $403,144 | Low, 12% under the second |
| 28 MAR 2001 | 006063 | NWR region | Sr 5 and sr 99 nb sr 516 oc and battery st. tunnel roadway surface improvements | 2 of 2 | $527,424 | +1.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.