N.A. Degerstrom, Inc.: WSDOT bid record
N.A. Degerstrom, Inc. submitted 51 bids on Washington State DOT contracts in the data, from 09 MAR 2000 to 01 JUL 2026, and was the low bidder on 12 of them (24%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $16,526,995
- Latest bid
- 01 JUL 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 2 | 1 | 50% |
| 2001 | 3 | 1 | 33% |
| 2002 | 2 | 1 | 50% |
| 2003 | 3 | 3 | 100% |
| 2004 | 1 | 0 | 0% |
| 2005 | 3 | 0 | 0% |
| 2006 | 4 | 1 | 25% |
| 2007 | 3 | 0 | 0% |
| 2008 | 2 | 0 | 0% |
| 2009 | 2 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 3 | 0 | 0% |
| 2012 | 2 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2017 | 5 | 1 | 20% |
| 2018 | 6 | 2 | 33% |
| 2019 | 3 | 1 | 33% |
| 2020 | 1 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2026 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| ER region | 22 | 8 | 36% |
| NCR region | 14 | 3 | 21% |
| SCR region | 13 | 1 | 8% |
| SWR region | 1 | 0 | 0% |
| OR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint line | LF | 36 | 14 (39%) | $0.34 | $0.25 | |
| Construction signs class A | SF | 32 | 9 (28%) | $14.00 | $16.21 | |
| Flexible guide post | EACH | 23 | 8 (35%) | $35.00 | $33.23 | |
| Roadway excavation including haul | CY | 26 | 7 (27%) | $16.75 | $20.00 | |
| Portable changeable message sign | EACH | 14 | 7 (50%) | $1,640.00 | $3,850.00 | |
| Erosion and sediment control lead | DAY | 29 | 6 (21%) | $100.00 | $100.00 | |
| Removing paint line | LF | 23 | 5 (22%) | $1.00 | $0.70 | |
| Silt fence | LF | 17 | 5 (29%) | $4.50 | $4.50 | |
| Quarry spalls | CY | 17 | 5 (29%) | $65.00 | $65.00 | |
| Scarifying concrete surface | SY | 15 | 5 (33%) | $99.00 | $68.50 | |
| Removing guardrail anchor | EACH | 14 | 5 (36%) | $250.00 | $215.00 | |
| Clearing and grubbing | ACRE | 14 | 5 (36%) | $5,000.00 | $8,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Westway Construction, Inc. | 11 | 7 of 11 |
| Concrete Barrier, Inc. | 8 | 5 of 8 |
| Halme Construction Inc. | 7 | 0 of 7 |
| Scarsella Bros., Inc. | 7 | 5 of 7 |
| Mowat Construction Company | 6 | 5 of 6 |
| M.J. Hughes Construction, Inc. | 6 | 3 of 6 |
| Thompson Bros. Excavating, Inc | 5 | 3 of 5 |
| Max J. Kuney Company | 5 | 4 of 5 |
| Selland Construction, Inc. | 5 | 4 of 5 |
| Cascade Bridge LLC | 5 | 2 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 JUL 2026 | XE3756 | SCR region | I-90 Hansen Rd Overpass Emergency Bridge Replacement | 1 of 6 | $5,406,051 | Low, 5.0% under the second |
| 05 JAN 2022 | 009753 | NCR region | Us 2 et al ncr bridge patching 21 - 23 | 3 of 4 | $3,032,021 | +10% |
| 13 JAN 2021 | 009623 | ER region | Sr290/barker road bnsf grade separation spokane county - mp 12.5 | 2 of 5 | $12,599,067 | +8.0% |
| 23 JAN 2020 | 009509 | ER region | Sr 290 spokane river e trent br replace bridge | 3 of 4 | $23,988,149 | +19% |
| 24 APR 2019 | 009426 | ER region | Sr 21 w fork san poil bridge- replace structure | 1 of 4 | $5,673,976 | Low, 13% under the second |
| 17 APR 2019 | 009418 | SCR region | Sr 129 buford creek barrier fish passage | 3 of 3 | $4,556,489 | +39% |
| 24 JAN 2019 | 009369 | ER region | Us 195 thorpe rd intersection improvement | 3 of 4 | $1,376,832 | +12% |
| 11 APR 2018 | 009236 | NCR region | Us 97 n. of blewett pass culvert replacements | 6 of 6 | $1,909,165 | +75% |
| 07 MAR 2018 | 009214 | SCR region | I-90 yakima river bridges cle elum to ellensburg eb & wb - deck rehab | 2 of 6 | $14,391,784 | +3.0% |
| 22 FEB 2018 | 009210 | ER region | Sr 25 spokane river bridge n embankment repair | 1 of 3 | $1,426,552 | Low, 34% under the second |
| 14 FEB 2018 | 009209 | NCR region | Us 97 swauk creek campground remove fish barrier | 2 of 3 | $5,290,576 | +23% |
| 07 FEB 2018 | 009204 | ER region | Us 195 eastern region bridge deck repairs | 1 of 5 | $2,075,511 | Low, 17% under the second |
| 24 JAN 2018 | 009201 | SCR region | Sr 128 snake river red wolf bridge - deck rehabilitation | 2 of 6 | $1,559,406 | +22% |
| 22 MAR 2017 | 009054 | ER region | I-90 3rd ave bridge - special repair - eb | 2 of 2 | $2,147,187 | +29% |
| 08 MAR 2017 | 009032 | SCR region | I-90 & i-82 easton vic and ellensburg vic eb & wb - deck rehabilitation | 3 of 3 | $3,326,563 | +5.0% |
| 08 MAR 2017 | 009037 | ER region | Us 195 & us 395 eastern region expansion joint repairs | 1 of 2 | $292,724 | Low, 39% under the second |
| 15 FEB 2017 | 009020 | NCR region | Us 101 matriotti creek remove fish barrier | 6 of 8 | $1,945,543 | +35% |
| 01 FEB 2017 | 009008 | ER region | Us 395 nsc - spokane river to francis ave grading | 5 of 7 | $555,524 | +45% |
| 21 DEC 2015 | 008828 | SCR region | I-90 stampede pass interchange - bridge repair 15y012 | 2 of 8 | $545,592 | +27% |
| 27 FEB 2013 | 008419 | SCR region | I-90 easton to ellensburg vic wb and eb bridges - deck rehabilitation | 5 of 6 | $4,747,906 | +35% |
| 20 DEC 2012 | 008395 | ER region | I-90 2013 er bridge deck rehabilitation | 4 of 8 | $552,751 | +11% |
| 06 DEC 2012 | 008385 | NCR region | Us 2 e. of coles corner box culvert | 9 of 9 | $1,111,297 | +73% |
| 13 JAN 2011 | 008070 | ER region | I-90 eastern region bridge deck repair - 09/11 | 5 of 5 | $1,122,527 | +28% |
| 06 JAN 2011 | 008058 | NCR region | Ncr major drainage 2011 | 8 of 9 | $660,784 | +25% |
| 05 JAN 2011 | 008047 | OR region | I-5 exit 111 lacey vic. noise walls | 17 of 17 | $4,283,589 | +49% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.