Thompson Bros. Excavating, Inc: WSDOT bid record
Thompson Bros. Excavating, Inc submitted 33 bids on Washington State DOT contracts in the data, from 09 JAN 2003 to 11 JAN 2023, and was the low bidder on 6 of them (18%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $5,295,293
- Latest bid
- 11 JAN 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2003 | 1 | 0 | 0% |
| 2004 | 1 | 0 | 0% |
| 2005 | 2 | 0 | 0% |
| 2006 | 2 | 1 | 50% |
| 2007 | 1 | 0 | 0% |
| 2008 | 3 | 0 | 0% |
| 2009 | 4 | 2 | 50% |
| 2010 | 2 | 0 | 0% |
| 2012 | 4 | 1 | 25% |
| 2013 | 3 | 1 | 33% |
| 2014 | 2 | 0 | 0% |
| 2015 | 2 | 0 | 0% |
| 2016 | 2 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| SWR region | 10 | 2 | 20% |
| NWR region | 8 | 0 | 0% |
| OR region | 5 | 3 | 60% |
| NCR region | 4 | 0 | 0% |
| SCR region | 3 | 0 | 0% |
| ER region | 2 | 1 | 50% |
| Region 0 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 28 | 12 (43%) | $45.00 | $100.00 | |
| Crushed surfacing base course | TON | 21 | 8 (38%) | $22.00 | $26.44 | |
| Roadway excavation including haul | CY | 17 | 7 (41%) | $12.00 | $20.00 | |
| Removing guardrail | LF | 10 | 5 (50%) | $6.00 | $5.00 | |
| Other traffic control labor | HR | 9 | 5 (56%) | $44.00 | $49.00 | |
| Portable changeable message sign | HR | 9 | 5 (56%) | $3.00 | $5.12 | |
| Silt fence | LF | 15 | 3 (20%) | $3.50 | $4.50 | |
| Sequential arrow sign | HR | 7 | 3 (43%) | $3.00 | $3.50 | |
| Inlet protection | EACH | 6 | 3 (50%) | $55.00 | $95.00 | |
| Construction signs class A | SF | 16 | 2 (13%) | $20.00 | $16.21 | |
| Clearing and grubbing | ACRE | 16 | 2 (13%) | $8,250.00 | $8,000.00 | |
| Wattle | LF | 10 | 2 (20%) | $4.50 | $4.24 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Nutter Corporation DBA Nutter | 7 | 3 of 7 |
| Scarsella Bros., Inc. | 7 | 6 of 7 |
| Rognlin'S, Inc. | 7 | 0 of 7 |
| Tapani Underground, Inc. | 6 | 4 of 6 |
| N.A. Degerstrom, Inc. | 5 | 2 of 5 |
| Wilder Construction Company | 5 | 3 of 5 |
| Strider Construction Co., Inc. | 5 | 3 of 5 |
| Interwest Construction, Inc. | 5 | 3 of 5 |
| Jansen Inc. | 4 | 1 of 4 |
| Ram Construction General | 4 | 1 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 JAN 2023 | 009909 | SWR region | Sr 500 ne fourth plain blvd, 162nd-166th ave safe route to school | 1 of 4 | $953,000 | Low, 4.0% under the second |
| 10 APR 2019 | 009415 | Region 0 | I-5 i-5/gee creek sb sra - rehabilitate rv dump station | 4 of 5 | $1,987,000 | +32% |
| 15 FEB 2017 | 009020 | NCR region | Us 101 matriotti creek remove fish barrier | 2 of 8 | $1,805,145 | +26% |
| 08 FEB 2017 | 009019 | NCR region | Sr 900 green creek remove fish barrier | 6 of 7 | $1,185,058 | +33% |
| 16 MAR 2016 | 008853 | OR region | Sr 121 blooms ditch remove fish barriers 14c515 | 4 of 10 | $1,450,000 | +4.0% |
| 09 MAR 2016 | 008849 | OR region | Sr 108 little skookum creek remove fish barrier 14c511 | 3 of 8 | $1,480,000 | +2.0% |
| 29 APR 2015 | 008752 | SWR region | Sr 504 1.3 miles east of sr 505 slope stabilization 15x304 | 2 of 8 | $373,818 | +6.0% |
| 14 JAN 2015 | 008698 | NWR region | Sr 99 w fork hylebos creek fish passage 14a020 | 2 of 10 | $1,417,000 | +6.0% |
| 30 APR 2014 | 008610 | SWR region | Sr 4 elochoman river vic. culvert replacements 14x301 | 3 of 3 | $1,471,000 | +8.0% |
| 05 MAR 2014 | 008584 | NWR region | Sr 18 taylor creek scour protection 13a028 | 3 of 6 | $221,863 | +60% |
| 03 APR 2013 | 008448 | SWR region | Sr 503 ne 65th st to padden parkway median curb | 2 of 3 | $246,735 | +27% |
| 13 MAR 2013 | 008431 | OR region | Sr 112 coville creek fish barrier removal | 1 of 7 | $995,504 | Low, 14% under the second |
| 09 JAN 2013 | 008397 | NWR region | Sr 9 np creek fish passage | 4 of 12 | $375,419 | +7.0% |
| 06 DEC 2012 | 008385 | NCR region | Us 2 e. of coles corner box culvert | 2 of 9 | $690,865 | +7.0% |
| 28 MAR 2012 | 008260 | NWR region | I-405 thunder hills creek mitigation fish barrier retrofit | 2 of 3 | $3,166,052 | 0.0% |
| 07 MAR 2012 | 008246 | SWR region | Sr 501 ridgefield interchange stage ii - roadway improvements | 10 of 11 | $3,587,595 | +27% |
| 05 JAN 2012 | 008234 | OR region | Us 101 s of beacon point dr culvert replacement | 1 of 9 | $260,401 | Low, 1.0% under the second |
| 18 FEB 2010 | 007883 | SCR region | I-82 terrace heights off ramp- improvements | 5 of 5 | $568,830 | +49% |
| 21 JAN 2010 | 007876 | SWR region | Sr 142 sr14 to us97 roadside safety phase 2 | 2 of 8 | $729,802 | +1.0% |
| 10 DEC 2009 | 007850 | ER region | Sr 27 pine creek bridge - replace bridge | 1 of 11 | $2,301,454 | Low, 1.0% under the second |
| 11 FEB 2009 | 007659 | NWR region | Sr 542 warnick bluff site | 4 of 17 | $440,472 | +11% |
| 11 FEB 2009 | 007657 | OR region | Sr 104 1.2 mi. w hcb - fish passage | 1 of 15 | $423,454 | Low, 35% under the second |
| 07 JAN 2009 | 007655 | SWR region | Avery road southbound off ramp turn pocket | 5 of 10 | $171,910 | +29% |
| 19 MAR 2008 | 007506 | NWR region | Sr 9 and sr 20 thunder creek and coal creek bridges bridge scour | 10 of 14 | $404,048 | +33% |
| 05 MAR 2008 | 007492 | NWR region | Sr 539 horton road to sr 546 wetland mitigation | 11 of 12 | $5,617,479 | +63% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.