Cascade Bridge LLC: WSDOT bid record
Cascade Bridge LLC submitted 31 bids on Washington State DOT contracts in the data, from 18 DEC 2002 to 05 APR 2023, and was the low bidder on 2 of them (6%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $22,977,224
- Latest bid
- 05 APR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 1 | 100% |
| 2005 | 1 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2009 | 4 | 0 | 0% |
| 2011 | 2 | 0 | 0% |
| 2012 | 4 | 1 | 25% |
| 2013 | 1 | 0 | 0% |
| 2014 | 2 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2018 | 5 | 0 | 0% |
| 2019 | 4 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| SWR region | 13 | 1 | 8% |
| OR region | 7 | 1 | 14% |
| SCR region | 6 | 0 | 0% |
| ER region | 3 | 0 | 0% |
| NCR region | 1 | 0 | 0% |
| NWR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint line | LF | 25 | 7 (28%) | $0.41 | $0.25 | |
| Crushed surfacing base course | TON | 23 | 5 (22%) | $26.00 | $26.44 | |
| Erosion and sediment control lead | DAY | 22 | 5 (23%) | $75.00 | $100.00 | |
| Flexible guide post | EACH | 19 | 5 (26%) | $35.00 | $33.23 | |
| Temporary impact attenuator | EACH | 11 | 5 (45%) | $3,000.00 | $4,000.00 | |
| Portable changeable message sign | HR | 8 | 5 (63%) | $2.75 | $5.12 | |
| Removing guardrail | LF | 18 | 4 (22%) | $5.00 | $5.00 | |
| Traffic barrier | LF | 15 | 4 (27%) | $125.00 | $140.00 | |
| Resetting impact attenuator | EACH | 7 | 4 (57%) | $1,000.00 | $1,000.00 | |
| Roadway excavation including haul | CY | 23 | 3 (13%) | $20.00 | $20.00 | |
| Construction signs class A | SF | 18 | 3 (17%) | $20.00 | $16.21 | |
| Extruded curb | LF | 17 | 3 (18%) | $25.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Quigg Bros., Inc. | 15 | 2 of 15 |
| Hamilton Construction Co. | 13 | 3 of 13 |
| Selby Bridge Company, Inc. | 11 | 3 of 11 |
| M.J. Hughes Construction, Inc. | 10 | 3 of 10 |
| Rognlin'S, Inc. | 8 | 1 of 8 |
| Mowat Construction Company | 8 | 4 of 8 |
| Ceccanti, Inc. | 7 | 0 of 7 |
| Granite Construction Company | 7 | 0 of 7 |
| Max J. Kuney Company | 7 | 2 of 7 |
| Conway Construction Company | 7 | 2 of 7 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 APR 2023 | 009948 | SCR region | I-82 yakima river bridges & chandler canal br wb - deck rehabilitation | 2 of 3 | $10,267,934 | +3.0% |
| 11 JAN 2023 | 009903 | SWR region | Sr 433 lewis and clark bridge expansion joint replacement | 3 of 5 | $1,182,355 | +23% |
| 06 APR 2022 | 009795 | SWR region | Sr 506 1.5 miles n of frontage rd to i-5 emergency bridge repair | 2 of 8 | $841,042 | +1.0% |
| 10 APR 2019 | 009419 | SWR region | Sr 506 lacamas creek bridge replacement | 2 of 8 | $3,629,339 | +12% |
| 27 MAR 2019 | 009398 | OR region | Us 101 west jefferson county remove fish barriers | 2 of 7 | $15,894,173 | +2.0% |
| 27 MAR 2019 | 009412 | SWR region | Sr 6 south branch fronia creek and fronia creek - fish passage | 4 of 6 | $1,597,342 | +15% |
| 24 JAN 2019 | 009360 | OR region | Sr 107 chehalis river bridge structural rehabilitation & painting | 3 of 10 | $19,649,488 | +1.0% |
| 07 MAR 2018 | 009214 | SCR region | I-90 yakima river bridges cle elum to ellensburg eb & wb - deck rehab | 6 of 6 | $17,781,246 | +27% |
| 28 FEB 2018 | 009215 | OR region | Sr 112 olsen creek in vicinity of vista dr remove fish barrier | 2 of 4 | $1,794,440 | +7.0% |
| 07 FEB 2018 | 009204 | ER region | Us 195 eastern region bridge deck repairs | 3 of 5 | $2,483,796 | +20% |
| 24 JAN 2018 | 009201 | SCR region | Sr 128 snake river red wolf bridge - deck rehabilitation | 3 of 6 | $1,713,256 | +34% |
| 07 JAN 2018 | 009197 | SWR region | Sr 508 s. fork newaukum river bridge replacement | 2 of 10 | $5,031,085 | 0.0% |
| 22 MAR 2017 | 009038 | SCR region | I-82 wb & us 97 yakima county - deck rehabilitation | 4 of 5 | $1,567,206 | +10% |
| 25 JAN 2017 | 009011 | ER region | Us 395 nsc freya st - structures | 7 of 7 | $8,889,037 | +16% |
| 09 MAR 2016 | 008840 | NWR region | I-5 fisher creek - fish passage 15a013 (rev. 2/23/16) | 8 of 11 | $6,848,374 | +28% |
| 03 DEC 2014 | 008685 | OR region | Sr 162 puyallup river bridge bridge replacement 13c521 | 5 of 15 | $5,793,909 | +6.0% |
| 29 JAN 2014 | 008572 | SWR region | Sr 6 rock creek bridges replace bridges 6/102 & 6/103 13x308 (revised 1/8/2014) | 2 of 12 | $11,890,905 | +2.0% |
| 24 APR 2013 | 008464 | SWR region | Sr 6 willapa river bridge replace bridge | 2 of 8 | $4,391,840 | +8.0% |
| 25 APR 2012 | 008272 | SWR region | I-5 mellen street to blakeslee junction-stage 1 | 1 of 9 | $21,596,150 | Low, 0.0% under the second |
| 11 APR 2012 | 008267 | OR region | Sr 8 us 101 overcrossing seismic retrofit | 3 of 8 | $570,434 | +5.0% |
| 04 APR 2012 | 008261 | SCR region | Sr 10 bristol fill bridge - deck replacement | 2 of 8 | $1,612,497 | +17% |
| 08 FEB 2012 | 008244 | SCR region | Us 97 satus creek vicinity - replace br. 97/106 and paving | 5 of 13 | $9,746,907 | +10% |
| 13 APR 2011 | 008105 | SWR region | Sr14 camas / washougal add lanes and build interchange | 2 of 9 | $29,062,382 | +2.0% |
| 05 JAN 2011 | 008047 | OR region | I-5 exit 111 lacey vic. noise walls | 7 of 17 | $3,224,738 | +12% |
| 17 DEC 2009 | 007857 | NCR region | Us 2 stevens pass summit pedestrian safety | 5 of 9 | $2,349,768 | +32% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.