M.J. Hughes Construction, Inc.: WSDOT bid record
M.J. Hughes Construction, Inc. submitted 28 bids on Washington State DOT contracts in the data, from 09 MAR 2016 to 26 AUG 2026, and was the low bidder on 4 of them (14%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $7,683,522
- Latest bid
- 26 AUG 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2016 | 5 | 2 | 40% |
| 2017 | 3 | 1 | 33% |
| 2018 | 6 | 0 | 0% |
| 2019 | 4 | 0 | 0% |
| 2020 | 3 | 0 | 0% |
| 2022 | 4 | 1 | 25% |
| 2023 | 2 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 8 | 2 | 25% |
| SWR region | 8 | 0 | 0% |
| SCR region | 7 | 1 | 14% |
| NCR region | 2 | 1 | 50% |
| NWR region | 2 | 0 | 0% |
| ER region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection | EACH | 10 | 6 (60%) | $57.50 | $95.00 | |
| Flexible guide post | EACH | 12 | 4 (33%) | $52.00 | $33.23 | |
| Hot mix asphalt sawcut and seal | LF | 7 | 4 (57%) | $24.69 | $30.00 | |
| Removing wire fence | LF | 6 | 4 (67%) | $1.00 | $2.00 | |
| Paint line | LF | 17 | 3 (18%) | $1.00 | $0.25 | |
| Planing bituminous pavement | SY | 13 | 3 (23%) | $10.00 | $4.75 | |
| Temporary pavement marking-short duration | LF | 13 | 3 (23%) | $3.50 | $0.40 | |
| Roadway excavation including haul | CY | 11 | 3 (27%) | $31.00 | $20.00 | |
| Beam guardrail type 31 non-flared terminal | EACH | 10 | 3 (30%) | $3,495.00 | $2,700.00 | |
| Bark or wood chip mulch | ACRE | 9 | 3 (33%) | $18,500 | $25,000 | |
| Removing guardrail | LF | 8 | 3 (38%) | $7.25 | $5.00 | |
| Construction geotextile for separation | SY | 6 | 3 (50%) | $1.13 | $2.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Quigg Bros., Inc. | 12 | 5 of 12 |
| Cascade Bridge LLC | 10 | 7 of 10 |
| Granite Construction Company | 9 | 4 of 9 |
| Combined Construction, Inc. | 8 | 5 of 8 |
| Ceccanti, Inc. | 6 | 2 of 6 |
| Rognlin'S, Inc. | 6 | 2 of 6 |
| Hamilton Construction Co. | 6 | 4 of 6 |
| N.A. Degerstrom, Inc. | 6 | 3 of 6 |
| Conway Construction Company | 5 | 2 of 5 |
| Massana Construction, Inc. | 5 | 4 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 3 of 7 | $413,623 | +25% |
| 05 APR 2023 | 009948 | SCR region | I-82 yakima river bridges & chandler canal br wb - deck rehabilitation | 3 of 3 | $10,997,485 | +10% |
| 11 JAN 2023 | 009903 | SWR region | Sr 433 lewis and clark bridge expansion joint replacement | 5 of 5 | $1,609,105 | +68% |
| 06 APR 2022 | 009795 | SWR region | Sr 506 1.5 miles n of frontage rd to i-5 emergency bridge repair | 8 of 8 | $1,224,077 | +47% |
| 23 MAR 2022 | 009783 | NWR region | I-5 northgate way & maple rd bridges seismic retrofit | 7 of 7 | $8,057,579 | +52% |
| 09 MAR 2022 | 009777 | OR region | Or strategic bridge preservation 21-23 - bridge deck patching | 2 of 3 | $1,487,350 | +28% |
| 05 JAN 2022 | 009753 | NCR region | Us 2 et al ncr bridge patching 21 - 23 | 1 of 4 | $2,746,623 | Low, 9.0% under the second |
| 01 APR 2020 | 009533 | SCR region | Us 12 white pass vicinity - major drainage phase 3 | 5 of 5 | $1,222,395 | +36% |
| 18 MAR 2020 | 009529 | SWR region | I-5/ woodland vicinity horseshoe lake upgrade pump system | 3 of 8 | $1,546,265 | +13% |
| 12 FEB 2020 | 009520 | NWR region | I-90 sr 202 to snoqualmie valley trail bridge seismic retrofit | 8 of 8 | $3,642,848 | +64% |
| 10 APR 2019 | 009419 | SWR region | Sr 506 lacamas creek bridge replacement | 5 of 8 | $3,973,621 | +23% |
| 03 APR 2019 | 009414 | SWR region | Sr 6 salmon creek fish passage | 3 of 4 | $1,364,971 | +15% |
| 27 MAR 2019 | 009412 | SWR region | Sr 6 south branch fronia creek and fronia creek - fish passage | 2 of 6 | $1,458,175 | +5.0% |
| 09 JAN 2019 | 009358 | OR region | Sr 104 hood canal br stage one column & crossbeam sealing | 2 of 2 | $1,043,473 | +62% |
| 25 APR 2018 | 009265 | SWR region | Us 101 d st vicinity to water street paving and ada | 2 of 4 | $1,392,814 | +2.0% |
| 18 APR 2018 | 009253 | OR region | I-5 martin way bridges special repair | 2 of 3 | $720,970 | +20% |
| 07 MAR 2018 | 009214 | SCR region | I-90 yakima river bridges cle elum to ellensburg eb & wb - deck rehab | 4 of 6 | $15,194,554 | +9.0% |
| 07 FEB 2018 | 009204 | ER region | Us 195 eastern region bridge deck repairs | 2 of 5 | $2,436,404 | +17% |
| 24 JAN 2018 | 009201 | SCR region | Sr 128 snake river red wolf bridge - deck rehabilitation | 4 of 6 | $1,782,664 | +40% |
| 07 JAN 2018 | 009197 | SWR region | Sr 508 s. fork newaukum river bridge replacement | 6 of 10 | $5,369,322 | +7.0% |
| 22 MAR 2017 | 009038 | SCR region | I-82 wb & us 97 yakima county - deck rehabilitation | 5 of 5 | $1,714,196 | +21% |
| 08 MAR 2017 | 009032 | SCR region | I-90 & i-82 easton vic and ellensburg vic eb & wb - deck rehabilitation | 1 of 3 | $3,160,913 | Low, 4.0% under the second |
| 15 FEB 2017 | 009020 | NCR region | Us 101 matriotti creek remove fish barrier | 4 of 8 | $1,874,501 | +30% |
| 13 APR 2016 | 008869 | OR region | Sr 161 south creek remove fish barrier 14c508 | 1 of 5 | $699,999 | Low, 7.0% under the second |
| 06 APR 2016 | 008867 | OR region | Sr 507 lacamas crk trib. to muck crk remove fish barrier 15c515 | 1 of 6 | $1,075,988 | Low, 3.0% under the second |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.