Massana Construction, Inc.: WSDOT bid record
Massana Construction, Inc. submitted 38 bids on Washington State DOT contracts in the data, from 07 JAN 2009 to 11 JAN 2023, and was the low bidder on 17 of them (45%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $33,835,432
- Latest bid
- 11 JAN 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2009 | 2 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 2 | 1 | 50% |
| 2013 | 2 | 0 | 0% |
| 2014 | 2 | 2 | 100% |
| 2015 | 4 | 2 | 50% |
| 2016 | 1 | 1 | 100% |
| 2017 | 5 | 3 | 60% |
| 2019 | 1 | 1 | 100% |
| 2020 | 4 | 1 | 25% |
| 2021 | 7 | 3 | 43% |
| 2022 | 5 | 1 | 20% |
| 2023 | 2 | 2 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 16 | 4 | 25% |
| NWR region | 8 | 5 | 63% |
| Region 9 | 6 | 4 | 67% |
| SWR region | 4 | 3 | 75% |
| NCR region | 3 | 0 | 0% |
| SCR region | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 17 | 6 (35%) | $50.00 | $100.00 | |
| Portable changeable message sign | HR | 9 | 6 (67%) | $6.00 | $5.12 | |
| Inlet protection | EACH | 16 | 5 (31%) | $97.50 | $95.00 | |
| High visibility fence | LF | 9 | 5 (56%) | $3.00 | $3.09 | |
| Raised pavement marker type 2 | HUND | 8 | 5 (63%) | $775.00 | $478.00 | |
| Plastic drainage marking | EACH | 5 | 5 (100%) | $60.00 | $34.00 | |
| Crushed surfacing base course | TON | 9 | 4 (44%) | $75.00 | $26.44 | |
| Beam guardrail type 31 | LF | 8 | 4 (50%) | $34.05 | $26.32 | |
| Sequential arrow sign | HR | 7 | 4 (57%) | $3.00 | $3.50 | |
| Removing guardrail anchor | EACH | 6 | 4 (67%) | $200.00 | $215.00 | |
| Paint line | LF | 8 | 3 (38%) | $1.35 | $0.25 | |
| Training | HR | 7 | 3 (43%) | $5.00 | $4.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| C.A. Carey Corporation | 9 | 0 of 9 |
| Quigg Bros., Inc. | 8 | 2 of 8 |
| Combined Construction, Inc. | 7 | 2 of 7 |
| Rognlin'S, Inc. | 6 | 4 of 6 |
| Petersen Brothers, Inc. | 5 | 2 of 5 |
| M.J. Hughes Construction, Inc. | 5 | 1 of 5 |
| Tri-State Construction, Inc. | 4 | 3 of 4 |
| Mowat Construction Company | 4 | 2 of 4 |
| Construction Ahead, Inc. DBA | 4 | 2 of 4 |
| Coral Construction Company | 4 | 1 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 JAN 2023 | 009915 | SWR region | Swr breakaway cable terminal replacement freeways 21-23 | 1 of 4 | $1,618,481 | Low, 0.0% under the second |
| 11 JAN 2023 | 009903 | SWR region | Sr 433 lewis and clark bridge expansion joint replacement | 1 of 5 | $960,365 | Low, 5.0% under the second |
| 13 APR 2022 | 009797 | OR region | 2021 or region wide safety features signing | 2 of 2 | $736,077 | +3.0% |
| 23 MAR 2022 | 009783 | NWR region | I-5 northgate way & maple rd bridges seismic retrofit | 3 of 7 | $5,666,327 | +7.0% |
| 16 MAR 2022 | 009780 | OR region | Us 101 / hoquiam river riverside bridge - machinery room & operator house rehabilitation | 2 of 2 | $1,783,704 | +8.0% |
| 09 MAR 2022 | 009777 | OR region | Or strategic bridge preservation 21-23 - bridge deck patching | 1 of 3 | $1,158,042 | Low, 28% under the second |
| 05 JAN 2022 | 009753 | NCR region | Us 2 et al ncr bridge patching 21 - 23 | 4 of 4 | $3,175,587 | +16% |
| 28 APR 2021 | 009667 | SCR region | I-90 cle elum vicinity wb - weigh station preservation | 1 of 4 | $845,422 | Low, 70% under the second |
| 24 MAR 2021 | 009636 | OR region | Sr 167 sr 410 to sr 18 congestion management | 4 of 4 | $27,737,419 | +22% |
| 18 FEB 2021 | 009651 | NWR region | Sr 18 weyerhaeuser way vic to sr164 vic barrier replacement | 1 of 3 | $2,469,363 | Low, 5.0% under the second |
| 18 FEB 2021 | 009642 | OR region | Sr 104 hood canal bridge centerlock rehabilitation | 1 of 6 | $1,943,503 | Low, 6.0% under the second |
| 03 FEB 2021 | 009646 | NWR region | I-5 lake samish vic stormwater retrofit | 2 of 6 | $123,763 | +2.0% |
| 13 JAN 2021 | 009631 | NCR region | Us 2 et al ncr 19-21 regionwide curve warning sign update | 5 of 5 | $553,417 | +46% |
| 06 JAN 2021 | 009627 | OR region | Sr 8 and sr 507 thurston county stormwater retrofit | 3 of 5 | $252,901 | +11% |
| 01 APR 2020 | 009532 | OR region | Sr 410 e of main ave to w of 166th ave e - install cable barrier | 2 of 4 | $459,608 | +19% |
| 11 MAR 2020 | 009528 | NCR region | I-90 silica rd to adams co line cable barrier upgrades | 2 of 5 | $3,127,620 | +3.0% |
| 12 FEB 2020 | 009520 | NWR region | I-90 sr 202 to snoqualmie valley trail bridge seismic retrofit | 1 of 8 | $2,227,531 | Low, 2.0% under the second |
| 12 FEB 2020 | 009522 | Region 9 | Sr104 edmonds ferry terminal pavement repairs | 2 of 3 | $113,143 | +17% |
| 09 JAN 2019 | 009357 | NWR region | Sr 509 & sr 518 s 192 st to normandy pk & sr 509 to sr 99 paving & ada & deck & seismic | 1 of 6 | $9,030,006 | Low, 10% under the second |
| 20 DEC 2017 | 009185 | SWR region | I-5 mtb cantilever signs and landscaping | 1 of 3 | $1,344,751 | Low, 11% under the second |
| 22 MAR 2017 | 009044 | Region 9 | Sr 525 mukilteo ferry terminal (phase 2) trestle & bridge seat pile procurement | 1 of 4 | $1,208,939 | Low, 3.0% under the second |
| 15 FEB 2017 | 009022 | OR region | Sr 3 and sr 16 olympic dr nw to sr 305 i/c install cable barrier | 1 of 4 | $1,662,953 | Low, 16% under the second |
| 15 FEB 2017 | 009023 | SWR region | I-5 sb cowlitz river bridge repair bridge | 2 of 7 | $291,004 | +13% |
| 11 JAN 2017 | 009007 | OR region | Sr 16 union ave. to jackson ave. ada ramps | 2 of 3 | $240,114 | +4.0% |
| 07 DEC 2016 | 008985 | Region 9 | Sr519 seattle ferry terminal timber pile preservation 16x161 | 1 of 4 | $436,898 | Low, 2.0% under the second |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.