Coral Construction Company: WSDOT bid record
Coral Construction Company submitted 63 bids on Washington State DOT contracts in the data, from 27 JAN 2000 to 29 MAR 2023, and was the low bidder on 13 of them (21%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $11,191,828
- Latest bid
- 29 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2001 | 3 | 1 | 33% |
| 2003 | 4 | 1 | 25% |
| 2004 | 5 | 0 | 0% |
| 2005 | 2 | 1 | 50% |
| 2006 | 1 | 0 | 0% |
| 2007 | 4 | 0 | 0% |
| 2008 | 6 | 3 | 50% |
| 2009 | 6 | 1 | 17% |
| 2010 | 5 | 4 | 80% |
| 2011 | 1 | 0 | 0% |
| 2012 | 5 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2015 | 3 | 0 | 0% |
| 2016 | 2 | 0 | 0% |
| 2017 | 3 | 0 | 0% |
| 2018 | 1 | 1 | 100% |
| 2019 | 4 | 0 | 0% |
| 2020 | 3 | 1 | 33% |
| 2023 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NCR region | 19 | 4 | 21% |
| SWR region | 12 | 2 | 17% |
| NWR region | 9 | 5 | 56% |
| OR region | 9 | 1 | 11% |
| ER region | 7 | 0 | 0% |
| SCR region | 7 | 1 | 14% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 34 | 16 (47%) | $100.00 | $100.00 | |
| Removing guardrail | LF | 39 | 8 (21%) | $5.00 | $5.00 | |
| Removing guardrail anchor | EACH | 35 | 7 (20%) | $225.00 | $215.00 | |
| Flexible guide post | EACH | 33 | 7 (21%) | $35.00 | $33.23 | |
| Beam guardrail anchor type 10 | EACH | 24 | 7 (29%) | $762.50 | $894.00 | |
| Beam guardrail type 1 | LF | 17 | 7 (41%) | $19.50 | $20.00 | |
| Beam guardrail type 31 | LF | 25 | 5 (20%) | $24.00 | $26.32 | |
| Beam guardrail type 31 - 8 FT. long post | LF | 16 | 5 (31%) | $22.75 | $25.84 | |
| Beam guardrail non-flared terminal | EACH | 14 | 5 (36%) | $2,350.00 | $2,200.00 | |
| Paint line | LF | 11 | 5 (45%) | $0.15 | $0.25 | |
| High visibility fence | LF | 11 | 5 (45%) | $3.00 | $3.09 | |
| Beam guardrail anchor type 1 | EACH | 11 | 5 (45%) | $675.00 | $650.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Petersen Brothers, Inc. | 45 | 23 of 45 |
| Dirt and Aggregate Interchange | 35 | 21 of 35 |
| Frank Gurney, Inc. | 26 | 19 of 26 |
| Construction Ahead, Inc. DBA | 10 | 7 of 10 |
| Sharp-Line Industries, Inc. | 6 | 5 of 6 |
| Chandler Construction, Inc. | 4 | 3 of 4 |
| C.A. Carey Corporation | 4 | 2 of 4 |
| Road Products Inc. | 4 | 2 of 4 |
| Massana Construction, Inc. | 4 | 3 of 4 |
| Mowat Construction Company | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAR 2023 | 009953 | NCR region | Us 2 et al ncr guardrail update 21-23 | 4 of 4 | $3,133,333 | +22% |
| 11 JAN 2023 | 009915 | SWR region | Swr breakaway cable terminal replacement freeways 21-23 | 3 of 4 | $1,681,777 | +4.0% |
| 01 APR 2020 | 009532 | OR region | Sr 410 e of main ave to w of 166th ave e - install cable barrier | 4 of 4 | $525,333 | +37% |
| 11 MAR 2020 | 009528 | NCR region | I-90 silica rd to adams co line cable barrier upgrades | 1 of 5 | $3,050,777 | Low, 3.0% under the second |
| 04 MAR 2020 | 009525 | NCR region | Ncr 19-21 weathering steel guardrail rehabilitation | 4 of 4 | $1,393,939 | +62% |
| 03 APR 2019 | 009417 | SWR region | Swr breakway cable terminal replacement interstate | 3 of 3 | $837,777 | +38% |
| 20 MAR 2019 | 009404 | ER region | Us 2 et al 2019-21 er regionwide basic safety - guardrail | 2 of 2 | $2,299,229 | +36% |
| 06 MAR 2019 | 009392 | OR region | Sr3 et al. bct replacement and roadside safety | 3 of 3 | $3,141,593 | +75% |
| 09 JAN 2019 | 009359 | SCR region | Scr 17-19 region wide bct replacement and guardrail upgrade | 4 of 4 | $3,277,777 | +88% |
| 11 APR 2018 | 009246 | NCR region | Ncr 17-19 weathering steel guardrail rehabilitation | 1 of 4 | $977,654 | Low, 9.0% under the second |
| 19 APR 2017 | 009079 | ER region | Us 2 et al 2015-17 er regionwide basic safety - signing | 2 of 4 | $766,504 | +13% |
| 22 MAR 2017 | 009046 | NCR region | Ncr 15-17 safety implementation and sign update | 2 of 5 | $1,179,069 | +10% |
| 15 FEB 2017 | 009022 | OR region | Sr 3 and sr 16 olympic dr nw to sr 305 i/c install cable barrier | 2 of 4 | $1,936,639 | +16% |
| 14 DEC 2016 | 008987 | NCR region | Ncr guardrail update 15-17 | 4 of 5 | $675,576 | +21% |
| 30 MAR 2016 | 008860 | SCR region | Scr 15 - 17 region wide - median cable barrier and guardrail 16y001 | 3 of 3 | $2,487,654 | +46% |
| 11 MAR 2015 | 008719 | ER region | Sr 20 et al er - regionwide curve warning signing - chevron alignment 15z005 | 5 of 5 | $311,504 | +101% |
| 14 JAN 2015 | 008707 | ER region | Us 2 er region wide basic safety - signing 14z006 | 5 of 5 | $238,504 | +42% |
| 07 JAN 2015 | 008697 | ER region | I-90 er region wide basic safety - guardrail 14z008 | 2 of 4 | $469,964 | +18% |
| 03 DEC 2014 | 008682 | NCR region | Ncr guardrail update 13-15 15b001 | 2 of 4 | $627,907 | +43% |
| 24 JAN 2013 | 008411 | SCR region | Us 12 et al 2012 scr region wide safety | 4 of 4 | $514,138 | +36% |
| 05 DEC 2012 | 008388 | OR region | Olympic region redirectional landform mitigation | 3 of 3 | $210,316 | +17% |
| 26 APR 2012 | 008284 | NCR region | Us 97 north blewett pass safety improvements | 4 of 4 | $193,954 | +73% |
| 25 APR 2012 | 008278 | SWR region | Sr 14 clark co line to prindle vic. paver | 3 of 4 | $2,358,000 | +11% |
| 21 MAR 2012 | 008259 | OR region | 2011 olympic region basic safety restoration | 3 of 3 | $1,507,777 | +5.0% |
| 23 FEB 2012 | 008250 | NWR region | I-5 north 45th st vicinity sign bridge replacement | 4 of 5 | $422,000 | +12% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.