Dirt and Aggregate Interchange: WSDOT bid record
Dirt and Aggregate Interchange submitted 41 bids on Washington State DOT contracts in the data, from 06 DEC 2006 to 29 MAR 2023, and was the low bidder on 7 of them (17%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $6,133,029
- Latest bid
- 29 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2006 | 1 | 0 | 0% |
| 2007 | 1 | 1 | 100% |
| 2008 | 4 | 0 | 0% |
| 2009 | 6 | 0 | 0% |
| 2010 | 6 | 0 | 0% |
| 2011 | 3 | 2 | 67% |
| 2012 | 4 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 3 | 1 | 33% |
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 4 | 3 | 75% |
| 2020 | 3 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| SWR region | 10 | 2 | 20% |
| OR region | 9 | 1 | 11% |
| NCR region | 8 | 0 | 0% |
| NWR region | 5 | 1 | 20% |
| ER region | 5 | 2 | 40% |
| SCR region | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removing guardrail | LF | 29 | 12 (41%) | $5.00 | $5.00 | |
| Beam guardrail type 31 | LF | 26 | 11 (42%) | $22.00 | $26.32 | |
| Erosion and sediment control lead | DAY | 30 | 7 (23%) | $100.00 | $100.00 | |
| Beam guardrail buried terminal type 2 | LF | 9 | 6 (67%) | $40.00 | $42.00 | |
| Flexible guide post | EACH | 25 | 5 (20%) | $41.00 | $33.23 | |
| Beam guardrail post | EACH | 8 | 5 (63%) | $100.00 | $90.00 | |
| Roadway excavation including haul | CY | 14 | 4 (29%) | $42.50 | $20.00 | |
| High-tension cable barrier system (4 cable) | LF | 11 | 4 (36%) | $18.00 | $21.00 | |
| Silt fence | LF | 10 | 4 (40%) | $4.25 | $4.50 | |
| Beam guardrail type 1 | LF | 9 | 4 (44%) | $20.00 | $20.00 | |
| Beam guardrail type 31 non-flared terminal | EACH | 29 | 3 (10%) | $2,950.00 | $2,700.00 | |
| Beam guardrail type 31 - 8 FT. long post | LF | 16 | 3 (19%) | $24.00 | $25.84 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Coral Construction Company | 35 | 14 of 35 |
| Petersen Brothers, Inc. | 34 | 23 of 34 |
| Frank Gurney, Inc. | 21 | 16 of 21 |
| Massana Construction, Inc. | 4 | 4 of 4 |
| Thompson Bros. Excavating, Inc | 3 | 1 of 3 |
| Granite Northwest, Inc. DBA | 2 | 0 of 2 |
| Johansen Excavating, Inc. | 2 | 1 of 2 |
| Tri-State Construction, Inc. | 2 | 2 of 2 |
| Granite Construction Company | 2 | 0 of 2 |
| Kerr Contractors, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAR 2023 | 009953 | NCR region | Us 2 et al ncr guardrail update 21-23 | 3 of 4 | $3,097,777 | +20% |
| 11 JAN 2023 | 009915 | SWR region | Swr breakaway cable terminal replacement freeways 21-23 | 2 of 4 | $1,619,619 | 0.0% |
| 01 APR 2020 | 009532 | OR region | Sr 410 e of main ave to w of 166th ave e - install cable barrier | 3 of 4 | $489,494 | +27% |
| 11 MAR 2020 | 009528 | NCR region | I-90 silica rd to adams co line cable barrier upgrades | 5 of 5 | $4,193,333 | +37% |
| 04 MAR 2020 | 009525 | NCR region | Ncr 19-21 weathering steel guardrail rehabilitation | 3 of 4 | $1,053,297 | +23% |
| 03 APR 2019 | 009417 | SWR region | Swr breakway cable terminal replacement interstate | 1 of 3 | $608,597 | Low, 5.0% under the second |
| 20 MAR 2019 | 009404 | ER region | Us 2 et al 2019-21 er regionwide basic safety - guardrail | 1 of 2 | $1,690,857 | Low, 36% under the second |
| 06 MAR 2019 | 009392 | OR region | Sr3 et al. bct replacement and roadside safety | 1 of 3 | $1,798,798 | Low, 10% under the second |
| 09 JAN 2019 | 009359 | SCR region | Scr 17-19 region wide bct replacement and guardrail upgrade | 2 of 4 | $1,948,442 | +12% |
| 11 APR 2018 | 009246 | NCR region | Ncr 17-19 weathering steel guardrail rehabilitation | 2 of 4 | $1,065,432 | +9.0% |
| 15 FEB 2017 | 009022 | OR region | Sr 3 and sr 16 olympic dr nw to sr 305 i/c install cable barrier | 4 of 4 | $2,618,888 | +57% |
| 14 DEC 2016 | 008987 | NCR region | Ncr guardrail update 15-17 | 3 of 5 | $615,555 | +10% |
| 13 APR 2016 | 008878 | ER region | Us 2 et al 2015-17 eastern region regionwide basic safety-guardrail 16z011 | 1 of 2 | $685,555 | Low, 3.0% under the second |
| 30 MAR 2016 | 008860 | SCR region | Scr 15 - 17 region wide - median cable barrier and guardrail 16y001 | 2 of 3 | $1,947,778 | +14% |
| 07 JAN 2015 | 008697 | ER region | I-90 er region wide basic safety - guardrail 14z008 | 3 of 4 | $482,222 | +21% |
| 03 DEC 2014 | 008682 | NCR region | Ncr guardrail update 13-15 15b001 | 4 of 4 | $653,333 | +49% |
| 05 DEC 2012 | 008388 | OR region | Olympic region redirectional landform mitigation | 2 of 3 | $188,888 | +5.0% |
| 25 APR 2012 | 008278 | SWR region | Sr 14 clark co line to prindle vic. paver | 2 of 4 | $2,278,864 | +7.0% |
| 21 MAR 2012 | 008259 | OR region | 2011 olympic region basic safety restoration | 2 of 3 | $1,438,818 | 0.0% |
| 07 MAR 2012 | 008246 | SWR region | Sr 501 ridgefield interchange stage ii - roadway improvements | 6 of 11 | $2,986,767 | +6.0% |
| 21 APR 2011 | 008120 | NCR region | Nc region guardrail update 2011 | 3 of 3 | $378,897 | +27% |
| 13 APR 2011 | 008110 | SCR region | I-82 et al. scr region wide safety - shield redirectional landforms | 1 of 4 | $309,457 | Low, 16% under the second |
| 23 MAR 2011 | 008100 | SWR region | Southwest region i-5 and i-205 median bridge column protection | 1 of 4 | $665,994 | Low, 6.0% under the second |
| 31 MAR 2010 | 007914 | OR region | Us 101 et al olympic region cable barrier | 3 of 3 | $929,967 | +21% |
| 18 MAR 2010 | 007899 | ER region | Us 395 wandermere to vicinity half moon rd - median barrier | 3 of 3 | $658,888 | +22% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.