Petersen Brothers, Inc.: WSDOT bid record
Petersen Brothers, Inc. submitted 57 bids on Washington State DOT contracts in the data, from 27 JAN 2000 to 11 JAN 2023, and was the low bidder on 17 of them (30%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $13,046,735
- Latest bid
- 11 JAN 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 1 | 100% |
| 2001 | 1 | 0 | 0% |
| 2002 | 1 | 1 | 100% |
| 2003 | 3 | 0 | 0% |
| 2004 | 4 | 1 | 25% |
| 2005 | 2 | 0 | 0% |
| 2006 | 2 | 1 | 50% |
| 2007 | 3 | 1 | 33% |
| 2008 | 5 | 3 | 60% |
| 2009 | 7 | 2 | 29% |
| 2010 | 7 | 1 | 14% |
| 2011 | 3 | 1 | 33% |
| 2012 | 4 | 3 | 75% |
| 2013 | 1 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 2 | 1 | 50% |
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 3 | 0 | 0% |
| 2020 | 3 | 1 | 33% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NCR region | 16 | 4 | 25% |
| OR region | 14 | 9 | 64% |
| SWR region | 10 | 1 | 10% |
| NWR region | 7 | 1 | 14% |
| SCR region | 6 | 2 | 33% |
| ER region | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Beam guardrail type 31 non-flared terminal | EACH | 25 | 19 (76%) | $2,345.00 | $2,700.00 | |
| Removing guardrail anchor | EACH | 33 | 15 (45%) | $190.00 | $215.00 | |
| Beam guardrail anchor type 10 | EACH | 20 | 13 (65%) | $733.33 | $894.00 | |
| Flexible guide post | EACH | 31 | 11 (35%) | $29.45 | $33.23 | |
| Beam guardrail flared terminal | EACH | 20 | 11 (55%) | $1,660.00 | $1,850.00 | |
| Removing guardrail | LF | 38 | 10 (26%) | $4.07 | $5.00 | |
| Crushed surfacing base course | TON | 19 | 10 (53%) | $39.35 | $26.44 | |
| Beam guardrail non-flared terminal | EACH | 16 | 9 (56%) | $2,010.00 | $2,200.00 | |
| Beam guardrail transition section type 21 | EACH | 9 | 9 (100%) | $2,990.79 | $3,355.00 | |
| Inlet protection | EACH | 16 | 8 (50%) | $90.00 | $95.00 | |
| Precast concrete barrier type 2 | LF | 11 | 6 (55%) | $35.80 | $40.00 | |
| Sequential arrow sign | HR | 8 | 6 (75%) | $3.62 | $3.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Coral Construction Company | 45 | 22 of 45 |
| Dirt and Aggregate Interchange | 34 | 11 of 34 |
| Frank Gurney, Inc. | 30 | 18 of 30 |
| Construction Ahead, Inc. DBA | 8 | 4 of 8 |
| Massana Construction, Inc. | 5 | 3 of 5 |
| Tri-State Construction, Inc. | 4 | 2 of 4 |
| Mowat Construction Company | 3 | 0 of 3 |
| C.A. Carey Corporation | 3 | 0 of 3 |
| Dirt and Aggregate | 2 | 0 of 2 |
| Sharp-Line Industries, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 JAN 2023 | 009915 | SWR region | Swr breakaway cable terminal replacement freeways 21-23 | 4 of 4 | $2,531,323 | +56% |
| 01 APR 2020 | 009532 | OR region | Sr 410 e of main ave to w of 166th ave e - install cable barrier | 1 of 4 | $384,623 | Low, 19% under the second |
| 11 MAR 2020 | 009528 | NCR region | I-90 silica rd to adams co line cable barrier upgrades | 3 of 5 | $3,551,709 | +16% |
| 04 MAR 2020 | 009525 | NCR region | Ncr 19-21 weathering steel guardrail rehabilitation | 2 of 4 | $1,002,767 | +17% |
| 03 APR 2019 | 009417 | SWR region | Swr breakway cable terminal replacement interstate | 2 of 3 | $640,326 | +5.0% |
| 06 MAR 2019 | 009392 | OR region | Sr3 et al. bct replacement and roadside safety | 2 of 3 | $1,978,050 | +10% |
| 09 JAN 2019 | 009359 | SCR region | Scr 17-19 region wide bct replacement and guardrail upgrade | 3 of 4 | $1,964,574 | +13% |
| 11 APR 2018 | 009246 | NCR region | Ncr 17-19 weathering steel guardrail rehabilitation | 4 of 4 | $1,170,639 | +20% |
| 15 FEB 2017 | 009022 | OR region | Sr 3 and sr 16 olympic dr nw to sr 305 i/c install cable barrier | 3 of 4 | $2,223,141 | +34% |
| 14 DEC 2016 | 008987 | NCR region | Ncr guardrail update 15-17 | 5 of 5 | $709,592 | +27% |
| 30 MAR 2016 | 008860 | SCR region | Scr 15 - 17 region wide - median cable barrier and guardrail 16y001 | 1 of 3 | $1,706,106 | Low, 14% under the second |
| 07 JAN 2015 | 008697 | ER region | I-90 er region wide basic safety - guardrail 14z008 | 4 of 4 | $506,682 | +27% |
| 03 DEC 2014 | 008682 | NCR region | Ncr guardrail update 13-15 15b001 | 3 of 4 | $641,774 | +46% |
| 24 JAN 2013 | 008411 | SCR region | Us 12 et al 2012 scr region wide safety | 3 of 4 | $383,269 | +2.0% |
| 05 DEC 2012 | 008388 | OR region | Olympic region redirectional landform mitigation | 1 of 3 | $179,962 | Low, 5.0% under the second |
| 26 APR 2012 | 008284 | NCR region | Us 97 north blewett pass safety improvements | 1 of 4 | $111,909 | Low, 20% under the second |
| 04 APR 2012 | 008263 | OR region | I-5 mounts rd vicinity to berkeley st median barrier replacement | 2 of 4 | $1,197,225 | +19% |
| 21 MAR 2012 | 008259 | OR region | 2011 olympic region basic safety restoration | 1 of 3 | $1,438,609 | Low, 0.0% under the second |
| 21 APR 2011 | 008120 | NCR region | Nc region guardrail update 2011 | 1 of 3 | $297,317 | Low, 5.0% under the second |
| 13 APR 2011 | 008110 | SCR region | I-82 et al. scr region wide safety - shield redirectional landforms | 4 of 4 | $378,431 | +22% |
| 23 MAR 2011 | 008100 | SWR region | Southwest region i-5 and i-205 median bridge column protection | 2 of 4 | $703,055 | +6.0% |
| 31 MAR 2010 | 007914 | OR region | Us 101 et al olympic region cable barrier | 2 of 3 | $859,574 | +12% |
| 18 MAR 2010 | 007899 | ER region | Us 395 wandermere to vicinity half moon rd - median barrier | 2 of 3 | $580,516 | +7.0% |
| 17 MAR 2010 | 007901 | SCR region | I-5 et al statewide cable barrier | 2 of 5 | $1,430,380 | +6.0% |
| 10 MAR 2010 | 007902 | NWR region | Sr 169 and sr 900 roadside safety improvements | 3 of 4 | $733,551 | +15% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.