Frank Gurney, Inc.: WSDOT bid record
Frank Gurney, Inc. submitted 32 bids on Washington State DOT contracts in the data, from 27 JAN 2000 to 29 MAR 2023, and was the low bidder on 13 of them (41%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $10,476,091
- Latest bid
- 29 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2001 | 1 | 0 | 0% |
| 2002 | 1 | 0 | 0% |
| 2003 | 1 | 1 | 100% |
| 2004 | 2 | 1 | 50% |
| 2005 | 1 | 1 | 100% |
| 2006 | 1 | 1 | 100% |
| 2007 | 2 | 1 | 50% |
| 2008 | 2 | 0 | 0% |
| 2009 | 3 | 2 | 67% |
| 2010 | 3 | 1 | 33% |
| 2011 | 3 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2014 | 1 | 1 | 100% |
| 2015 | 1 | 1 | 100% |
| 2016 | 2 | 1 | 50% |
| 2018 | 1 | 0 | 0% |
| 2019 | 1 | 1 | 100% |
| 2020 | 2 | 1 | 50% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NCR region | 15 | 7 | 47% |
| SWR region | 6 | 1 | 17% |
| SCR region | 5 | 1 | 20% |
| ER region | 5 | 4 | 80% |
| NWR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removing guardrail | LF | 24 | 14 (58%) | $3.38 | $5.00 | |
| Removing guardrail anchor | EACH | 22 | 13 (59%) | $157.50 | $215.00 | |
| Flexible guide post | EACH | 22 | 10 (45%) | $30.00 | $33.23 | |
| Beam guardrail type 31 | LF | 12 | 7 (58%) | $19.95 | $26.32 | |
| Raising existing beam guardrail | LF | 10 | 7 (70%) | $2.95 | $4.70 | |
| Beam guardrail type 1 | LF | 13 | 6 (46%) | $18.00 | $20.00 | |
| Beam guardrail flared terminal | EACH | 13 | 5 (38%) | $1,775.00 | $1,850.00 | |
| Beam guardrail non-flared terminal | EACH | 10 | 5 (50%) | $2,050.00 | $2,200.00 | |
| Beam guardrail type 31 - 8 FT. long post | LF | 9 | 5 (56%) | $21.50 | $25.84 | |
| Beam guardrail type 31 non-flared terminal | EACH | 13 | 4 (31%) | $2,400.00 | $2,700.00 | |
| Extruded curb | LF | 10 | 4 (40%) | $25.00 | $12.00 | |
| Beam guardrail buried terminal type 1 | EACH | 7 | 4 (57%) | $1,000.00 | $1,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Petersen Brothers, Inc. | 30 | 12 of 30 |
| Coral Construction Company | 26 | 7 of 26 |
| Dirt and Aggregate Interchange | 21 | 5 of 21 |
| Construction Ahead, Inc. DBA | 3 | 2 of 3 |
| Dirt and Aggregate | 2 | 0 of 2 |
| James Dean Construction, Inc. | 1 | 1 of 1 |
| Thompson Bros. Excavating, Inc | 1 | 1 of 1 |
| Johansen Excavating, Inc. | 1 | 0 of 1 |
| Granite Northwest, Inc. | 1 | 0 of 1 |
| RMD Holdings, LTD. DBA Nationw | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAR 2023 | 009953 | NCR region | Us 2 et al ncr guardrail update 21-23 | 2 of 4 | $3,026,164 | +17% |
| 11 MAR 2020 | 009528 | NCR region | I-90 silica rd to adams co line cable barrier upgrades | 4 of 5 | $4,137,624 | +36% |
| 04 MAR 2020 | 009525 | NCR region | Ncr 19-21 weathering steel guardrail rehabilitation | 1 of 4 | $859,585 | Low, 17% under the second |
| 09 JAN 2019 | 009359 | SCR region | Scr 17-19 region wide bct replacement and guardrail upgrade | 1 of 4 | $1,746,060 | Low, 12% under the second |
| 11 APR 2018 | 009246 | NCR region | Ncr 17-19 weathering steel guardrail rehabilitation | 3 of 4 | $1,128,170 | +15% |
| 14 DEC 2016 | 008987 | NCR region | Ncr guardrail update 15-17 | 1 of 5 | $557,489 | Low, 4.0% under the second |
| 13 APR 2016 | 008878 | ER region | Us 2 et al 2015-17 eastern region regionwide basic safety-guardrail 16z011 | 2 of 2 | $706,205 | +3.0% |
| 07 JAN 2015 | 008697 | ER region | I-90 er region wide basic safety - guardrail 14z008 | 1 of 4 | $397,460 | Low, 18% under the second |
| 03 DEC 2014 | 008682 | NCR region | Ncr guardrail update 13-15 15b001 | 1 of 4 | $439,700 | Low, 43% under the second |
| 24 JAN 2013 | 008411 | SCR region | Us 12 et al 2012 scr region wide safety | 2 of 4 | $377,528 | 0.0% |
| 26 APR 2012 | 008284 | NCR region | Us 97 north blewett pass safety improvements | 3 of 4 | $145,889 | +30% |
| 21 APR 2011 | 008120 | NCR region | Nc region guardrail update 2011 | 2 of 3 | $313,504 | +5.0% |
| 13 APR 2011 | 008110 | SCR region | I-82 et al. scr region wide safety - shield redirectional landforms | 2 of 4 | $359,232 | +16% |
| 23 MAR 2011 | 008100 | SWR region | Southwest region i-5 and i-205 median bridge column protection | 3 of 4 | $707,051 | +6.0% |
| 18 MAR 2010 | 007899 | ER region | Us 395 wandermere to vicinity half moon rd - median barrier | 1 of 3 | $541,792 | Low, 7.0% under the second |
| 17 MAR 2010 | 007901 | SCR region | I-5 et al statewide cable barrier | 3 of 5 | $1,450,972 | +8.0% |
| 21 JAN 2010 | 007876 | SWR region | Sr 142 sr14 to us97 roadside safety phase 2 | 4 of 8 | $809,089 | +12% |
| 19 MAR 2009 | 007696 | ER region | 2007-2009 eastern region roadside safety improvements | 1 of 4 | $2,355,049 | Low, 0.0% under the second |
| 05 MAR 2009 | 007684 | NCR region | Sr 26 othello vicinity roadside safety improvements | 1 of 4 | $239,176 | Low, 0.0% under the second |
| 04 MAR 2009 | 007687 | NWR region | Sr 530 & sr 534 roadside safety improvements | 2 of 4 | $577,521 | +11% |
| 05 MAR 2008 | 007498 | SWR region | Sr 7 lewis county roadside safety improvements | 4 of 4 | $450,016 | +11% |
| 05 MAR 2008 | 007499 | SWR region | Sr 432 roadside safety improvements | 3 of 4 | $282,021 | +23% |
| 15 FEB 2007 | 007270 | ER region | Sr 21 et al 2005/07 eastern region bst safety restoration | 1 of 2 | $1,239,614 | Low, 10% under the second |
| 10 JAN 2007 | 007225 | SCR region | Us 12 & sr 410 wildcat cr. to i-82 and morse cr. to us 12 - roadside safety | 2 of 3 | $759,527 | +3.0% |
| 06 DEC 2006 | 007233 | SWR region | Sr 14 columbia river gorge guardrail upgrade | 1 of 4 | $316,320 | Low, 9.0% under the second |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.