Frank Gurney, Inc.: WSDOT bid record

Frank Gurney, Inc. submitted 32 bids on Washington State DOT contracts in the data, from 27 JAN 2000 to 29 MAR 2023, and was the low bidder on 13 of them (41%). When it was not low, its total sat a median +11% above the low bid.

Owner
Washington State DOT
Low bid volume
$10,476,091
Latest bid
29 MAR 2023
Data through
07 OCT 2026
32Bids
13Low bids
41Win rate, percent
+11%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2000100%
2001100%
2002100%
200311100%
20042150%
200511100%
200611100%
20072150%
2008200%
20093267%
20103133%
2011300%
2012100%
2013100%
201411100%
201511100%
20162150%
2018100%
201911100%
20202150%
2023100%
Frank Gurney, Inc., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NCR region15747%
SWR region6117%
SCR region5120%
ER region5480%
NWR region100%
Frank Gurney, Inc., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Removing guardrailLF2414 (58%)$3.38$5.00
Removing guardrail anchorEACH2213 (59%)$157.50$215.00
Flexible guide postEACH2210 (45%)$30.00$33.23
Beam guardrail type 31LF127 (58%)$19.95$26.32
Raising existing beam guardrailLF107 (70%)$2.95$4.70
Beam guardrail type 1LF136 (46%)$18.00$20.00
Beam guardrail flared terminalEACH135 (38%)$1,775.00$1,850.00
Beam guardrail non-flared terminalEACH105 (50%)$2,050.00$2,200.00
Beam guardrail type 31 - 8 FT. long postLF95 (56%)$21.50$25.84
Beam guardrail type 31 non-flared terminalEACH134 (31%)$2,400.00$2,700.00
Extruded curbLF104 (40%)$25.00$12.00
Beam guardrail buried terminal type 1EACH74 (57%)$1,000.00$1,000.00
Frank Gurney, Inc., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Petersen Brothers, Inc.3012 of 30
Coral Construction Company267 of 26
Dirt and Aggregate Interchange215 of 21
Construction Ahead, Inc. DBA32 of 3
Dirt and Aggregate20 of 2
James Dean Construction, Inc.11 of 1
Thompson Bros. Excavating, Inc11 of 1
Johansen Excavating, Inc.10 of 1
Granite Northwest, Inc.10 of 1
RMD Holdings, LTD. DBA Nationw10 of 1
Frank Gurney, Inc., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
29 MAR 2023009953NCR regionUs 2 et al ncr guardrail update 21-232 of 4$3,026,164+17%
11 MAR 2020009528NCR regionI-90 silica rd to adams co line cable barrier upgrades4 of 5$4,137,624+36%
04 MAR 2020009525NCR regionNcr 19-21 weathering steel guardrail rehabilitation1 of 4$859,585Low, 17% under the second
09 JAN 2019009359SCR regionScr 17-19 region wide bct replacement and guardrail upgrade1 of 4$1,746,060Low, 12% under the second
11 APR 2018009246NCR regionNcr 17-19 weathering steel guardrail rehabilitation3 of 4$1,128,170+15%
14 DEC 2016008987NCR regionNcr guardrail update 15-171 of 5$557,489Low, 4.0% under the second
13 APR 2016008878ER regionUs 2 et al 2015-17 eastern region regionwide basic safety-guardrail 16z0112 of 2$706,205+3.0%
07 JAN 2015008697ER regionI-90 er region wide basic safety - guardrail 14z0081 of 4$397,460Low, 18% under the second
03 DEC 2014008682NCR regionNcr guardrail update 13-15 15b0011 of 4$439,700Low, 43% under the second
24 JAN 2013008411SCR regionUs 12 et al 2012 scr region wide safety2 of 4$377,5280.0%
26 APR 2012008284NCR regionUs 97 north blewett pass safety improvements3 of 4$145,889+30%
21 APR 2011008120NCR regionNc region guardrail update 20112 of 3$313,504+5.0%
13 APR 2011008110SCR regionI-82 et al. scr region wide safety - shield redirectional landforms2 of 4$359,232+16%
23 MAR 2011008100SWR regionSouthwest region i-5 and i-205 median bridge column protection3 of 4$707,051+6.0%
18 MAR 2010007899ER regionUs 395 wandermere to vicinity half moon rd - median barrier1 of 3$541,792Low, 7.0% under the second
17 MAR 2010007901SCR regionI-5 et al statewide cable barrier3 of 5$1,450,972+8.0%
21 JAN 2010007876SWR regionSr 142 sr14 to us97 roadside safety phase 24 of 8$809,089+12%
19 MAR 2009007696ER region2007-2009 eastern region roadside safety improvements1 of 4$2,355,049Low, 0.0% under the second
05 MAR 2009007684NCR regionSr 26 othello vicinity roadside safety improvements1 of 4$239,176Low, 0.0% under the second
04 MAR 2009007687NWR regionSr 530 & sr 534 roadside safety improvements2 of 4$577,521+11%
05 MAR 2008007498SWR regionSr 7 lewis county roadside safety improvements4 of 4$450,016+11%
05 MAR 2008007499SWR regionSr 432 roadside safety improvements3 of 4$282,021+23%
15 FEB 2007007270ER regionSr 21 et al 2005/07 eastern region bst safety restoration1 of 2$1,239,614Low, 10% under the second
10 JAN 2007007225SCR regionUs 12 & sr 410 wildcat cr. to i-82 and morse cr. to us 12 - roadside safety2 of 3$759,527+3.0%
06 DEC 2006007233SWR regionSr 14 columbia river gorge guardrail upgrade1 of 4$316,320Low, 9.0% under the second
Frank Gurney, Inc.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy