Construction Ahead, Inc. DBA: WSDOT bid record

Construction Ahead, Inc. DBA submitted 29 bids on Washington State DOT contracts in the data, from 09 DEC 2004 to 08 MAR 2023, and was the low bidder on 10 of them (34%). When it was not low, its total sat a median +17% above the low bid.

Owner
Washington State DOT
Low bid volume
$6,552,990
Latest bid
08 MAR 2023
Data through
07 OCT 2026
29Bids
10Low bids
34Win rate, percent
+17%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2004100%
200711100%
20082150%
2009100%
2010100%
20122150%
201311100%
20152150%
2016300%
2017200%
2018100%
2019200%
20202150%
20215240%
202211100%
20232150%
Construction Ahead, Inc. DBA, WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NCR region9222%
OR region6233%
ER region6233%
NWR region4125%
SWR region3267%
SCR region11100%
Construction Ahead, Inc. DBA, WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Paint lineLF54 (80%)$0.18$0.25
Inlet protectionEACH73 (43%)$165.00$95.00
Precast concrete barrier type 2LF52 (40%)$33.60$40.00
Portable changeable message signHR61 (17%)$10.00$5.12
Construction Ahead, Inc. DBA, WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Coral Construction Company103 of 10
Petersen Brothers, Inc.84 of 8
Road Products Inc.83 of 8
Granite Construction Company63 of 6
Sharp-Line Industries, Inc.51 of 5
Massana Construction, Inc.42 of 4
KT Contracting Co., Inc.42 of 4
Frank Gurney, Inc.31 of 3
North Star Enterprises 1, Inc.32 of 3
Transportation Systems, Inc.31 of 3
Construction Ahead, Inc. DBA, WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
08 MAR 2023009944ER regionSr 26 sr 261 to colfax install shoulder rumble strip1 of 3$318,727Low, 9.0% under the second
19 JAN 2023009912NWR regionUs 2 et al northwest region hma crack seal and pavement repair2 of 3$2,597,696+20%
13 APR 2022009797OR region2021 or region wide safety features signing1 of 2$716,052Low, 3.0% under the second
28 APR 2021009678SWR regionSw region wide crack seal1 of 4$856,159Low, 19% under the second
17 MAR 2021009659NWR regionSr 18 et al northwest region hma crack seal and pavement repair1 of 2$1,923,581Low, 106% under the second
17 MAR 2021009658OR regionOlympic region region wide crack sealing3 of 4$1,121,853+16%
18 FEB 2021009651NWR regionSr 18 weyerhaeuser way vic to sr164 vic barrier replacement3 of 3$2,671,268+8.0%
13 JAN 2021009631NCR regionUs 2 et al ncr 19-21 regionwide curve warning sign update3 of 5$413,298+9.0%
01 APR 2020009536ER regionUs 195 install shoulder rumble strip3 of 4$719,013+51%
20 FEB 2020009524NCR regionNcr sign update 19-211 of 3$424,783Low, 23% under the second
20 MAR 2019009408NWR regionSr 20 lunz rd vic & cascade dr to granite cr rumble strip2 of 2$993,467+49%
27 FEB 2019009389SWR regionI-5 rush rd. to 13th st. crack sealing2 of 3$651,302+28%
28 MAR 2018009240ER regionSr 20 et al er curve warning sign update 2017-193 of 6$790,124+8.0%
19 APR 2017009079ER regionUs 2 et al 2015-17 er regionwide basic safety - signing3 of 4$792,890+17%
22 MAR 2017009046NCR regionNcr 15-17 safety implementation and sign update4 of 5$1,293,598+20%
14 DEC 2016008987NCR regionNcr guardrail update 15-172 of 5$580,621+4.0%
27 APR 2016008892NCR regionNcr 15-17 rumble strips 16b0062 of 3$840,004+6.0%
20 APR 2016008875NCR regionNcr regionwide curve warning signing 16b0053 of 5$641,503+38%
11 MAR 2015008719ER regionSr 20 et al er - regionwide curve warning signing - chevron alignment 15z0052 of 5$159,254+3.0%
14 JAN 2015008707ER regionUs 2 er region wide basic safety - signing 14z0061 of 5$168,504Low, 17% under the second
24 JAN 2013008411SCR regionUs 12 et al 2012 scr region wide safety1 of 4$376,898Low, 0.0% under the second
26 APR 2012008284NCR regionUs 97 north blewett pass safety improvements2 of 4$133,935+20%
04 APR 2012008263OR regionI-5 mounts rd vicinity to berkeley st median barrier replacement1 of 4$1,008,539Low, 19% under the second
06 JAN 2010007865OR regionI-5 berkeley st to 47th ave sw median barrier replacement4 of 4$1,128,974+32%
25 MAR 2009007695OR regionSr 16 tacoma narrows bridge crossover barrier mp 4.84 & 8.636 of 6$292,999+47%
Construction Ahead, Inc. DBA: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy