Construction Ahead, Inc. DBA: WSDOT bid record
Construction Ahead, Inc. DBA submitted 29 bids on Washington State DOT contracts in the data, from 09 DEC 2004 to 08 MAR 2023, and was the low bidder on 10 of them (34%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $6,552,990
- Latest bid
- 08 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2004 | 1 | 0 | 0% |
| 2007 | 1 | 1 | 100% |
| 2008 | 2 | 1 | 50% |
| 2009 | 1 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2012 | 2 | 1 | 50% |
| 2013 | 1 | 1 | 100% |
| 2015 | 2 | 1 | 50% |
| 2016 | 3 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 2 | 0 | 0% |
| 2020 | 2 | 1 | 50% |
| 2021 | 5 | 2 | 40% |
| 2022 | 1 | 1 | 100% |
| 2023 | 2 | 1 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NCR region | 9 | 2 | 22% |
| OR region | 6 | 2 | 33% |
| ER region | 6 | 2 | 33% |
| NWR region | 4 | 1 | 25% |
| SWR region | 3 | 2 | 67% |
| SCR region | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint line | LF | 5 | 4 (80%) | $0.18 | $0.25 | |
| Inlet protection | EACH | 7 | 3 (43%) | $165.00 | $95.00 | |
| Precast concrete barrier type 2 | LF | 5 | 2 (40%) | $33.60 | $40.00 | |
| Portable changeable message sign | HR | 6 | 1 (17%) | $10.00 | $5.12 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Coral Construction Company | 10 | 3 of 10 |
| Petersen Brothers, Inc. | 8 | 4 of 8 |
| Road Products Inc. | 8 | 3 of 8 |
| Granite Construction Company | 6 | 3 of 6 |
| Sharp-Line Industries, Inc. | 5 | 1 of 5 |
| Massana Construction, Inc. | 4 | 2 of 4 |
| KT Contracting Co., Inc. | 4 | 2 of 4 |
| Frank Gurney, Inc. | 3 | 1 of 3 |
| North Star Enterprises 1, Inc. | 3 | 2 of 3 |
| Transportation Systems, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAR 2023 | 009944 | ER region | Sr 26 sr 261 to colfax install shoulder rumble strip | 1 of 3 | $318,727 | Low, 9.0% under the second |
| 19 JAN 2023 | 009912 | NWR region | Us 2 et al northwest region hma crack seal and pavement repair | 2 of 3 | $2,597,696 | +20% |
| 13 APR 2022 | 009797 | OR region | 2021 or region wide safety features signing | 1 of 2 | $716,052 | Low, 3.0% under the second |
| 28 APR 2021 | 009678 | SWR region | Sw region wide crack seal | 1 of 4 | $856,159 | Low, 19% under the second |
| 17 MAR 2021 | 009659 | NWR region | Sr 18 et al northwest region hma crack seal and pavement repair | 1 of 2 | $1,923,581 | Low, 106% under the second |
| 17 MAR 2021 | 009658 | OR region | Olympic region region wide crack sealing | 3 of 4 | $1,121,853 | +16% |
| 18 FEB 2021 | 009651 | NWR region | Sr 18 weyerhaeuser way vic to sr164 vic barrier replacement | 3 of 3 | $2,671,268 | +8.0% |
| 13 JAN 2021 | 009631 | NCR region | Us 2 et al ncr 19-21 regionwide curve warning sign update | 3 of 5 | $413,298 | +9.0% |
| 01 APR 2020 | 009536 | ER region | Us 195 install shoulder rumble strip | 3 of 4 | $719,013 | +51% |
| 20 FEB 2020 | 009524 | NCR region | Ncr sign update 19-21 | 1 of 3 | $424,783 | Low, 23% under the second |
| 20 MAR 2019 | 009408 | NWR region | Sr 20 lunz rd vic & cascade dr to granite cr rumble strip | 2 of 2 | $993,467 | +49% |
| 27 FEB 2019 | 009389 | SWR region | I-5 rush rd. to 13th st. crack sealing | 2 of 3 | $651,302 | +28% |
| 28 MAR 2018 | 009240 | ER region | Sr 20 et al er curve warning sign update 2017-19 | 3 of 6 | $790,124 | +8.0% |
| 19 APR 2017 | 009079 | ER region | Us 2 et al 2015-17 er regionwide basic safety - signing | 3 of 4 | $792,890 | +17% |
| 22 MAR 2017 | 009046 | NCR region | Ncr 15-17 safety implementation and sign update | 4 of 5 | $1,293,598 | +20% |
| 14 DEC 2016 | 008987 | NCR region | Ncr guardrail update 15-17 | 2 of 5 | $580,621 | +4.0% |
| 27 APR 2016 | 008892 | NCR region | Ncr 15-17 rumble strips 16b006 | 2 of 3 | $840,004 | +6.0% |
| 20 APR 2016 | 008875 | NCR region | Ncr regionwide curve warning signing 16b005 | 3 of 5 | $641,503 | +38% |
| 11 MAR 2015 | 008719 | ER region | Sr 20 et al er - regionwide curve warning signing - chevron alignment 15z005 | 2 of 5 | $159,254 | +3.0% |
| 14 JAN 2015 | 008707 | ER region | Us 2 er region wide basic safety - signing 14z006 | 1 of 5 | $168,504 | Low, 17% under the second |
| 24 JAN 2013 | 008411 | SCR region | Us 12 et al 2012 scr region wide safety | 1 of 4 | $376,898 | Low, 0.0% under the second |
| 26 APR 2012 | 008284 | NCR region | Us 97 north blewett pass safety improvements | 2 of 4 | $133,935 | +20% |
| 04 APR 2012 | 008263 | OR region | I-5 mounts rd vicinity to berkeley st median barrier replacement | 1 of 4 | $1,008,539 | Low, 19% under the second |
| 06 JAN 2010 | 007865 | OR region | I-5 berkeley st to 47th ave sw median barrier replacement | 4 of 4 | $1,128,974 | +32% |
| 25 MAR 2009 | 007695 | OR region | Sr 16 tacoma narrows bridge crossover barrier mp 4.84 & 8.63 | 6 of 6 | $292,999 | +47% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.