Max J. Kuney Company submitted 43 bids on Washington State DOT contracts in the data, from 01 MAR 2000 to 23 FEB 2023, and was the low bidder on 10 of them (23%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $285,503,671
- Latest bid
- 23 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 2 | 0 | 0% |
| 2001 | 4 | 1 | 25% |
| 2002 | 1 | 0 | 0% |
| 2003 | 1 | 0 | 0% |
| 2004 | 2 | 1 | 50% |
| 2005 | 2 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2007 | 3 | 1 | 33% |
| 2008 | 1 | 1 | 100% |
| 2010 | 2 | 1 | 50% |
| 2011 | 3 | 0 | 0% |
| 2012 | 4 | 0 | 0% |
| 2013 | 3 | 1 | 33% |
| 2015 | 1 | 0 | 0% |
| 2017 | 2 | 1 | 50% |
| 2019 | 5 | 1 | 20% |
| 2020 | 3 | 0 | 0% |
| 2021 | 1 | 1 | 100% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 14 | 2 | 14% |
| ER region | 10 | 5 | 50% |
| SCR region | 8 | 2 | 25% |
| OR region | 7 | 0 | 0% |
| SWR region | 3 | 1 | 33% |
| Region 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Crushed surfacing base course | TON | 30 | 12 (40%) | $20.00 | $26.44 | |
| Steel reinf. bar for bridge | LB | 26 | 11 (42%) | $1.00 | $1.00 | |
| Traffic barrier | LF | 24 | 10 (42%) | $137.50 | $140.00 | |
| Construction signs class A | SF | 28 | 9 (32%) | $18.00 | $16.21 | |
| Extruded curb | LF | 22 | 9 (41%) | $7.62 | $12.00 | |
| Concrete class 4000 for bridge | CY | 26 | 8 (31%) | $737.50 | $611.24 | |
| Erosion and sediment control lead | DAY | 21 | 8 (38%) | $50.00 | $100.00 | |
| Roadway excavation including haul | CY | 26 | 7 (27%) | $10.00 | $20.00 | |
| Inlet protection | EACH | 26 | 7 (27%) | $80.00 | $95.00 | |
| Gravel backfill for drain | CY | 24 | 7 (29%) | $42.00 | $38.00 | |
| Gravel backfill for wall | CY | 24 | 7 (29%) | $32.50 | $36.00 | |
| Training | HR | 22 | 7 (32%) | $2.50 | $4.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mowat Construction Company | 14 | 10 of 14 |
| Guy F. Atkinson Construction, | 13 | 6 of 13 |
| Scarsella Bros., Inc. | 11 | 7 of 11 |
| Kiewit Pacific Co. | 8 | 0 of 8 |
| Tri-State Construction, Inc. | 7 | 4 of 7 |
| Wilder Construction Company | 7 | 2 of 7 |
| Cascade Bridge LLC | 7 | 5 of 7 |
| Hamilton Construction Co. | 7 | 1 of 7 |
| N.A. Degerstrom, Inc. | 5 | 1 of 5 |
| C.A. Carey Corporation | 5 | 2 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 FEB 2023 | 009925 | ER region | Us 395 nsc spokane river crossing | 1 of 4 | $68,633,025 | Low |
| 09 FEB 2022 | 009763 | OR region | Sr 16 and sr 302 (spur) purdy creek remove fish barriers and paving | 11 of 11 | $38,799,785 | +51% |
| 13 JAN 2021 | 009623 | ER region | Sr290/barker road bnsf grade separation spokane county - mp 12.5 | 1 of 5 | $11,637,134 | Low, 8.0% under the second |
| 01 APR 2020 | 009530 | SCR region | I-82 sr 397 interchange eb - bridge repair | 3 of 4 | $719,000 | +64% |
| 20 FEB 2020 | 009516 | OR region | Us 101 bagley and siebert creeks remove fish barriers | 3 of 8 | $27,071,381 | +24% |
| 23 JAN 2020 | 009509 | ER region | Sr 290 spokane river e trent br replace bridge | 2 of 4 | $21,701,400 | +8.0% |
| 24 APR 2019 | 009426 | ER region | Sr 21 w fork san poil bridge- replace structure | 2 of 4 | $6,385,007 | +13% |
| 27 MAR 2019 | 009398 | OR region | Us 101 west jefferson county remove fish barriers | 4 of 7 | $17,681,680 | +14% |
| 13 MAR 2019 | 009385 | SCR region | I-90 bullfrog rd vic - concrete rehab, bridge deck rehab & painting | 1 of 5 | $14,801,299 | Low, 10% under the second |
| 24 JAN 2019 | 009360 | OR region | Sr 107 chehalis river bridge structural rehabilitation & painting | 2 of 10 | $19,602,475 | 0.0% |
| 09 JAN 2019 | 009357 | NWR region | Sr 509 & sr 518 s 192 st to normandy pk & sr 509 to sr 99 paving & ada & deck & seismic | 5 of 6 | $10,547,100 | +17% |
| 19 APR 2017 | 009058 | SCR region | I-82 columbia river bridge eb - truss deck replacement | 2 of 3 | $9,467,595 | +16% |
| 25 JAN 2017 | 009011 | ER region | Us 395 nsc freya st - structures | 1 of 7 | $7,655,561 | Low, 7.0% under the second |
| 01 APR 2015 | 008715 | SCR region | I-90 keechelus dam to stampede pass phase 2a - add lanes / build wildlife bridges 14y015 | 3 of 6 | $76,094,182 | +5.0% |
| 11 DEC 2013 | 008549 | NWR region | Sr 99 alaskan way viaduct - replacement north access connection 13a003 (rev. 11/22/2013) | 5 of 7 | $46,626,019 | +15% |
| 03 APR 2013 | 008432 | Region 8 | Sr 520 west connection bridge | 3 of 4 | $24,222,377 | +9.0% |
| 24 JAN 2013 | 008402 | ER region | Sr 21 keller ferry - terminal rehabilitation | 1 of 9 | $1,930,000 | Low, 6.0% under the second |
| 25 APR 2012 | 008272 | SWR region | I-5 mellen street to blakeslee junction-stage 1 | 3 of 9 | $21,970,986 | +2.0% |
| 04 APR 2012 | 008261 | SCR region | Sr 10 bristol fill bridge - deck replacement | 3 of 8 | $1,764,500 | +28% |
| 07 MAR 2012 | 008251 | OR region | I-5 113th ave sw bridge special repair | 4 of 9 | $322,600 | +22% |
| 08 FEB 2012 | 008244 | SCR region | Us 97 satus creek vicinity - replace br. 97/106 and paving | 7 of 13 | $10,371,236 | +17% |
| 13 APR 2011 | 008105 | SWR region | Sr14 camas / washougal add lanes and build interchange | 3 of 9 | $29,460,707 | +3.0% |
| 24 FEB 2011 | 008080 | NWR region | Sr 99 aurora ave - g washington memorial br seismic | 4 of 7 | $7,591,018 | +23% |
| 02 FEB 2011 | 008033 | SCR region | Us 12 sr 124 intersection - build interchange | 5 of 15 | $12,984,632 | +13% |
| 29 APR 2010 | 007923 | ER region | Us 395 nsc - freya st to farwell rd - sb additional lanes | 4 of 4 | $22,524,965 | +4.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.