Kiewit Infrastructure West Co.: WSDOT bid record
Kiewit Infrastructure West Co. submitted 18 bids on Washington State DOT contracts in the data, from 02 FEB 2011 to 30 MAR 2022, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $2,687,607
- Latest bid
- 30 MAR 2022
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2011 | 1 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2015 | 2 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2017 | 6 | 1 | 17% |
| 2021 | 4 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 9 | 0 | 0% |
| SCR region | 4 | 1 | 25% |
| NCR region | 2 | 0 | 0% |
| Region 9 | 1 | 0 | 0% |
| OR region | 1 | 0 | 0% |
| ER region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Planing bituminous pavement | SY | 16 | 6 (38%) | $5.00 | $4.75 | |
| Temporary pavement marking-short duration | LF | 12 | 6 (50%) | $1.00 | $0.40 | |
| Beam guardrail type 31 non-flared terminal | EACH | 10 | 6 (60%) | $2,950.00 | $2,700.00 | |
| Paint line | LF | 13 | 4 (31%) | $1.25 | $0.25 | |
| Beam guardrail type 31 | LF | 11 | 4 (36%) | $32.00 | $26.32 | |
| Clearing and grubbing | ACRE | 10 | 4 (40%) | $17,750 | $8,000.00 | |
| Recessed pavement marker | HUND | 8 | 4 (50%) | $5,650.00 | $1,500.00 | |
| Removing guardrail anchor | EACH | 7 | 4 (57%) | $275.00 | $215.00 | |
| Hot mix asphalt class 1/2 inch PG 64-22 | TON | 6 | 4 (67%) | $79.50 | $80.00 | |
| Flexible guide post | EACH | 11 | 3 (27%) | $50.00 | $33.23 | |
| Erosion and sediment control lead | DAY | 8 | 3 (38%) | $87.50 | $100.00 | |
| Removing guardrail | LF | 8 | 3 (38%) | $4.50 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Midmountain Contractors, Inc. | 7 | 4 of 7 |
| Granite Construction Company | 7 | 6 of 7 |
| Scarsella Bros., Inc. | 6 | 5 of 6 |
| A-1 Landscaping and Constructi | 5 | 1 of 5 |
| Acme Concrete Paving, Inc. | 5 | 4 of 5 |
| Imco General Construction, Inc | 4 | 4 of 4 |
| Interwest Construction, Inc. | 4 | 3 of 4 |
| Active Construction, Inc. | 4 | 3 of 4 |
| Ram Construction General | 3 | 2 of 3 |
| Faber Construction Corp. | 3 | 3 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 MAR 2022 | 009779 | ER region | Us 195 old bnrr bridge to jct sr 271 pccp rehabilitation | 2 of 2 | $9,277,049 | +17% |
| 24 FEB 2022 | 009769 | NWR region | Sr 20 skagit river fish passage | 4 of 4 | $5,632,143 | +34% |
| 20 JAN 2022 | 009754 | NWR region | Sr 546 pepin creek and duffner ditch fish passage | 2 of 3 | $3,730,309 | +12% |
| 21 APR 2021 | 009672 | NWR region | Sr 546 kamm ditch fish passage | 4 of 6 | $969,484 | +17% |
| 14 APR 2021 | 009671 | NWR region | I-5 federal way to bellingham selected pccp panel replacement | 4 of 4 | $3,862,655 | +24% |
| 07 APR 2021 | 009668 | NWR region | Sr 538 logan creek fish passage | 5 of 5 | $2,283,106 | +41% |
| 07 APR 2021 | 009666 | NWR region | Sr 9 unnamed tributary to pilchuck creek fish passage | 5 of 6 | $1,582,285 | +11% |
| 15 MAR 2017 | 009040 | NCR region | I-90 n fork issaquah creek fish passage | 3 of 5 | $5,885,039 | +13% |
| 15 MAR 2017 | 009036 | SCR region | I-90 468th ave se to w summit rd - concrete, deck, & culvert rehab | 5 of 6 | $33,422,560 | +20% |
| 15 FEB 2017 | 009026 | SCR region | Us 97 dolarway intersection - intersection improvements | 1 of 3 | $2,687,607 | Low, 10% under the second |
| 08 FEB 2017 | 009019 | NCR region | Sr 900 green creek remove fish barrier | 4 of 7 | $999,520 | +12% |
| 11 JAN 2017 | 008992 | NWR region | I-5 nb s 260th st to duwamish river br concrete pavement rehab & ada | 4 of 4 | $35,429,886 | +15% |
| 11 JAN 2017 | 009002 | NWR region | Sr 532 church creek fish passage | 7 of 11 | $4,802,941 | +31% |
| 21 DEC 2016 | 008993 | OR region | I-5 mounts rd to center dr auxiliary lane extension | 5 of 9 | $8,798,474 | +12% |
| 15 APR 2015 | 008736 | Region 9 | Sr 20 spur anacortes tml tie-up slips dolphin & wingwall replacement 11w014 | 4 of 5 | $3,523,714 | +3.0% |
| 01 APR 2015 | 008715 | SCR region | I-90 keechelus dam to stampede pass phase 2a - add lanes / build wildlife bridges 14y015 | 6 of 6 | $106,489,601 | +46% |
| 03 APR 2013 | 008423 | NWR region | Sr 20 skagit river - ced permanent restoration | 10 of 12 | $9,445,976 | +83% |
| 02 FEB 2011 | 008033 | SCR region | Us 12 sr 124 intersection - build interchange | 10 of 15 | $14,900,000 | +30% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.