Kiewit Infrastructure West Co.: WSDOT bid record

Kiewit Infrastructure West Co. submitted 18 bids on Washington State DOT contracts in the data, from 02 FEB 2011 to 30 MAR 2022, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +17% above the low bid.

Owner
Washington State DOT
Low bid volume
$2,687,607
Latest bid
30 MAR 2022
Data through
07 OCT 2026
18Bids
1Low bids
6Win rate, percent
+17%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
2011100%
2013100%
2015200%
2016100%
20176117%
2021400%
2022300%
Kiewit Infrastructure West Co., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NWR region900%
SCR region4125%
NCR region200%
Region 9100%
OR region100%
ER region100%
Kiewit Infrastructure West Co., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Planing bituminous pavementSY166 (38%)$5.00$4.75
Temporary pavement marking-short durationLF126 (50%)$1.00$0.40
Beam guardrail type 31 non-flared terminalEACH106 (60%)$2,950.00$2,700.00
Paint lineLF134 (31%)$1.25$0.25
Beam guardrail type 31LF114 (36%)$32.00$26.32
Clearing and grubbingACRE104 (40%)$17,750$8,000.00
Recessed pavement markerHUND84 (50%)$5,650.00$1,500.00
Removing guardrail anchorEACH74 (57%)$275.00$215.00
Hot mix asphalt class 1/2 inch PG 64-22TON64 (67%)$79.50$80.00
Flexible guide postEACH113 (27%)$50.00$33.23
Erosion and sediment control leadDAY83 (38%)$87.50$100.00
Removing guardrailLF83 (38%)$4.50$5.00
Kiewit Infrastructure West Co., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Kiewit Infrastructure West Co., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
30 MAR 2022009779ER regionUs 195 old bnrr bridge to jct sr 271 pccp rehabilitation2 of 2$9,277,049+17%
24 FEB 2022009769NWR regionSr 20 skagit river fish passage4 of 4$5,632,143+34%
20 JAN 2022009754NWR regionSr 546 pepin creek and duffner ditch fish passage2 of 3$3,730,309+12%
21 APR 2021009672NWR regionSr 546 kamm ditch fish passage4 of 6$969,484+17%
14 APR 2021009671NWR regionI-5 federal way to bellingham selected pccp panel replacement4 of 4$3,862,655+24%
07 APR 2021009668NWR regionSr 538 logan creek fish passage5 of 5$2,283,106+41%
07 APR 2021009666NWR regionSr 9 unnamed tributary to pilchuck creek fish passage5 of 6$1,582,285+11%
15 MAR 2017009040NCR regionI-90 n fork issaquah creek fish passage3 of 5$5,885,039+13%
15 MAR 2017009036SCR regionI-90 468th ave se to w summit rd - concrete, deck, & culvert rehab5 of 6$33,422,560+20%
15 FEB 2017009026SCR regionUs 97 dolarway intersection - intersection improvements1 of 3$2,687,607Low, 10% under the second
08 FEB 2017009019NCR regionSr 900 green creek remove fish barrier4 of 7$999,520+12%
11 JAN 2017008992NWR regionI-5 nb s 260th st to duwamish river br concrete pavement rehab & ada4 of 4$35,429,886+15%
11 JAN 2017009002NWR regionSr 532 church creek fish passage7 of 11$4,802,941+31%
21 DEC 2016008993OR regionI-5 mounts rd to center dr auxiliary lane extension5 of 9$8,798,474+12%
15 APR 2015008736Region 9Sr 20 spur anacortes tml tie-up slips dolphin & wingwall replacement 11w0144 of 5$3,523,714+3.0%
01 APR 2015008715SCR regionI-90 keechelus dam to stampede pass phase 2a - add lanes / build wildlife bridges 14y0156 of 6$106,489,601+46%
03 APR 2013008423NWR regionSr 20 skagit river - ced permanent restoration10 of 12$9,445,976+83%
02 FEB 2011008033SCR regionUs 12 sr 124 intersection - build interchange10 of 15$14,900,000+30%
Kiewit Infrastructure West Co.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way