Faber Construction Corp.: WSDOT bid record
Faber Construction Corp. submitted 14 bids on Washington State DOT contracts in the data, from 21 FEB 2013 to 01 MAR 2023, and was the low bidder on 5 of them (36%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $9,662,618
- Latest bid
- 01 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 1 | 0 | 0% |
| 2016 | 3 | 1 | 33% |
| 2017 | 2 | 0 | 0% |
| 2019 | 1 | 1 | 100% |
| 2020 | 1 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2023 | 3 | 2 | 67% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 13 | 5 | 38% |
| Region 0 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Crushed surfacing base course | TON | 12 | 8 (67%) | $30.48 | $26.44 | |
| Construction signs class A | SF | 8 | 5 (63%) | $14.17 | $16.21 | |
| Planing bituminous pavement | SY | 12 | 3 (25%) | $28.26 | $4.75 | |
| Quarry spalls | TON | 10 | 3 (30%) | $57.10 | $39.00 | |
| Streambed sediment | TON | 9 | 3 (33%) | $53.80 | $45.00 | |
| Roadway excavation including haul | CY | 7 | 3 (43%) | $23.07 | $20.00 | |
| Compost sock | LF | 6 | 3 (50%) | $9.69 | $7.50 | |
| Streambed cobbles 8 inch | TON | 7 | 2 (29%) | $42.83 | $55.00 | |
| Channel excavation including haul | CY | 6 | 2 (33%) | $23.70 | $25.00 | |
| Streambed cobbles 12 inch | TON | 5 | 2 (40%) | $42.92 | $53.00 | |
| Clearing and grubbing | ACRE | 12 | 1 (8%) | $24,810 | $8,000.00 | |
| Flexible guide post | EACH | 9 | 1 (11%) | $92.00 | $33.23 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Colacurcio Brothers, Inc. | 9 | 3 of 9 |
| Granite Construction Company | 9 | 3 of 9 |
| Interwest Construction, Inc. | 8 | 5 of 8 |
| Strider Construction Co., Inc. | 7 | 6 of 7 |
| A-1 Landscaping and Constructi | 5 | 0 of 5 |
| Ram Construction General | 4 | 4 of 4 |
| Trimaxx Construction, Inc. | 4 | 1 of 4 |
| Tiger Construction, LTD. | 4 | 2 of 4 |
| Taylor'S Excavators Inc | 3 | 0 of 3 |
| Imco General Construction, Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 MAR 2023 | 009935 | NWR region | Sr 539 duffner ditch fish passage | 1 of 5 | $2,719,679 | Low, 19% under the second |
| 23 FEB 2023 | 009932 | NWR region | Sr 530 59th ave ne & 211th pl ne intersection improvements | 1 of 4 | $1,645,171 | Low, 15% under the second |
| 01 FEB 2023 | 009924 | NWR region | Sr 20 unnamed tributary to red creek fish passage | 6 of 7 | $3,411,421 | +12% |
| 07 APR 2021 | 009668 | NWR region | Sr 538 logan creek fish passage | 2 of 5 | $1,839,606 | +14% |
| 07 APR 2021 | 009666 | NWR region | Sr 9 unnamed tributary to pilchuck creek fish passage | 1 of 6 | $1,425,520 | Low, 4.0% under the second |
| 10 FEB 2021 | 009643 | NWR region | Sr 20 fish creek & lorenzan creek fish passage | 4 of 8 | $3,367,570 | +23% |
| 20 FEB 2020 | 009523 | NWR region | Sr 11 hoags creek fish passage | 3 of 6 | $1,200,272 | +38% |
| 06 MAR 2019 | 009380 | NWR region | Sr 9 tawes cr & two tributaries to tawes cr fish passage | 1 of 3 | $1,951,955 | Low, 36% under the second |
| 15 MAR 2017 | 009042 | NWR region | Sr 542 hedrick creek fish barrier | 4 of 6 | $4,342,534 | +17% |
| 11 JAN 2017 | 009002 | NWR region | Sr 532 church creek fish passage | 3 of 11 | $4,291,156 | +17% |
| 14 DEC 2016 | 008990 | Region 0 | Blg i-5 silver lake sb rv dump station rehabilitation | 3 of 12 | $496,771 | +5.0% |
| 09 MAR 2016 | 008851 | NWR region | Sr 542 high creek - fish passage 15a028 revised 3-3-2016 | 7 of 8 | $1,312,735 | +21% |
| 13 JAN 2016 | 008831 | NWR region | Sr 532 pilchuck creek tributary (secret creek) fish barrier xl3750 | 1 of 10 | $1,920,294 | Low, 7.0% under the second |
| 21 FEB 2013 | 008418 | NWR region | Sr 546 depot rd and bender rd intersection improvements | 6 of 8 | $2,764,494 | +29% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.