Rodarte Construction, Inc.: WSDOT bid record
Rodarte Construction, Inc. submitted 19 bids on Washington State DOT contracts in the data, from 26 MAR 2003 to 23 SEP 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $0
- Latest bid
- 23 SEP 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2003 | 1 | 0 | 0% |
| 2004 | 1 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2007 | 3 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 4 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 2 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2016 | 2 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 9 | 0 | 0% |
| OR region | 6 | 0 | 0% |
| SCR region | 2 | 0 | 0% |
| Region 0 | 1 | 0 | 0% |
| Region 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Shoring or extra excavation class B | SF | 11 | 6 (55%) | $1.00 | $1.00 | |
| Adjust manhole | EACH | 7 | 5 (71%) | $300.00 | $500.00 | |
| Silt fence | LF | 10 | 4 (40%) | $3.38 | $4.50 | |
| Catch basin type 1 | EACH | 7 | 4 (57%) | $900.00 | $1,100.00 | |
| Structure excavation class B including haul | CY | 13 | 3 (23%) | $15.00 | $15.00 | |
| Street cleaning | HR | 13 | 3 (23%) | $110.00 | $115.00 | |
| Inlet protection | EACH | 12 | 3 (25%) | $65.00 | $95.00 | |
| Paint line | LF | 11 | 3 (27%) | $0.35 | $0.25 | |
| Flaggers and spotters | HR | 7 | 3 (43%) | $39.00 | $44.00 | |
| Erosion and sediment control lead | DAY | 16 | 2 (13%) | $71.75 | $100.00 | |
| Seeding, fertilizing, and mulching | ACRE | 13 | 2 (15%) | $2,500.00 | $2,750.00 | |
| Plastic traffic arrow | EACH | 10 | 2 (20%) | $127.50 | $135.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tri-State Construction, Inc. | 11 | 10 of 11 |
| Scarsella Bros., Inc. | 9 | 8 of 9 |
| KLB Construction, Inc. | 8 | 5 of 8 |
| Gary Merlino Construction Co., | 7 | 2 of 7 |
| Ceccanti, Inc. | 7 | 4 of 7 |
| Construct Company LLC | 6 | 4 of 6 |
| Active Construction, Inc. | 6 | 4 of 6 |
| Tucci & Sons, Inc. | 6 | 4 of 6 |
| Midmountain Contractors, Inc. | 5 | 3 of 5 |
| Granite Construction Company | 4 | 1 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 4 of 8 | $1,568,597 | +26% |
| 21 DEC 2016 | 008993 | OR region | I-5 mounts rd to center dr auxiliary lane extension | 6 of 9 | $9,386,651 | +19% |
| 13 JAN 2016 | 008827 | OR region | Sr 305 suquamish way i/s improvements 15c514 | 5 of 6 | $1,228,418 | +19% |
| 03 DEC 2014 | 008685 | OR region | Sr 162 puyallup river bridge bridge replacement 13c521 | 7 of 15 | $5,950,401 | +9.0% |
| 03 APR 2013 | 008444 | OR region | Sr 7 muck cr trib to nisqually river fish barrier removal | 3 of 7 | $1,171,904 | +4.0% |
| 23 MAR 2011 | 008101 | NWR region | Sr 519 i-90 to sr 519 pedestrian trail | 2 of 6 | $1,131,644 | +2.0% |
| 02 FEB 2011 | 008053 | NWR region | I-405 ne 116th street interchange and street improvement project | 8 of 10 | $12,246,861 | +15% |
| 03 FEB 2010 | 007866 | OR region | Sr 410 214th ave. e. to 234th ave. e. widening | 6 of 12 | $7,224,759 | +6.0% |
| 25 MAR 2009 | 007692 | SCR region | I-90 snoqualmie pass east - phase 1a hyak to crystal springs - detour | 18 of 18 | $5,279,283 | +60% |
| 25 FEB 2009 | 007680 | Region 8 | Sr 509 property management grading and fencing | 11 of 15 | $486,669 | +41% |
| 25 FEB 2009 | 007679 | OR region | Sr 160 sr 16 to long lake road vic. | 13 of 15 | $3,988,570 | +27% |
| 04 FEB 2009 | 007661 | NWR region | Sr 169 green river bridge embankment failure | 9 of 14 | $3,808,268 | +19% |
| 03 DEC 2008 | 007634 | NWR region | Sr 509 vic s 112th st pedestrian improvements | 5 of 12 | $119,012 | +13% |
| 14 FEB 2007 | 007264 | NWR region | I-90 eb ramps to sr 202 roundabout | 4 of 7 | $1,289,494 | +11% |
| 31 JAN 2007 | 007256 | NWR region | Sr 202 jct sr 203 roundabout | 5 of 7 | $1,621,309 | +17% |
| 24 JAN 2007 | 007231 | NWR region | Sr 169 se 291st street vicinity safety and channelization | 3 of 10 | $1,491,492 | +25% |
| 24 FEB 2005 | 006913 | NWR region | Sr 164 158th ave se channelization | 3 of 4 | $495,050 | +8.0% |
| 25 FEB 2004 | 006724 | Region 0 | I-5 scatter creek safety rest area water rehabilitation | 7 of 8 | $90,000 | +66% |
| 26 MAR 2003 | 006532 | NWR region | I 5 lakeview viaduct bridge 5/566 | 2 of 5 | $693,798 | +2.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.