WSDOT contract XE3772 bid tabulation
Sr 906 Hyak Vicinity Emergency Washout Restoration. Let by Washington State DOT on September 23, 2026, Kittitas, SCR region. 8 bids received; low bid $1,242,940 by Scarsella Bros., Inc., -10% against the engineer's estimate of $1,382,987.
- Owner
- Washington State DOT
- Letting
- 23 SEP 2026
- Pay items
- 57
- Data through
- 07 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scarsella Bros., Inc. | $1,242,940 | Low | -10% |
| 2 | KLB Construction, Inc. | $1,288,805 | +4.0% | -7.0% |
| 3 | Northwest Construction, Inc. | $1,469,249 | +18% | +6.0% |
| 4 | Rodarte Construction, Inc. | $1,568,597 | +26% | +13% |
| 5 | Jansen Inc. | $1,615,882 | +30% | +17% |
| 6 | Laser Underground & Earth-Works, Inc. | $1,696,607 | +36% | +23% |
| 7 | Midmountain Contractors, Inc. | $1,869,000 | +50% | +35% |
| 8 | Granite Construction Company | $2,613,566 | +110% | +89% |
Engineer's estimate: $1,382,987.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scarsella Bros., Inc. | 2. KLB Construction, Inc. | 3. Northwest Construction, Inc. | 4. Rodarte Construction, Inc. | 5. Jansen Inc. | 6. Laser Underground & Earth-Works, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization | LS | 1 | $120,000 | $83,750 | $130,000 | $34,000 | $100,000 | $115,000 |
| 2 | Clearing and grubbing | LS | 1 | $15,000 | $2,500.00 | $6,000.00 | $12,500 | $26,748 | $15,000 |
| 3 | Removal of structures and obstructions | LS | 1 | $8,625.00 | $14,950 | $14,000 | $32,000 | $27,706 | $10,000 |
| 4 | Removing guardrail | LF | 535 | $8.00 | $9.80 | $9.00 | $18.00 | $9.00 | $20.00 |
| 5 | Removing guardrail anchor | EACH | 2 | $3.50 | $542.50 | $370.00 | $600.00 | $258.00 | $600.00 |
| 6 | Roadway excavation including haul | CY | 1,600 | $14.45 | $39.00 | $42.00 | $54.00 | $23.00 | $46.00 |
| 7 | Shoulder finishing | MI | 1.70 | $2,500.00 | $13,000 | $12,000 | $6,500.00 | $24,357 | $25,000 |
| 8 | Embankment compaction | CY | 350 | $10.00 | $13.75 | $22.00 | $25.00 | $26.00 | $30.00 |
| 9 | Ditch excavation including haul | CY | 6,420 | $14.45 | $25.00 | $35.00 | $49.00 | $50.00 | $46.00 |
| 10 | Channel excavation including haul | CY | 30 | $14.45 | $110.00 | $65.00 | $99.00 | $308.00 | $46.00 |
| 11 | Drop inlet type 1 | EACH | 1 | $7,600.00 | $8,500.00 | $9,300.00 | $9,500.00 | $6,605.00 | $10,000 |
| 12 | Rock for erosion and scour protection class A | CY | 90 | $150.00 | $115.00 | $120.00 | $145.00 | $41.00 | $70.00 |
| 13 | Quarry spalls | CY | 2,500 | $70.50 | $47.50 | $77.00 | $61.00 | $51.00 | $70.00 |
| 14 | High-density polyethylene (HDPE) pipe 30 inch diameter | LF | 75 | $341.10 | $215.00 | $610.00 | $700.00 | $351.00 | $500.00 |
| 15 | Temporary stream diversion unnamed creek | LS | 1 | $10,000 | $55,000 | $25,000 | $4,500.00 | $81,854 | $35,000 |
| 16 | Fish exclusion assistance | EST | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 17 | Fish block net maintenance | EST | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 18 | Crushed surfacing base course | TON | 2,350 | $40.00 | $42.50 | $38.00 | $38.00 | $41.00 | $55.00 |
| 19 | Hot mix asphalt class 3/8 inch PG 64H-28 | TON | 890 | $195.00 | $191.00 | $220.00 | $205.00 | $191.00 | $280.00 |
| 20 | Job mix compliance price adjustment | CALC | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 21 | Compaction price adjustment | CALC | 1 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 | $9,000.00 |
| 22 | Asphalt cost price adjustment | CALC | 1 | -$1.00 | -$1.00 | -$1.00 | -$1.00 | -$1.00 | -$1.00 |
| 23 | Check dam | LF | 250 | $28.00 | $52.25 | $30.00 | $77.00 | $68.00 | $35.00 |
| 24 | Street cleaning | HR | 200 | $200.00 | $185.00 | $135.00 | $175.00 | $203.00 | $60.00 |
| 25 | Erosion/water pollution control | EST | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 26 | Seeding, fertilizing and mulching | SY | 3,050 | $3.00 | $2.00 | $2.00 | $4.00 | $2.00 | $3.00 |
| 27 | Medium compost | SY | 3,050 | $7.50 | $4.00 | $2.00 | $5.00 | $2.00 | $9.00 |
| 28 | High visibility fence | LF | 70 | $10.00 | $11.00 | $13.00 | $12.00 | $31.00 | $10.00 |
| 29 | Aes. treatment beam guardrail type 31 | LF | 500 | $70.00 | $80.50 | $73.00 | $95.00 | $76.00 | $100.00 |
| 30 | Aes. treatment beam guardrail anchor type 11 | EACH | 2 | $2,700.00 | $3,085.00 | $2,800.00 | $3,000.00 | $2,153.00 | $3,000.00 |
| 31 | Removing and resetting existing permanent barrier | LF | 500 | $25.00 | $30.25 | $26.00 | $28.00 | $36.00 | $30.00 |
| 32 | Rigid guide post | EACH | 96 | $160.00 | $178.50 | $165.00 | $175.00 | $173.00 | $130.00 |
| 33 | Paint line | LF | 2,000 | $1.00 | $1.25 | $2.00 | $1.00 | $1.00 | $2.00 |
| 34 | Plastic stop line | LF | 28 | $72.00 | $87.50 | $80.00 | $80.00 | $65.00 | $90.00 |
| 35 | Permanent signing | LS | 1 | $2,000.00 | $2,425.00 | $2,500.00 | $3,200.00 | $3,618.00 | $2,500.00 |
| 36 | Illumination system hyak | LS | 1 | $41,000 | $35,802 | $45,000 | $75,000 | $30,479 | $80,000 |
| 37 | Portable changeable message sign | HR | 300 | $1.00 | $4.75 | $12.00 | $6.00 | $19.00 | $15.00 |
| 38 | Project temporary traffic control | LS | 1 | $75,000 | $74,650 | $95,000 | $75,000 | $100,000 | $50,000 |
| 39 | Work zone safety contingency | EST | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 40 | Construction signs class A | SF | 100 | $25.00 | $10.00 | $30.00 | $40.00 | $22.00 | $125.00 |
| 41 | Project partnering | CALC | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 42 | Structure excavation class B including haul | CY | 70 | $14.75 | $20.00 | $21.00 | $22.00 | $132.00 | $46.00 |
| 43 | Shoring or extra excavation class B | SF | 420 | $1.00 | $5.00 | $2.50 | $1.00 | $8.00 | $40.00 |
| 44 | Roadway surveying | LS | 1 | $8,250.00 | $9,500.00 | $10,000 | $5,000.00 | $6,212.00 | $8,000.00 |
| 45 | Concrete slope protection | SY | 450 | $163.10 | $145.00 | $95.00 | $250.00 | $154.00 | $80.00 |
| 46 | Cleaning existing drainage structure | LS | 1 | $19,000 | $4,500.00 | $3,700.00 | $2,200.00 | $10,940 | $15,000 |
| 47 | Adjust valve box | EACH | 2 | $750.00 | $350.00 | $500.00 | $450.00 | $547.00 | $1,250.00 |
| 48 | Force account ditch grading | EST | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 49 | Force account potholing utilities | EST | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 50 | Force account utility bedding | EST | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 51 | Roadside cleanup | EST | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 52 | Reimbursement for third party damage | EST | 1 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 53 | Minor change | CALC | 1 | -$1.00 | -$1.00 | -$1.00 | -$1.00 | -$1.00 | -$1.00 |
| 54 | Aggregate compliance price adjustment | CALC | 1 | -$1.00 | -$1.00 | -$1.00 | -$1.00 | -$1.00 | -$1.00 |
| 55 | Spill prevention, control, and countermeasures plan | LS | 1 | $500.00 | $500.00 | $1,000.00 | $500.00 | $3,175.00 | $2,500.00 |
| 56 | Construction geotextile for ditch lining | SY | 5,970 | $1.85 | $2.55 | $1.00 | $2.50 | $7.00 | $2.50 |
| 57 | Construction geotextile for permanent erosion control | SY | 66 | $8.00 | $5.05 | $7.00 | $25.00 | $67.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WSDOT's tabulation for this contract. WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
Every contract let that day: WSDOT letting of September 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.