Northwest Construction, Inc.: WSDOT bid record

Northwest Construction, Inc. submitted 22 bids on Washington State DOT contracts in the data, from 21 MAR 2001 to 23 SEP 2026, and was the low bidder on 3 of them (14%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Washington State DOT
Low bid volume
$34,418,865
Latest bid
23 SEP 2026
Data through
07 OCT 2026
22Bids
3Low bids
14Win rate, percent
+9.0%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2001100%
2003300%
2004100%
2005100%
2008200%
20093267%
2010500%
2011200%
201811100%
2021200%
2026100%
Northwest Construction, Inc., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NWR region15213%
OR region300%
SCR region200%
SWR region2150%
Northwest Construction, Inc., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Plastic crosswalk lineSF96 (67%)$5.00$6.00
Plastic drainage markingEACH165 (31%)$22.50$34.00
Raised pavement marker type 2HUND115 (45%)$330.00$478.00
Crushed surfacing base courseTON184 (22%)$15.50$26.44
Flexible guide postEACH154 (27%)$30.00$33.23
Inlet protectionEACH144 (29%)$57.50$95.00
Check damLF134 (31%)$7.00$12.00
Plastic traffic arrowEACH114 (36%)$85.00$135.00
Plastic stop lineLF114 (36%)$11.25$10.00
Removing paint lineLF104 (40%)$0.35$0.70
Profiled plastic lineLF54 (80%)$1.02$1.25
Chain link fence type 3LF54 (80%)$10.50$15.06
Northwest Construction, Inc., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Scarsella Bros., Inc.159 of 15
Tri-State Construction, Inc.124 of 12
KLB Construction, Inc.96 of 9
Granite Construction Company71 of 7
Midmountain Contractors, Inc.62 of 6
Wilder Construction Company64 of 6
Trimaxx Construction, Inc.66 of 6
J. R. Hayes & Sons, Inc.63 of 6
Strider Construction Co., Inc.52 of 5
Interwest Construction, Inc.54 of 5
Northwest Construction, Inc., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
23 SEP 2026XE3772SCR regionSr 906 Hyak Vicinity Emergency Washout Restoration3 of 8$1,469,249+18%
07 APR 2021009666NWR regionSr 9 unnamed tributary to pilchuck creek fish passage6 of 6$1,606,365+13%
03 MAR 2021009654NWR regionI-90 coal mine wall vic to soderman cr vic stormwater retrofit3 of 5$486,486+34%
18 JAN 2018009192NWR regionSr 203 langlois creek fish passage1 of 4$914,277Low, 2.0% under the second
12 JAN 2011008065NWR regionSr 530 sauk river bank erosion realign roadway8 of 13$2,997,947+21%
12 JAN 2011008060NWR regionSr 530 skaglund hill slide permanent repair8 of 14$3,628,463+12%
10 MAR 2010007894NWR regionSr 530 skaglund hill slide wetland mitigation3 of 22$648,000+9.0%
24 FEB 2010007879OR regionSr 510 yelm loop stage 15 of 15$4,652,225+12%
24 FEB 2010007882SWR regionSr 503 lewisville park vic. climbing lane8 of 12$3,999,400+8.0%
03 FEB 2010007866OR regionSr 410 214th ave. e. to 234th ave. e. widening2 of 12$6,898,000+2.0%
27 JAN 2010007859NWR regionSr 11 i-5 interchange - josh wilson rd rebuild interchange6 of 13$5,238,837+9.0%
02 DEC 2009007835SWR regionI-5 sr 432 talley way interchanges1 of 8$20,528,756Low, 2.0% under the second
25 MAR 2009007692SCR regionI-90 snoqualmie pass east - phase 1a hyak to crystal springs - detour8 of 18$3,731,258+13%
07 JAN 2009007631NWR regionI-5 172nd st ne (sr 531) interchange modification1 of 12$12,975,832Low, 0.0% under the second
10 DEC 2008007639NWR regionSr 9 martin rd vic to thunder creek realignment and widening4 of 19$1,822,495+8.0%
27 FEB 2008007484NWR regionSr 20 fredonia to i-5 - widening stage 22 of 4$28,798,810+2.0%
09 FEB 2005006879NWR regionI-90 eastgate transit access 142nd place se7 of 8$18,954,819+7.0%
08 DEC 2004006877OR regionSr 161 204th street e to 176th street e2 of 7$5,463,462+6.0%
19 MAR 2003006520NWR regionI 5 vic 300th st nw and starbird rd6 of 9$2,175,817+10%
12 MAR 2003006494NWR regionSr 527 164th st se to 132nd st se widen to 5 lanes4 of 6$9,925,143+9.0%
12 FEB 2003006483NWR regionI-5 ash way park and ride direct access2 of 8$7,901,691+4.0%
21 MAR 2001006037NWR regionSr 525 i-5 to sr 997 of 8$8,514,321+11%
Northwest Construction, Inc.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy