Northwest Construction, Inc.: WSDOT bid record
Northwest Construction, Inc. submitted 22 bids on Washington State DOT contracts in the data, from 21 MAR 2001 to 23 SEP 2026, and was the low bidder on 3 of them (14%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $34,418,865
- Latest bid
- 23 SEP 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2001 | 1 | 0 | 0% |
| 2003 | 3 | 0 | 0% |
| 2004 | 1 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2008 | 2 | 0 | 0% |
| 2009 | 3 | 2 | 67% |
| 2010 | 5 | 0 | 0% |
| 2011 | 2 | 0 | 0% |
| 2018 | 1 | 1 | 100% |
| 2021 | 2 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 15 | 2 | 13% |
| OR region | 3 | 0 | 0% |
| SCR region | 2 | 0 | 0% |
| SWR region | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Plastic crosswalk line | SF | 9 | 6 (67%) | $5.00 | $6.00 | |
| Plastic drainage marking | EACH | 16 | 5 (31%) | $22.50 | $34.00 | |
| Raised pavement marker type 2 | HUND | 11 | 5 (45%) | $330.00 | $478.00 | |
| Crushed surfacing base course | TON | 18 | 4 (22%) | $15.50 | $26.44 | |
| Flexible guide post | EACH | 15 | 4 (27%) | $30.00 | $33.23 | |
| Inlet protection | EACH | 14 | 4 (29%) | $57.50 | $95.00 | |
| Check dam | LF | 13 | 4 (31%) | $7.00 | $12.00 | |
| Plastic traffic arrow | EACH | 11 | 4 (36%) | $85.00 | $135.00 | |
| Plastic stop line | LF | 11 | 4 (36%) | $11.25 | $10.00 | |
| Removing paint line | LF | 10 | 4 (40%) | $0.35 | $0.70 | |
| Profiled plastic line | LF | 5 | 4 (80%) | $1.02 | $1.25 | |
| Chain link fence type 3 | LF | 5 | 4 (80%) | $10.50 | $15.06 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scarsella Bros., Inc. | 15 | 9 of 15 |
| Tri-State Construction, Inc. | 12 | 4 of 12 |
| KLB Construction, Inc. | 9 | 6 of 9 |
| Granite Construction Company | 7 | 1 of 7 |
| Midmountain Contractors, Inc. | 6 | 2 of 6 |
| Wilder Construction Company | 6 | 4 of 6 |
| Trimaxx Construction, Inc. | 6 | 6 of 6 |
| J. R. Hayes & Sons, Inc. | 6 | 3 of 6 |
| Strider Construction Co., Inc. | 5 | 2 of 5 |
| Interwest Construction, Inc. | 5 | 4 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 3 of 8 | $1,469,249 | +18% |
| 07 APR 2021 | 009666 | NWR region | Sr 9 unnamed tributary to pilchuck creek fish passage | 6 of 6 | $1,606,365 | +13% |
| 03 MAR 2021 | 009654 | NWR region | I-90 coal mine wall vic to soderman cr vic stormwater retrofit | 3 of 5 | $486,486 | +34% |
| 18 JAN 2018 | 009192 | NWR region | Sr 203 langlois creek fish passage | 1 of 4 | $914,277 | Low, 2.0% under the second |
| 12 JAN 2011 | 008065 | NWR region | Sr 530 sauk river bank erosion realign roadway | 8 of 13 | $2,997,947 | +21% |
| 12 JAN 2011 | 008060 | NWR region | Sr 530 skaglund hill slide permanent repair | 8 of 14 | $3,628,463 | +12% |
| 10 MAR 2010 | 007894 | NWR region | Sr 530 skaglund hill slide wetland mitigation | 3 of 22 | $648,000 | +9.0% |
| 24 FEB 2010 | 007879 | OR region | Sr 510 yelm loop stage 1 | 5 of 15 | $4,652,225 | +12% |
| 24 FEB 2010 | 007882 | SWR region | Sr 503 lewisville park vic. climbing lane | 8 of 12 | $3,999,400 | +8.0% |
| 03 FEB 2010 | 007866 | OR region | Sr 410 214th ave. e. to 234th ave. e. widening | 2 of 12 | $6,898,000 | +2.0% |
| 27 JAN 2010 | 007859 | NWR region | Sr 11 i-5 interchange - josh wilson rd rebuild interchange | 6 of 13 | $5,238,837 | +9.0% |
| 02 DEC 2009 | 007835 | SWR region | I-5 sr 432 talley way interchanges | 1 of 8 | $20,528,756 | Low, 2.0% under the second |
| 25 MAR 2009 | 007692 | SCR region | I-90 snoqualmie pass east - phase 1a hyak to crystal springs - detour | 8 of 18 | $3,731,258 | +13% |
| 07 JAN 2009 | 007631 | NWR region | I-5 172nd st ne (sr 531) interchange modification | 1 of 12 | $12,975,832 | Low, 0.0% under the second |
| 10 DEC 2008 | 007639 | NWR region | Sr 9 martin rd vic to thunder creek realignment and widening | 4 of 19 | $1,822,495 | +8.0% |
| 27 FEB 2008 | 007484 | NWR region | Sr 20 fredonia to i-5 - widening stage 2 | 2 of 4 | $28,798,810 | +2.0% |
| 09 FEB 2005 | 006879 | NWR region | I-90 eastgate transit access 142nd place se | 7 of 8 | $18,954,819 | +7.0% |
| 08 DEC 2004 | 006877 | OR region | Sr 161 204th street e to 176th street e | 2 of 7 | $5,463,462 | +6.0% |
| 19 MAR 2003 | 006520 | NWR region | I 5 vic 300th st nw and starbird rd | 6 of 9 | $2,175,817 | +10% |
| 12 MAR 2003 | 006494 | NWR region | Sr 527 164th st se to 132nd st se widen to 5 lanes | 4 of 6 | $9,925,143 | +9.0% |
| 12 FEB 2003 | 006483 | NWR region | I-5 ash way park and ride direct access | 2 of 8 | $7,901,691 | +4.0% |
| 21 MAR 2001 | 006037 | NWR region | Sr 525 i-5 to sr 99 | 7 of 8 | $8,514,321 | +11% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.