Graham Contracting, LTD.: WSDOT bid record
Graham Contracting, LTD. submitted 17 bids on Washington State DOT contracts in the data, from 09 MAR 2016 to 02 MAR 2022, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $62,552,708
- Latest bid
- 02 MAR 2022
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2016 | 4 | 2 | 50% |
| 2017 | 1 | 0 | 0% |
| 2018 | 3 | 2 | 67% |
| 2019 | 1 | 1 | 100% |
| 2020 | 2 | 0 | 0% |
| 2021 | 5 | 1 | 20% |
| 2022 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 8 | 2 | 25% |
| SCR region | 7 | 3 | 43% |
| OR region | 1 | 1 | 100% |
| ER region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Shoring or extra excavation class B | SF | 8 | 5 (63%) | $1.00 | $1.00 | |
| Crushed surfacing base course | TON | 14 | 4 (29%) | $33.50 | $26.44 | |
| Portable changeable message sign | HR | 7 | 4 (57%) | $4.00 | $5.12 | |
| Structure excavation class B including haul | CY | 11 | 3 (27%) | $36.00 | $15.00 | |
| Construction signs class A | SF | 8 | 3 (38%) | $30.00 | $16.21 | |
| Inlet protection | EACH | 8 | 3 (38%) | $120.00 | $95.00 | |
| Extruded curb | LF | 7 | 3 (43%) | $23.00 | $12.00 | |
| Cement concrete sidewalk | SY | 7 | 3 (43%) | $75.00 | $55.00 | |
| Raised pavement marker type 2 | HUND | 6 | 3 (50%) | $590.00 | $478.00 | |
| Cement concrete traffic curb and gutter | LF | 6 | 3 (50%) | $40.00 | $30.00 | |
| Training | HR | 6 | 3 (50%) | $1.50 | $4.00 | |
| Roadway excavation including haul | CY | 11 | 2 (18%) | $35.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Granite Construction Company | 5 | 1 of 5 |
| Imco General Construction, Inc | 4 | 2 of 4 |
| Midmountain Contractors, Inc. | 3 | 1 of 3 |
| Walsh Construction Co II LLC | 3 | 0 of 3 |
| A-1 Landscaping and Constructi | 3 | 1 of 3 |
| M.J. Hughes Construction, Inc. | 3 | 0 of 3 |
| Massana Construction, Inc. | 3 | 2 of 3 |
| Rotschy, Inc. | 2 | 1 of 2 |
| Cascade Bridge LLC | 2 | 0 of 2 |
| Marshbank Construction, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 MAR 2022 | 009762 | NWR region | I-90 & i-5 e sunset way vic & nb lowell rd vic pccp exp jnt rehab & deck overlay | 3 of 3 | $15,713,431 | +17% |
| 15 DEC 2021 | 009742 | NWR region | Sr 9 bickford ave intersection improvement | 3 of 4 | $3,544,111 | +11% |
| 28 APR 2021 | 009667 | SCR region | I-90 cle elum vicinity wb - weigh station preservation | 2 of 4 | $1,434,993 | +70% |
| 24 MAR 2021 | 009636 | OR region | Sr 167 sr 410 to sr 18 congestion management | 1 of 4 | $22,799,719 | Low, 12% under the second |
| 03 FEB 2021 | 009625 | SCR region | Us 395 ridgeline drive construct interchange | 2 of 8 | $12,798,350 | +4.0% |
| 13 JAN 2021 | 009623 | ER region | Sr290/barker road bnsf grade separation spokane county - mp 12.5 | 5 of 5 | $15,946,317 | +37% |
| 01 APR 2020 | 009533 | SCR region | Us 12 white pass vicinity - major drainage phase 3 | 3 of 5 | $1,096,123 | +22% |
| 12 FEB 2020 | 009520 | NWR region | I-90 sr 202 to snoqualmie valley trail bridge seismic retrofit | 3 of 8 | $2,432,333 | +9.0% |
| 21 FEB 2019 | 009376 | SCR region | I-90 hyak to stampede pass phases 1f & 2f - fencing 1b and 2a xl5793 | 1 of 2 | $2,818,862 | Low, 3.0% under the second |
| 11 APR 2018 | 009245 | NWR region | I-405 sr 167 interchange catch basins - drainage repair | 2 of 5 | $1,204,349 | +12% |
| 28 MAR 2018 | 009231 | NWR region | I-5 stillaguamish r br to hill ditch br pccp rehab & paving & ada | 1 of 4 | $16,999,349 | Low |
| 07 MAR 2018 | 009214 | SCR region | I-90 yakima river bridges cle elum to ellensburg eb & wb - deck rehab | 1 of 6 | $13,999,349 | Low, 3.0% under the second |
| 15 MAR 2017 | 009036 | SCR region | I-90 468th ave se to w summit rd - concrete, deck, & culvert rehab | 2 of 6 | $28,689,250 | +3.0% |
| 27 APR 2016 | 008897 | NWR region | Sr 92 pilchuck river - ced 16a006 revised 4-5-2016 | 5 of 5 | $1,993,993 | +25% |
| 06 APR 2016 | 008873 | SCR region | Us 12 palisades viewpoint to wildcat cr vic emergency repairs stage 2 16y003 | 1 of 4 | $1,532,037 | Low, 5.0% under the second |
| 30 MAR 2016 | 008865 | NWR region | Sr 202 little bear creek fish barrier removal 15a034 | 1 of 4 | $4,403,393 | Low, 13% under the second |
| 09 MAR 2016 | 008840 | NWR region | I-5 fisher creek - fish passage 15a013 (rev. 2/23/16) | 4 of 11 | $6,230,197 | +16% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.