WSDOT contract XE3773 bid tabulation

Sr 20 Us 101 I/S To N Of Fairmount Rd Hfst. Let by Washington State DOT on October 7, 2026, Jefferson, OR region. 6 bids received; low bid $355,249 by Lakeside Industries, Inc., -38% against the engineer's estimate of $573,448.

Owner
Washington State DOT
Letting
07 OCT 2026
Pay items
25
Data through
07 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Lakeside Industries, Inc.$355,249Low-38%
2Puget Paving and Construction, Inc.$415,948+17%-27%
3Combined Construction, Inc.$487,181+37%-15%
4Tucci & Sons, Inc.$497,932+40%-13%
5American Civil Constructors West Coast LLC$500,000+41%-13%
6Miles Resources, LLC$42,121,123+11757%+7245%
WSDOT contract XE3773: bids by rank

Engineer's estimate: $573,448.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Lakeside Industries, Inc.2. Puget Paving and Construction, Inc.3. Combined Construction, Inc.4. Tucci & Sons, Inc.5. American Civil Constructors West Coast LLC6. Miles Resources, LLC
1MobilizationLS1$81,665$30,350$40,475$50,000$80,000$50,000$4,199,969
2Force account pavement repair excavation including haulEST1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
3Crushed surfacing base courseTON10$175.00$282.00$600.00$990.00$250.00$875.00$0.01
4High friction surface treatmentSY2,444$64.00$54.00$71.00$42.00$70.00$74.00$0.01
5Planing bituminous pavementSY2,587$10.00$8.45$10.75$25.00$16.50$12.00$0.01
6Hot mix asphalt class 1/2 inch PG 58H-22TON265$235.00$192.00$226.00$220.00$240.00$279.00$0.01
7Job mix compliance price adjustmentCALC1$1,870.00$1,870.00$1,870.00$1,870.00$1,870.00$1,870.00$1,870.00
8Compaction price adjustmentCALC1$3,120.00$3,120.00$3,120.00$3,120.00$3,120.00$3,120.00$3,120.00
9Asphalt cost price adjustmentCALC1$1.00$1.00$1.00$1.00$1.00$1.00$1.00
10Cyclic density price adjustmentCALC1-$1.00-$1.00-$1.00-$1.00-$1.00-$1.00-$1.00
11Force account hot mix asphalt for pavement repair class 1/2 inch PG 58H-22EST1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
12Erosion/water pollution controlEST1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
13Paint lineLF3,150$2.50$2.10$1.86$2.50$2.00$2.00$0.01
14Centerline rumble stripMI0.20$25,000$49,000$43,780$58,125$47,000$42,000$0.01
15Raised pavement marker type 2HUND0.26$5,000.00$4,500.00$4,100.00$5,250.00$4,300.00$4,500.00$0.01
16Temporary pavement marking-short durationLF1,050$0.48$1.70$1.50$5.00$0.60$2.50$0.01
17Project temporary traffic controlLS1$173,300$50,000$43,000$119,250$71,000$85,000$21,878,566
18Work zone safety contingencyEST1$7,500.00$7,500.00$7,500.00$7,500.00$7,500.00$7,500.00$7,500.00
19Project partneringCALC1$10,000$10,000$10,000$10,000$10,000$10,000$10,000
20Roadway surveyingLS1$10,000$5,000.00$5,000.00$8,800.00$7,000.00$6,000.00$15,000,000
21Roadside cleanupEST1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
22Reimbursement for third party damageEST1$5.00$5.00$5.00$5.00$5.00$5.00$5.00
23Minor changeCALC1-$1.00-$1.00-$1.00-$1.00-$1.00-$1.00-$1.00
24Aggregate compliance price adjustmentCALC1-$1.00-$1.00-$1.00-$1.00-$1.00-$1.00-$1.00
25Spill prevention, control, and countermeasures planLS1$5,000.00$500.00$500.00$5,000.00$125.00$3,427.00$1,000,000
WSDOT contract XE3773: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WSDOT's tabulation for this contract. WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

Every contract let that day: WSDOT letting of October 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy