WSDOT contract XE3751 bid tabulation

Us 395 Kartchner St I/C Nb Ramp Terminal Improvements. Let by Washington State DOT on July 8, 2026, Franklin, SCR region. 4 bids received; low bid $1,093,111 by Tapani, Inc., +3.8% against the engineer's estimate of $1,053,188.

Owner
Washington State DOT
Letting
08 JUL 2026
Pay items
54
Data through
07 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Tapani, Inc.$1,093,111Low+4.0%
2Culbert Construction, Inc.$1,115,000+2.0%+6.0%
3Granite Construction Company$1,161,539+6.0%+10%
4Apollo, Inc.$1,220,000+12%+16%
WSDOT contract XE3751: bids by rank

Engineer's estimate: $1,053,188.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Tapani, Inc.2. Culbert Construction, Inc.3. Granite Construction Company4. Apollo, Inc.
1MobilizationLS1$94,821$100,000$120,699$115,000$118,373
2Clearing and grubbingACRE0.14$55,000$16,000$41,389$25,000$3,800.00
3Removing miscellaneous traffic itemLS1$10,120$34,000$76,993$20,000$25,000
4Roadway excavation including haulCY393$40.00$288.00$161.95$167.00$341.00
5Common borrow including haulCY176$40.00$23.00$92.05$75.00$15.00
6Embankment compactionCY553$30.00$20.00$32.86$31.00$23.00
7Quarry spallsTON8$120.00$74.00$172.96$235.00$171.50
8Catch basin type 1EACH1$3,000.00$6,000.00$4,044.83$4,500.00$5,900.00
9Schedule A storm sewer pipe 12 inch diameterLF27$120.00$130.00$71.80$196.00$123.00
10Crushed surfacing base courseTON420$55.00$67.00$81.17$175.00$40.00
11Textured and pigmented cement concrete pavementSY850$130.00$142.00$98.60$108.00$107.00
12Cement concrete pavementCY155$450.00$620.00$514.54$500.00$907.50
13Sealing cement concrete pavement to hot mix asphalt longit jointsLF316$30.00$12.00$11.28$31.00$49.00
14Hot mix asphalt class 1/2 inch PG 64H-28TON120$400.00$365.00$330.82$500.00$368.00
15Job mix compliance price adjustmentCALC1$900.00$900.00$900.00$900.00$900.00
16Compaction price adjustmentCALC1$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00
17Asphalt cost price adjustmentCALC1$65.00$65.00$65.00$65.00$65.00
18Erosion control and water pollution preventionLS1$5,000.00$24,107$716.94$22,225$1,710.00
19Seeding, fertilizing, and mulchingACRE0.42$10,000$9,000.00$9,225.11$9,150.00$11,100
20Medium compostACRE0.42$25,000$7,800.00$7,687.59$7,600.00$9,242.00
21High visibility fenceLF960$8.00$8.00$9.03$11.50$5.75
22Roundabout splitter island nosing curbEACH5$1,000.00$950.00$788.43$285.00$320.00
23Roundabout cement concrete curb and gutterLF1,877$45.00$51.00$56.15$55.00$50.00
24Cement concrete traffic curb and gutterLF108$60.00$41.00$50.64$44.00$34.00
25Roundabout truck apron cem. concrete curb and gutterLF373$70.00$52.00$52.53$55.00$50.00
26Cement concrete pedestrian curbLF60$50.00$44.00$48.88$47.75$32.00
27Flexible guide postEACH5$150.00$110.00$102.50$100.00$200.00
28Plastic lineLF3,640$3.00$6.00$5.38$5.35$1.55
29Plastic crosswalk lineSF240$10.00$13.50$12.30$12.20$11.70
30Plastic traffic arrowEACH1$800.00$510.00$461.26$455.00$707.00
31Plastic traffic letterEACH4$220.00$255.00$230.63$230.00$370.00
32Permanent signingLS1$11,500$30,000$27,675$27,500$34,300
33Illumination system kartchner STLS1$82,000$87,000$80,928$64,000$91,000
34Project temporary traffic controlLS1$250,800$65,000$158,877$181,000$187,500
35Work zone safety contingencyEST1$25,000$25,000$25,000$25,000$25,000
36Construction signs class ASF96$40.00$35.00$24.60$28.00$312.50
37Plastic crosshatch markingLF300$10.00$11.25$10.25$10.00$3.00
38Plastic wide lineLF640$5.00$11.00$10.76$10.50$5.00
39Structure excavation class B including haulCY20$140.00$31.00$20.77$76.00$100.00
40Roadway surveyingLS1$20,000$42,000$19,707$11,000$12,000
41ADA features surveyingLS1$5,000.00$9,000.00$1,210.99$3,500.00$3,900.00
42Cement concrete sidewalkSY344$80.00$99.00$104.50$82.00$83.50
43Cement concrete curb ramp type parallel AEACH1$3,000.00$2,700.00$2,582.30$7,400.00$2,225.00
44Cement concrete curb ramp type parallel BEACH2$3,000.00$2,700.00$2,561.80$7,400.00$2,200.00
45Cement concrete curb ramp type perpendicular AEACH1$3,000.00$2,500.00$2,458.28$7,400.00$2,087.00
46Detectable warning surfaceSF51$40.00$31.00$29.73$30.00$33.10
47Roadside cleanupEST1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
48Reimbursement for third party damageEST1$5.00$5.00$5.00$5.00$5.00
49Minor changeCALC1-$4.00-$4.00-$4.00-$4.00-$4.00
50Aggregate compliance price adjustmentCALC1-$4.00-$4.00-$4.00-$4.00-$4.00
51Spill prevention, control, and countermeasures planLS1$500.00$2,500.00$151.37$500.00$1,200.00
52Construction geotextile for permanent erosion controlSY12$30.00$11.00$77.62$55.00$10.10
53Pavement repair excavation including haulSY59$40.00$25.00$33.93$60.00$246.50
54Hot mix asphalt for pavement repair class 1/2 inch PG 64H-28TON8$700.00$350.00$330.82$1,000.00$1,090.00
WSDOT contract XE3751: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WSDOT's tabulation for this contract. WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

Every contract let that day: WSDOT letting of July 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy