Apollo, Inc.: WSDOT bid record
Apollo, Inc. submitted 20 bids on Washington State DOT contracts in the data, from 13 DEC 2000 to 08 JUL 2026, and was the low bidder on 6 of them (30%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $40,544,945
- Latest bid
- 08 JUL 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2007 | 1 | 0 | 0% |
| 2008 | 1 | 1 | 100% |
| 2009 | 3 | 1 | 33% |
| 2010 | 2 | 1 | 50% |
| 2011 | 1 | 0 | 0% |
| 2012 | 2 | 1 | 50% |
| 2014 | 1 | 0 | 0% |
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2020 | 2 | 2 | 100% |
| 2021 | 1 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| SCR region | 15 | 6 | 40% |
| ER region | 2 | 0 | 0% |
| NCR region | 1 | 0 | 0% |
| SWR region | 1 | 0 | 0% |
| OR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Crushed surfacing base course | TON | 17 | 6 (35%) | $17.42 | $26.44 | |
| Paint line | LF | 15 | 6 (40%) | $0.17 | $0.25 | |
| Training | HR | 7 | 6 (86%) | $1.00 | $4.00 | |
| Roadway excavation including haul | CY | 17 | 5 (29%) | $5.26 | $20.00 | |
| Concrete class 4000 for bridge | CY | 11 | 5 (45%) | $469.00 | $611.24 | |
| Shoring or extra excavation class B | SF | 10 | 5 (50%) | $0.75 | $1.00 | |
| Wattle | LF | 7 | 5 (71%) | $2.20 | $4.24 | |
| Erosion and sediment control lead | DAY | 13 | 4 (31%) | $50.00 | $100.00 | |
| Steel reinf. bar for bridge | LB | 11 | 4 (36%) | $0.93 | $1.00 | |
| Grate inlet type 2 | EACH | 9 | 4 (44%) | $1,500.00 | $2,000.00 | |
| Schedule A culvert pipe 18 inch diameter | LF | 8 | 4 (50%) | $30.40 | $44.00 | |
| Construction geotextile for permanent erosion control | SY | 8 | 4 (50%) | $3.30 | $3.51 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Selland Construction, Inc. | 8 | 4 of 8 |
| Rotschy, Inc. | 7 | 2 of 7 |
| M.A. Deatley Construction, Inc | 6 | 1 of 6 |
| Scarsella Bros., Inc. | 6 | 3 of 6 |
| Cascade Bridge LLC | 5 | 3 of 5 |
| Granite Construction Company | 4 | 1 of 4 |
| Kerr Contractors, Inc. | 4 | 1 of 4 |
| KLB Construction, Inc. | 4 | 1 of 4 |
| William Charles Construction, | 4 | 1 of 4 |
| Max J. Kuney Company | 4 | 2 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 JUL 2026 | XE3751 | SCR region | Us 395 Kartchner St I/C Nb Ramp Terminal Improvements | 4 of 4 | $1,220,000 | +12% |
| 12 APR 2023 | 009945 | SCR region | Sr 241 mabton vicinity retrofit bridges | 2 of 3 | $19,190,663 | +5.0% |
| 03 FEB 2021 | 009625 | SCR region | Us 395 ridgeline drive construct interchange | 3 of 8 | $12,978,913 | +5.0% |
| 15 APR 2020 | 009542 | SCR region | Sr 240 columbia center blvd. - pedestrian facility improvement | 1 of 3 | $997,040 | Low, 5.0% under the second |
| 01 APR 2020 | 009530 | SCR region | I-82 sr 397 interchange eb - bridge repair | 1 of 4 | $437,785 | Low, 41% under the second |
| 07 FEB 2018 | 009196 | SCR region | I-182 queensgate dr - interchange improvements | 3 of 6 | $2,485,866 | +4.0% |
| 25 JAN 2017 | 009011 | ER region | Us 395 nsc freya st - structures | 2 of 7 | $8,169,137 | +7.0% |
| 03 DEC 2014 | 008685 | OR region | Sr 162 puyallup river bridge bridge replacement 13c521 | 10 of 15 | $6,117,802 | +12% |
| 08 FEB 2012 | 008244 | SCR region | Us 97 satus creek vicinity - replace br. 97/106 and paving | 13 of 13 | $12,356,132 | +40% |
| 25 JAN 2012 | 008240 | SCR region | Sr 410 nile valley landslide - re-construct route | 1 of 14 | $4,083,066 | Low, 0.0% under the second |
| 02 FEB 2011 | 008033 | SCR region | Us 12 sr 124 intersection - build interchange | 2 of 15 | $11,992,499 | +4.0% |
| 13 JAN 2010 | 007858 | SCR region | I-82 valley mall blvd. interchange rebuild interchange | 3 of 12 | $19,079,870 | +4.0% |
| 06 JAN 2010 | 007864 | SCR region | Sr 241 dry creek - construct box culvert | 1 of 20 | $299,348 | Low, 3.0% under the second |
| 10 DEC 2009 | 007850 | ER region | Sr 27 pine creek bridge - replace bridge | 3 of 11 | $2,353,197 | +2.0% |
| 01 APR 2009 | 007681 | SWR region | Vancouver rail project 39th street bridge city of vancouver | 14 of 14 | $13,306,046 | +15% |
| 25 MAR 2009 | 007702 | SCR region | I-182 rd. 100/broadmoor blvd. improvements | 1 of 6 | $994,966 | Low, 2.0% under the second |
| 30 JAN 2008 | 007474 | SCR region | Us 12 frenchtown vicinity to walla walla - add lanes | 1 of 8 | $33,732,740 | Low, 5.0% under the second |
| 12 DEC 2007 | 007452 | SCR region | Sr 241 rattlesnake hills vicinity roadside safety | 5 of 18 | $997,701 | +12% |
| 12 JAN 2006 | 007071 | NCR region | I-90 moses lake area bridge clearance | 4 of 4 | $3,382,568 | +25% |
| 13 DEC 2000 | 005977 | SCR region | Sr 240 stevens drive to sr 182 | 2 of 5 | $3,060,347 | +1.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.