WSDOT contract XE3770 bid tabulation
Sr 28 Ewc 2026 Demo No 3. Let by Washington State DOT on October 7, 2026, Douglas, NCR region. 3 bids received; low bid $45,557 by Skycorp, LTD, -63% against the engineer's estimate of $122,929.
- Owner
- Washington State DOT
- Letting
- 07 OCT 2026
- Pay items
- 12
- Data through
- 07 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Skycorp, LTD | $45,557 | Low | -63% |
| 2 | N.W. Construction General Contracting, Inc. | $78,911 | +73% | -36% |
| 3 | Thacker Excavation & Transportation LLC | $127,942 | +181% | +4.0% |
Engineer's estimate: $122,929.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Skycorp, LTD | 2. N.W. Construction General Contracting, Inc. | 3. Thacker Excavation & Transportation LLC |
|---|---|---|---|---|---|---|---|
| 1 | Mobilization | LS | 1 | $10,962 | $2,000.00 | $8,600.00 | $5,000.00 |
| 2 | Removal of structures and obstructions | LS | 1 | $77,000 | $19,500 | $38,783 | $57,300 |
| 3 | Removal and disposal of asbestos material | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | Erosion and sediment control lead | DAY | 6 | $90.00 | $100.00 | $75.00 | $1,000.00 |
| 5 | Erosion control and water pollution prevention | LS | 1 | $200.00 | $1,000.00 | $1,000.00 | $8,000.00 |
| 6 | Bark or wood chip mulch | SY | 3,023 | $7.30 | $5.70 | $8.50 | $12.73 |
| 7 | High visibility fence | LF | 456 | $8.20 | $3.00 | $5.00 | $8.12 |
| 8 | High visibility silt fence | LF | 532 | $13.00 | $4.80 | $1.50 | $8.37 |
| 9 | Reimbursement for third party damage | EST | 1 | $5.00 | $5.00 | $5.00 | $5.00 |
| 10 | Minor change | CALC | 1 | -$1.00 | -$1.00 | -$1.00 | -$1.00 |
| 11 | Spill prevention, control, and countermeasures plan | LS | 1 | $500.00 | $300.00 | $300.00 | $4,000.00 |
| 12 | FA-site cleanup of bio. and physical hazards | EST | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WSDOT's tabulation for this contract. WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
Every contract let that day: WSDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.