WisDOT contract 20250114031 bid tabulation
1195-05-60. Let by Wisconsin DOT on January 14, 2025, Barron. 2 bids received; low bid $770,405 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 68
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $770,405 | Low |
| 2 | Lunda Construction Company | $870,310 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Lunda Construction Company |
|---|---|---|---|---|---|
| 1 | Debris containment (structure) 01. B-03-0050 (203.0330) | EACH | 1 | $1.00 | $50.00 |
| 2 | Debris containment (structure) 02. B-03-0051 (203.0330) | EACH | 1 | $1.00 | $50.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 84 | $105.00 | $105.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 4,570 | $5.35 | $5.35 |
| 5 | Removing guardrail (204.0165) | LF | 196 | $4.90 | $7.40 |
| 6 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 63 | $87.50 | $87.50 |
| 7 | Finishing roadway (project) 01. 1195-05-60 (213.0100) | EACH | 1 | $1.00 | $500.00 |
| 8 | Finishing roadway (project) 02. 1195-06-60 (213.0100) | EACH | 1 | $1.00 | $500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 140 | $79.77 | $79.77 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 30 | $90.00 | $90.00 |
| 11 | Concrete pavement 6-inch (415.0060) | SY | 84 | $127.29 | $127.29 |
| 12 | Concrete pavement approach slab (415.0410) | SY | 194 | $288.37 | $288.37 |
| 13 | Drilled tie bars (416.0610) | EACH | 53 | $16.03 | $16.03 |
| 14 | Incentive density HMA pavement (460.2000) | DOL | 660 | $1.00 | $1.00 |
| 15 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 1,023 | $115.25 | $115.25 |
| 16 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 5,796 | $1.00 | $1.00 |
| 17 | Protective surface treatment (502.3200) | SY | 1,080 | $4.25 | $3.00 |
| 18 | Pigmented surface sealer reseal (502.3205) | SY | 244 | $20.00 | $7.00 |
| 19 | Preparation decks type 1 (509.0301) | SY | 80 | $245.00 | $150.00 |
| 20 | Preparation decks type 2 (509.0302) | SY | 40 | $300.00 | $200.00 |
| 21 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 1,080 | $10.00 | $15.00 |
| 22 | Concrete surface repair (509.1500) | SF | 100 | $200.00 | $200.00 |
| 23 | Full-depth deck repair (509.2000) | SY | 4 | $400.00 | $500.00 |
| 24 | Concrete masonry overlay decks (509.2500) | CY | 60 | $2,000.00 | $2,000.00 |
| 25 | Removing concrete masonry deck overlay (structure) 01. B-03-0050 (509.9005.S) | SY | 540 | $35.00 | $23.16 |
| 26 | Removing concrete masonry deck overlay (structure) 02. B-03-0051 (509.9005.S) | SY | 540 | $35.00 | $23.16 |
| 27 | Concrete barrier temporary precast delivered (603.8000) | LF | 950 | $20.00 | $15.50 |
| 28 | Concrete barrier temporary precast installed (603.8125) | LF | 1,826 | $6.00 | $7.25 |
| 29 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 500 | $5.00 | $0.01 |
| 30 | Reconstructing inlets (611.0430) | EACH | 2 | $1,000.00 | $1,000.00 |
| 31 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $400.00 | $200.00 |
| 32 | Replacing guardrail posts and blocks (614.0950) | EACH | 72 | $114.00 | $83.00 |
| 33 | Maintenance and repair of haul roads (project) 01. 1195-05-60 (618.0100) | EACH | 1 | $1.00 | $0.01 |
| 34 | Maintenance and repair of haul roads (project) 02. 1195-06-60 (618.0100) | EACH | 1 | $1.00 | $0.01 |
| 35 | Mobilization (619.1000) | EACH | 1 | $136,000 | $265,779 |
| 36 | Silt fence (628.1504) | LF | 446 | $2.30 | $2.00 |
| 37 | Silt fence maintenance (628.1520) | LF | 446 | $0.08 | $0.01 |
| 38 | Mobilizations erosion control (628.1905) | EACH | 2 | $420.00 | $900.00 |
| 39 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $250.00 | $1.00 |
| 40 | Inlet protection type C (628.7015) | EACH | 2 | $72.00 | $100.00 |
| 41 | Rock bags (628.7570) | EACH | 6 | $12.92 | $30.00 |
| 42 | Moving signs type II (638.2102) | EACH | 4 | $119.00 | $100.00 |
| 43 | Moving small sign supports (638.4000) | EACH | 4 | $98.00 | $100.00 |
| 44 | Field office type C (642.5201) | EACH | 1 | $7,500.00 | $3,000.00 |
| 45 | Traffic control drums (643.0300) | DAY | 10,430 | $0.23 | $0.23 |
| 46 | Traffic control barricades type III (643.0420) | DAY | 210 | $1.60 | $1.60 |
| 47 | Traffic control warning lights type A (643.0705) | DAY | 420 | $0.11 | $0.11 |
| 48 | Traffic control warning lights type C (643.0715) | DAY | 6,270 | $0.11 | $0.11 |
| 49 | Traffic control arrow boards (643.0800) | DAY | 210 | $10.00 | $10.00 |
| 50 | Traffic control signs (643.0900) | DAY | 3,750 | $0.39 | $0.39 |
| 51 | Traffic control signs PCMS (643.1050) | DAY | 28 | $20.00 | $20.00 |
| 52 | Temporary marking line removable tape 6-inch (643.3180) | LF | 18,131 | $2.06 | $2.06 |
| 53 | Traffic control (643.5000) | EACH | 1 | $13,500 | $12,000 |
| 54 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 1,550 | $1.70 | $1.70 |
| 55 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 13,950 | $1.85 | $1.85 |
| 56 | Marking removal line 4-inch (646.9000) | LF | 7,183 | $0.40 | $0.40 |
| 57 | Construction staking base (650.5000) | LF | 135 | $0.01 | $0.01 |
| 58 | Construction staking structure layout (structure) 01. B-03-0050 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 |
| 59 | Construction staking structure layout (structure) 02. B-03-0051 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 |
| 60 | Construction staking resurfacing reference (650.8000) | LF | 3,520 | $0.10 | $0.10 |
| 61 | Construction staking supplemental control (project) 01. 1195-05-60 (650.9911) | EACH | 1 | $280.00 | $280.00 |
| 62 | Construction staking supplemental control (project) 02. 1195-06-60 (650.9911) | EACH | 1 | $306.65 | $306.65 |
| 63 | Sawing asphalt (690.0150) | LF | 48 | $2.95 | $2.95 |
| 64 | Sawing concrete (690.0250) | LF | 106 | $2.95 | $2.95 |
| 65 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,000 | $1.00 | $1.00 |
| 66 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 600 | $5.00 | $5.00 |
| 67 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 68 | Special 01. salvage and reinstall guardrail (SPV.0090) | LF | 84 | $27.00 | $83.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.