Lunda Construction Company: WisDOT bid record

Lunda Construction Company submitted 474 bids on Wisconsin DOT contracts in the data, from 11 JAN 2022 to 10 NOV 2026, and was the low bidder on 56 of them (12%). When it was not low, its total sat a median +15% above the low bid.

Owner
Wisconsin DOT
Low bid volume
$130,241,752
Latest bid
10 NOV 2026
Data through
10 NOV 2026
474Bids
56Low bids
12Win rate, percent
+15%Median gap to the low bid when not low, 418 bids

By year

YearBidsLow bidsWin rate
20228889%
20236658%
20249888%
20251272217%
2026951314%
Lunda Construction Company, WisDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Milwaukee30723%
Marathon2800%
Clark21210%
Dane2100%
Fond Du Lac15213%
Dunn15213%
Waukesha1417%
Jackson14536%
Chippewa13215%
Outagamie1218%
Sauk1200%
Taylor1100%
Lunda Construction Company, WisDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Incentive strength concrete structures715.0502DOL417417 (100%)$1.00$1.00
Traffic control signs643.0900DAY461386 (84%)$0.40$0.40
Traffic control barricades type III643.0420DAY458368 (80%)$0.58$0.60
Tack coat455.0605GAL393362 (92%)$7.86$3.85
Traffic control warning lights type A643.0705DAY439352 (80%)$0.13$0.12
Traffic control643.5000EACH458342 (75%)$3,165.23$7,500.00
On-the-job training graduate at $5.00/HRASP.1T0GHRS338338 (100%)$5.00$5.00
On-the-job training apprentice at $5.00/HRASP.1T0AHRS337337 (100%)$5.00$5.00
Construction staking subgrade650.4500LF374327 (87%)$0.01$0.01
Silt fence maintenance628.1520LF425313 (74%)$0.02$0.02
Construction staking slope stakes650.9920LF361297 (82%)$1.25$1.00
Asphaltic surface465.0105TON316286 (91%)$155.54$151.62
Lunda Construction Company, WisDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Lunda Construction Company, WisDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
10 NOV 202620261110004RockTown of Bradford, O Riley Road; Turtle Creek Bridge B-53-0390 (LOC STR, Rock County Town of Bradford, O'Riley Rd)6 of 6$2,407,053+14%
10 NOV 202620261110009IowaEdmund - Mineral Point; Mineral Point Branch Br B-25-198 (STH 039, Iowa County Edmund - Mineral Point)1 of 4$2,256,362Low
10 NOV 202620261110012DaneCity of Middleton, CTH M; Pheasant Br Creek Bridge B-13-0905 (CTH M, Dane County City of Middleton, CTH M)7 of 7$4,409,931+19%
10 NOV 202620261110024PortageSTH 66 - CTH C; Bear Creek Bridge, B-49-0203 (CTH II, Portage County STH 66 - CTH C)5 of 6$900,639+26%
10 NOV 202620261110025WaupacaT Dupont, Quarterline Road; S Br Pigeon River Bridge, B680153 (LOC STR, Waupaca County T Dupont, Quarterline Road)5 of 5$637,674+14%
10 NOV 202620261110032JacksonMelrose - Black River Falls; Roaring Ck B27076,Douglas Ck B27016 (STH 054, Jackson County Melrose - Black River Falls)2 of 4$1,485,423+2.0%
13 OCT 202620261013008OzaukeeT Cedarburg, Cedar Creek Rd; Cedar Creek Bridge, P45-0038 (LOC STR, Ozaukee County T Cedarburg, Cedar Creek Rd)4 of 5$1,512,795+28%
13 OCT 202620261013017MarathonSTH 29 - CTH A; Br Big Rib River Bridge, B-37-0500 (CTH S, Marathon County STH 29 - CTH A)5 of 6$646,378+14%
13 OCT 202620261013018MarathonCTH C - Fenwood; Big Eau Pleine River, B-37-0171 (CTH M, Marathon County CTH C - Fenwood)2 of 4$2,317,356+24%
13 OCT 202620261013019MarathonWood Co Line - STH 97; Mcgivern Creek Bridge, B-37-0496 (CTH T, Marathon County Wood Co Line - STH 97)6 of 6$715,464+13%
13 OCT 202620261013022Dunn1020-05-631 of 2$10,646,418Low, 11% under the second
13 OCT 202620261013023DunnBaldwin - Menomonie; Hall Estate Rd/160th St B-17-0216 (IH 094, Dunn County Baldwin - Menomonie)2 of 4$2,271,712+2.0%
13 OCT 202620261013024ChippewaElk Mound - Chippewa Falls; Chippewa River Br B090210 & B090209 (STH 029, Chippewa County Elk Mound - Chippewa Falls)1 of 2$2,818,858Low, 16% under the second
13 OCT 202620261013027ClarkGreenwood - Spencer; Bear Creek Bridge B-10-0252 (STH 098, Clark County Greenwood - Spencer)3 of 6$1,247,878+12%
13 OCT 202620261013030DunnElk Mound - Bloomer; Branch Sinking Creek C-17-0051 (STH 040, Dunn County Elk Mound - Bloomer)6 of 6$857,269+32%
15 SEP 202620260915002GrantCTH M - CTH Q; Blue River Bridge B-22-0309 (CTH G, Grant County CTH M – CTH Q)1 of 5$1,634,400Low, 3.0% under the second
15 SEP 202620260915005JuneauT Orange, Schroeder Road; Ltl Lemonweir Rvr Bridge B-29-0169 (LOC STR, Juneau County T Orange, Schroeder Road)3 of 5$699,399+18%
15 SEP 202620260915017VilasMinocqua - Manitowish; Manitowish River Bridge, B-63-0027 (USH 051, Vilas County USH 51)3 of 5$2,940,871+3.0%
15 SEP 202620260915023WoodWisconsin Rapids - Marshfield; Wis 13 & 80 Bridges B-71-62,79 (VAR HWY, Wood County WIS 13 & 80 Bridges B-71-62,79)3 of 3$1,067,601+16%
15 SEP 202620260915025LangladeAntigo - Langlade; Wolf River Bridge B-34-0061 (STH 064, Langlade County Antigo - Langlade)3 of 4$3,669,880+9.0%
15 SEP 202620260915028JacksonOsseo - Black River Falls; S Pole Grove Rd Bridge B-27-0026 (IH 094, Jackson County Osseo - Black River Falls)1 of 3$736,924Low, 2.0% under the second
15 SEP 202620260915029JacksonBlack River Falls - Tomah; Castle Mound Road Bridge B-27-0053 (IH 094, Jackson County Black River Falls - Tomah)2 of 2$1,179,2660.0%
15 SEP 202620260915030ChippewaChippewa Falls - Thorp; 160th Street Bridge B-09-0032 (STH 029, Chippewa County Chippewa Falls - Thorp)3 of 3$1,712,879+7.0%
15 SEP 202620260915032BayfieldDrummond - USH 2; 20 Mile Creek Bridge B-04-0129 (USH 063, Bayfield County Drummond - USH 2)3 of 3$3,351,267+5.0%
11 AUG 202620260811002SaukSTH 33 - CTH W (CTH X); Baraboo River Bridge B-56-0245 (CTH X, Sauk County STH 33 - CTH W (CTH X))4 of 5$1,741,697+13%
Lunda Construction Company: latest WisDOT bids in the data

How this record was read

WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

  • Every bid counted here matched its published total to within one dollar; WisDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy