WisDOT contract 20261110009 bid tabulation
Edmund - Mineral Point; Mineral Point Branch Br B-25-198 (STH 039, Iowa County Edmund - Mineral Point). Let by Wisconsin DOT on November 10, 2026, Iowa. 4 bids received; low bid $2,256,362 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 90
- Data through
- 10 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $2,256,362 | Low |
| 3 | Zenith Tech., Inc. - Waukesha | $2,562,283 | +14% |
| 4 | Sheet Piling Services LLC | $2,774,031 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Zenith Tech., Inc. - Waukesha | 3. Sheet Piling Services LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $250.00 | $250.00 | $250.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $250.00 | $250.00 | $250.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-25- 0250 (203.0260) | EACH | 1 | $200,000 | $210,000 | $735,350 |
| 4 | Excavation common (205.0100) | CY | 2,830 | $15.50 | $15.50 | $15.50 |
| 5 | Excavation for structures bridges (structure) 01. B-25-0198 (206.1001) | EACH | 1 | $75,000 | $95,000 | $240,800 |
| 6 | Cofferdams (structure) 01. B-25- 0198 (206.5001) | EACH | 1 | $150,000 | $250,000 | $200,000 |
| 7 | Backfill structure type A (210.1500) | TON | 300 | $35.00 | $35.00 | $35.00 |
| 8 | Finishing roadway (project) 01. 5952-03-84 (213.0100) | EACH | 1 | $750.00 | $3,500.00 | $750.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 260 | $24.00 | $24.00 | $24.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,900 | $22.00 | $22.00 | $22.00 |
| 11 | Select crushed material (312.0110) | TON | 2,650 | $20.50 | $20.50 | $20.50 |
| 12 | Tack coat (455.0605) | GAL | 120 | $6.50 | $6.50 | $6.50 |
| 13 | Incentive density HMA pavement (460.2000) | DOL | 731 | $1.00 | $1.00 | $1.00 |
| 14 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 731 | $106.30 | $106.30 | $106.30 |
| 15 | Asphaltic rumble strips, centerline (465.0560) | LF | 610 | $5.29 | $5.29 | $5.29 |
| 16 | Concrete masonry bridges (502.0100) | CY | 514 | $900.00 | $1,200.00 | $850.00 |
| 17 | Protective surface treatment (502.3200) | SY | 630 | $5.00 | $4.25 | $3.00 |
| 18 | Pigmented surface sealer (502.3210) | SY | 175 | $8.00 | $14.00 | $3.00 |
| 19 | Underwater substructure inspection (structure) 01. B-25-0198 (502.9000.S) | EACH | 2 | $5,500.00 | $5,500.00 | $0.01 |
| 20 | Prestressed girder type I 36W-inch (503.0137) | LF | 602 | $350.00 | $350.00 | $400.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 12,160 | $1.25 | $1.40 | $1.50 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 64,910 | $1.35 | $1.55 | $1.60 |
| 23 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 24 | $150.00 | $140.00 | $125.00 |
| 24 | Steel diaphragms (structure) 01. B- 25-0198 (506.4000) | EACH | 9 | $1,200.00 | $1,400.00 | $2,000.00 |
| 25 | Floor drains type GC (514.0445) | EACH | 4 | $3,500.00 | $3,900.00 | $4,000.00 |
| 26 | Downspout 6-inch (514.2625) | LF | 13 | $150.00 | $205.00 | $750.00 |
| 27 | Rubberized membrane waterproofing (516.0500) | SY | 16 | $25.00 | $68.00 | $20.00 |
| 28 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $375.00 | $375.00 | $375.00 |
| 29 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 60 | $42.50 | $42.50 | $42.50 |
| 30 | Pre-boring rock or consolidated materials (550.0020) | LF | 550 | $225.00 | $310.00 | $195.00 |
| 31 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 1,000 | $70.00 | $90.00 | $85.00 |
| 32 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 260 | $30.77 | $30.77 | $30.77 |
| 33 | Concrete surface drains (602.3010) | CY | 4 | $1,000.00 | $1,000.00 | $1,000.00 |
| 34 | Riprap medium (606.0200) | CY | 16 | $58.00 | $58.00 | $58.00 |
| 35 | Riprap heavy (606.0300) | CY | 330 | $90.00 | $73.00 | $60.00 |
| 36 | Inlet covers type V (611.0654) | EACH | 2 | $1,100.00 | $1,100.00 | $1,100.00 |
| 37 | Inlets 2X2-FT (611.3220) | EACH | 2 | $1,850.00 | $1,850.00 | $1,850.00 |
| 38 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 250 | $5.00 | $9.00 | $9.00 |
| 39 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $200.00 | $300.00 | $250.00 |
| 40 | Salvaged rail (614.0920) | LF | 360 | $5.00 | $5.00 | $5.00 |
| 41 | Salvaged guardrail end treatments (614.0925) | EACH | 4 | $250.00 | $250.00 | $250.00 |
| 42 | MGS guardrail 3 (614.2300) | LF | 325 | $30.00 | $30.00 | $30.00 |
| 43 | MGS thrie beam transition (614.2500) | LF | 160 | $92.00 | $92.00 | $92.00 |
| 44 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,950.00 | $3,950.00 | $3,950.00 |
| 45 | Maintenance and repair of haul roads (project) 01. 5952-03-84 (618.0100) | EACH | 1 | $0.01 | $4,000.00 | $0.01 |
| 46 | Mobilization (619.1000) | EACH | 1 | $339,264 | $275,000 | $103,662 |
| 47 | Water (624.0100) | MGAL | 70 | $0.05 | $0.05 | $0.05 |
| 48 | Topsoil (625.0105) | CY | 75 | $45.00 | $45.00 | $45.00 |
| 49 | Salvaged topsoil (625.0500) | SY | 6,420 | $4.00 | $4.00 | $4.00 |
| 50 | Silt fence (628.1504) | LF | 1,300 | $2.50 | $2.50 | $2.50 |
| 51 | Silt fence maintenance (628.1520) | LF | 2,600 | $0.01 | $0.01 | $0.01 |
| 52 | Mobilizations erosion control (628.1905) | EACH | 6 | $100.00 | $100.00 | $100.00 |
| 53 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $100.00 | $100.00 |
| 54 | Erosion mat urban class I type A (628.2006) | SY | 6,870 | $1.80 | $1.80 | $1.80 |
| 55 | Inlet protection type A (628.7005) | EACH | 2 | $150.00 | $150.00 | $150.00 |
| 56 | Inlet protection type C (628.7015) | EACH | 2 | $75.00 | $75.00 | $75.00 |
| 57 | Temporary ditch checks (628.7504) | LF | 64 | $10.00 | $10.00 | $10.00 |
| 58 | Rock bags (628.7570) | EACH | 30 | $20.00 | $20.00 | $20.00 |
| 59 | Fertilizer type B (629.0210) | CWT | 4 | $150.00 | $150.00 | $150.00 |
| 60 | Seeding mixture no. 20 (630.0120) | LB | 53 | $9.75 | $9.75 | $9.75 |
| 61 | Seeding mixture no. 75 (630.0175) | LB | 43 | $75.00 | $75.00 | $75.00 |
| 62 | Seeding temporary (630.0200) | LB | 53 | $4.50 | $4.50 | $4.50 |
| 63 | Seed water (630.0500) | MGAL | 180 | $10.00 | $10.00 | $10.00 |
| 64 | Markers culvert end (633.5200) | EACH | 2 | $75.00 | $75.00 | $75.00 |
| 65 | Moving signs type II (638.2102) | EACH | 9 | $175.00 | $175.00 | $175.00 |
| 66 | Moving small sign supports (638.4000) | EACH | 9 | $125.00 | $125.00 | $125.00 |
| 67 | Field office type B (642.5001) | EACH | 1 | $4,500.00 | $8,500.00 | $4,000.00 |
| 68 | Traffic control barricades type III (643.0420) | DAY | 3,224 | $0.50 | $1.00 | $1.00 |
| 69 | Traffic control warning lights type A (643.0705) | DAY | 5,456 | $0.10 | $0.25 | $0.25 |
| 70 | Traffic control signs (643.0900) | DAY | 22,320 | $0.40 | $0.25 | $0.25 |
| 71 | Traffic control covering signs type II (643.0920) | EACH | 21 | $40.00 | $20.00 | $20.00 |
| 72 | Traffic control signs PCMS (643.1050) | DAY | 14 | $75.00 | $100.00 | $100.00 |
| 73 | Traffic control (643.5000) | EACH | 1 | $18,200 | $4,500.00 | $4,500.00 |
| 74 | Geotextile type DF schedule A (645.0111) | SY | 80 | $5.00 | $9.00 | $9.00 |
| 75 | Geotextile type HR (645.0120) | SY | 574 | $5.00 | $9.00 | $8.00 |
| 76 | Marking line epoxy 6-inch (646.2020) | LF | 2,360 | $2.40 | $2.40 | $2.50 |
| 77 | Construction staking storm sewer (650.4000) | EACH | 2 | $150.00 | $250.00 | $300.00 |
| 78 | Construction staking subgrade (650.4500) | LF | 606 | $1.35 | $0.01 | $0.01 |
| 79 | Construction staking base (650.5000) | LF | 606 | $1.35 | $1.00 | $2.00 |
| 80 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 260 | $2.20 | $2.50 | $5.00 |
| 81 | Construction staking pipe culverts (650.6000) | EACH | 2 | $300.00 | $250.00 | $100.00 |
| 82 | Construction staking structure layout (structure) 01. B-25-0198 (650.6501) | EACH | 1 | $4,600.00 | $6,500.00 | $10,000 |
| 83 | Construction staking supplemental control (project) 01. 5952-03-84 (650.9911) | EACH | 1 | $5,000.00 | $1,000.00 | $1.00 |
| 84 | Construction staking slope stakes (650.9920) | LF | 606 | $1.56 | $2.00 | $2.00 |
| 85 | Sawing asphalt (690.0150) | LF | 60 | $8.00 | $8.00 | $8.00 |
| 86 | Incentive strength concrete structures (715.0502) | DOL | 3,084 | $1.00 | $1.00 | $1.00 |
| 87 | Installing and maintaining bird deterrent system (station) 01. 13+05 (999.2000.S) | EACH | 1 | $0.01 | $7,500.00 | $0.01 |
| 88 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 89 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 90 | Special 01. site mowing (SPV.0060) | EACH | 1 | $10,000 | $10,000 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.