WisDOT contract 20261110009 bid tabulation

Edmund - Mineral Point; Mineral Point Branch Br B-25-198 (STH 039, Iowa County Edmund - Mineral Point). Let by Wisconsin DOT on November 10, 2026, Iowa. 4 bids received; low bid $2,256,362 by Lunda Construction Company.

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
90
Data through
10 NOV 2026

3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Lunda Construction Company$2,256,362Low
3Zenith Tech., Inc. - Waukesha$2,562,283+14%
4Sheet Piling Services LLC$2,774,031+23%
WisDOT contract 20261110009: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lunda Construction Company2. Zenith Tech., Inc. - Waukesha3. Sheet Piling Services LLC
1Clearing (201.0105)STA3$250.00$250.00$250.00
2Grubbing (201.0205)STA3$250.00$250.00$250.00
3Removing structure over waterway minimal debris (structure) 01. B-25- 0250 (203.0260)EACH1$200,000$210,000$735,350
4Excavation common (205.0100)CY2,830$15.50$15.50$15.50
5Excavation for structures bridges (structure) 01. B-25-0198 (206.1001)EACH1$75,000$95,000$240,800
6Cofferdams (structure) 01. B-25- 0198 (206.5001)EACH1$150,000$250,000$200,000
7Backfill structure type A (210.1500)TON300$35.00$35.00$35.00
8Finishing roadway (project) 01. 5952-03-84 (213.0100)EACH1$750.00$3,500.00$750.00
9Base aggregate dense 3/4-inch (305.0110)TON260$24.00$24.00$24.00
10Base aggregate dense 1 1/4-inch (305.0120)TON1,900$22.00$22.00$22.00
11Select crushed material (312.0110)TON2,650$20.50$20.50$20.50
12Tack coat (455.0605)GAL120$6.50$6.50$6.50
13Incentive density HMA pavement (460.2000)DOL731$1.00$1.00$1.00
14HMA pavement 4 LT 58-28 S (460.5224)TON731$106.30$106.30$106.30
15Asphaltic rumble strips, centerline (465.0560)LF610$5.29$5.29$5.29
16Concrete masonry bridges (502.0100)CY514$900.00$1,200.00$850.00
17Protective surface treatment (502.3200)SY630$5.00$4.25$3.00
18Pigmented surface sealer (502.3210)SY175$8.00$14.00$3.00
19Underwater substructure inspection (structure) 01. B-25-0198 (502.9000.S)EACH2$5,500.00$5,500.00$0.01
20Prestressed girder type I 36W-inch (503.0137)LF602$350.00$350.00$400.00
21Bar steel reinforcement HS structures (505.0400)LB12,160$1.25$1.40$1.50
22Bar steel reinforcement HS coated structures (505.0600)LB64,910$1.35$1.55$1.60
23Bearing pads elastomeric non- laminated (506.2605)EACH24$150.00$140.00$125.00
24Steel diaphragms (structure) 01. B- 25-0198 (506.4000)EACH9$1,200.00$1,400.00$2,000.00
25Floor drains type GC (514.0445)EACH4$3,500.00$3,900.00$4,000.00
26Downspout 6-inch (514.2625)LF13$150.00$205.00$750.00
27Rubberized membrane waterproofing (516.0500)SY16$25.00$68.00$20.00
28Apron endwalls for culvert pipe 12- inch (520.1012)EACH2$375.00$375.00$375.00
29Culvert pipe corrugated polyethylene 12-inch (530.0112)LF60$42.50$42.50$42.50
30Pre-boring rock or consolidated materials (550.0020)LF550$225.00$310.00$195.00
31Piling steel HP 12-inch X 53 LB (550.1120)LF1,000$70.00$90.00$85.00
32Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF260$30.77$30.77$30.77
33Concrete surface drains (602.3010)CY4$1,000.00$1,000.00$1,000.00
34Riprap medium (606.0200)CY16$58.00$58.00$58.00
35Riprap heavy (606.0300)CY330$90.00$73.00$60.00
36Inlet covers type V (611.0654)EACH2$1,100.00$1,100.00$1,100.00
37Inlets 2X2-FT (611.3220)EACH2$1,850.00$1,850.00$1,850.00
38Pipe underdrain wrapped 6-inch (612.0406)LF250$5.00$9.00$9.00
39Anchor assemblies for steel plate beam guard (614.0150)EACH4$200.00$300.00$250.00
40Salvaged rail (614.0920)LF360$5.00$5.00$5.00
41Salvaged guardrail end treatments (614.0925)EACH4$250.00$250.00$250.00
42MGS guardrail 3 (614.2300)LF325$30.00$30.00$30.00
43MGS thrie beam transition (614.2500)LF160$92.00$92.00$92.00
44MGS guardrail terminal eat (614.2610)EACH4$3,950.00$3,950.00$3,950.00
45Maintenance and repair of haul roads (project) 01. 5952-03-84 (618.0100)EACH1$0.01$4,000.00$0.01
46Mobilization (619.1000)EACH1$339,264$275,000$103,662
47Water (624.0100)MGAL70$0.05$0.05$0.05
48Topsoil (625.0105)CY75$45.00$45.00$45.00
49Salvaged topsoil (625.0500)SY6,420$4.00$4.00$4.00
50Silt fence (628.1504)LF1,300$2.50$2.50$2.50
51Silt fence maintenance (628.1520)LF2,600$0.01$0.01$0.01
52Mobilizations erosion control (628.1905)EACH6$100.00$100.00$100.00
53Mobilizations emergency erosion control (628.1910)EACH5$100.00$100.00$100.00
54Erosion mat urban class I type A (628.2006)SY6,870$1.80$1.80$1.80
55Inlet protection type A (628.7005)EACH2$150.00$150.00$150.00
56Inlet protection type C (628.7015)EACH2$75.00$75.00$75.00
57Temporary ditch checks (628.7504)LF64$10.00$10.00$10.00
58Rock bags (628.7570)EACH30$20.00$20.00$20.00
59Fertilizer type B (629.0210)CWT4$150.00$150.00$150.00
60Seeding mixture no. 20 (630.0120)LB53$9.75$9.75$9.75
61Seeding mixture no. 75 (630.0175)LB43$75.00$75.00$75.00
62Seeding temporary (630.0200)LB53$4.50$4.50$4.50
63Seed water (630.0500)MGAL180$10.00$10.00$10.00
64Markers culvert end (633.5200)EACH2$75.00$75.00$75.00
65Moving signs type II (638.2102)EACH9$175.00$175.00$175.00
66Moving small sign supports (638.4000)EACH9$125.00$125.00$125.00
67Field office type B (642.5001)EACH1$4,500.00$8,500.00$4,000.00
68Traffic control barricades type III (643.0420)DAY3,224$0.50$1.00$1.00
69Traffic control warning lights type A (643.0705)DAY5,456$0.10$0.25$0.25
70Traffic control signs (643.0900)DAY22,320$0.40$0.25$0.25
71Traffic control covering signs type II (643.0920)EACH21$40.00$20.00$20.00
72Traffic control signs PCMS (643.1050)DAY14$75.00$100.00$100.00
73Traffic control (643.5000)EACH1$18,200$4,500.00$4,500.00
74Geotextile type DF schedule A (645.0111)SY80$5.00$9.00$9.00
75Geotextile type HR (645.0120)SY574$5.00$9.00$8.00
76Marking line epoxy 6-inch (646.2020)LF2,360$2.40$2.40$2.50
77Construction staking storm sewer (650.4000)EACH2$150.00$250.00$300.00
78Construction staking subgrade (650.4500)LF606$1.35$0.01$0.01
79Construction staking base (650.5000)LF606$1.35$1.00$2.00
80Construction staking curb gutter and curb & gutter (650.5500)LF260$2.20$2.50$5.00
81Construction staking pipe culverts (650.6000)EACH2$300.00$250.00$100.00
82Construction staking structure layout (structure) 01. B-25-0198 (650.6501)EACH1$4,600.00$6,500.00$10,000
83Construction staking supplemental control (project) 01. 5952-03-84 (650.9911)EACH1$5,000.00$1,000.00$1.00
84Construction staking slope stakes (650.9920)LF606$1.56$2.00$2.00
85Sawing asphalt (690.0150)LF60$8.00$8.00$8.00
86Incentive strength concrete structures (715.0502)DOL3,084$1.00$1.00$1.00
87Installing and maintaining bird deterrent system (station) 01. 13+05 (999.2000.S)EACH1$0.01$7,500.00$0.01
88On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00
89On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00
90Special 01. site mowing (SPV.0060)EACH1$10,000$10,000$7,500.00
WisDOT contract 20261110009: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy