| 1 | Grubbing (201.0205) | STA | 5 | $700.00 | $500.00 | $500.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 205 | $17.00 | $24.95 | $24.95 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,050 | $11.40 | $12.75 | $12.75 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 385 | $5.00 | $5.81 | $5.81 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 2,190 | $5.00 | $4.71 | $4.71 |
| 6 | Removing curb & gutter (204.0150) | LF | 1,350 | $7.60 | $14.75 | $14.75 |
| 7 | Removing guardrail (204.0165) | LF | 370 | $4.00 | $5.00 | $2.75 |
| 8 | Removing surface drains (204.0190) | EACH | 2 | $670.00 | $550.00 | $550.00 |
| 9 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 90 | $23.00 | $45.00 | $45.00 |
| 10 | Removing storm sewer (size) 02. 36-inch (204.0245) | LF | 8 | $26.00 | $105.00 | $105.00 |
| 11 | Excavation common (205.0100) | CY | 400 | $13.25 | $23.50 | $23.50 |
| 12 | Borrow (208.0100) | CY | 360 | $34.00 | $20.50 | $20.50 |
| 13 | Prepare foundation for asphaltic paving (project) 01. 6340-00-62 (211.0101) | EACH | 1 | $9,700.00 | $4,500.00 | $4,500.00 |
| 14 | Finishing roadway (project) 01. 6340-00-62 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $3,500.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 130 | $36.50 | $33.50 | $33.50 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 590 | $33.50 | $25.00 | $25.10 |
| 17 | Concrete pavement approach slab (415.0410) | SY | 215 | $219.00 | $339.40 | $339.40 |
| 18 | Tack coat (455.0605) | GAL | 191 | $9.40 | $9.40 | $9.40 |
| 19 | Asphaltic surface (465.0105) | TON | 530 | $148.94 | $148.94 | $148.94 |
| 20 | Protective surface treatment (502.3200) | SY | 1,125 | $2.25 | $4.00 | $5.00 |
| 21 | Pigmented surface sealer reseal (502.3205) | SY | 162 | $19.00 | $12.00 | $20.00 |
| 22 | Preparation decks type 1 (509.0301) | SY | 47 | $190.00 | $220.00 | $150.00 |
| 23 | Preparation decks type 2 (509.0302) | SY | 24 | $240.00 | $360.00 | $180.00 |
| 24 | Cleaning decks (509.0500) | SY | 905 | $68.00 | $103.00 | $95.00 |
| 25 | Curb repair (509.1200) | LF | 3 | $287.00 | $350.00 | $150.00 |
| 26 | Full-depth deck repair (509.2000) | SY | 12 | $1.00 | $0.01 | $200.00 |
| 27 | Concrete masonry overlay decks (509.2500) | CY | 60 | $1,835.00 | $1,960.00 | $1,250.00 |
| 28 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 6 | $2,130.00 | $1,500.00 | $1,500.00 |
| 29 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $2,680.00 | $4,750.00 | $4,750.00 |
| 30 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 100 | $57.00 | $65.14 | $65.14 |
| 31 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 100 | $63.00 | $68.16 | $68.16 |
| 32 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 98 | $68.00 | $69.73 | $69.73 |
| 33 | Concrete surface drains (602.3010) | CY | 5 | $1,180.00 | $1,578.09 | $1,578.09 |
| 34 | Concrete barrier temporary precast delivered (603.8000) | LF | 400 | $19.50 | $18.00 | $25.00 |
| 35 | Concrete barrier temporary precast installed (603.8125) | LF | 800 | $9.00 | $10.00 | $5.00 |
| 36 | Riprap medium (606.0200) | CY | 20 | $118.00 | $125.00 | $125.00 |
| 37 | Riprap heavy (606.0300) | CY | 280 | $267.00 | $75.00 | $75.00 |
| 38 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 62 | $297.00 | $140.00 | $140.00 |
| 39 | Crash cushions temporary (614.0905) | EACH | 2 | $3,500.00 | $3,500.00 | $3,500.00 |
| 40 | MGS guardrail 3 (614.2300) | LF | 75 | $27.00 | $32.00 | $28.00 |
| 41 | MGS thrie beam transition (614.2500) | LF | 160 | $88.00 | $99.00 | $94.00 |
| 42 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,213.00 | $5,100.00 | $3,400.00 |
| 43 | Maintenance and repair of haul roads (project) 01. 6340-00-62 (618.0100) | EACH | 1 | $15.00 | $500.00 | $0.01 |
| 44 | Mobilization (619.1000) | EACH | 1 | $109,244 | $147,000 | $290,340 |
| 45 | Concrete median sloped nose (620.0300) | SF | 220 | $46.50 | $33.45 | $33.45 |
| 46 | Water (624.0100) | MGAL | 11 | $21.00 | $50.00 | $50.00 |
| 47 | Salvaged topsoil (625.0500) | SY | 2,500 | $3.10 | $4.15 | $4.15 |
| 48 | Mulching (627.0200) | SY | 2,370 | $0.52 | $0.50 | $0.35 |
| 49 | Silt fence (628.1504) | LF | 581 | $3.00 | $2.50 | $2.75 |
| 50 | Silt fence maintenance (628.1520) | LF | 1,162 | $0.03 | $0.01 | $0.01 |
| 51 | Mobilizations erosion control (628.1905) | EACH | 8 | $153.00 | $250.00 | $200.00 |
| 52 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $253.00 | $1.00 | $300.00 |
| 53 | Erosion mat urban class I type B (628.2008) | SY | 130 | $4.00 | $5.00 | $2.10 |
| 54 | Turbidity barriers (628.6005) | SY | 360 | $45.00 | $40.00 | $45.00 |
| 55 | Inlet protection type C (628.7015) | EACH | 4 | $75.00 | $150.00 | $60.00 |
| 56 | Temporary ditch checks (628.7504) | LF | 40 | $10.00 | $12.00 | $9.25 |
| 57 | Fertilizer type B (629.0210) | CWT | 2 | $100.00 | $250.00 | $75.00 |
| 58 | Seeding mixture no. 20 (630.0120) | LB | 130 | $12.00 | $15.00 | $9.25 |
| 59 | Seed water (630.0500) | MGAL | 70 | $5.00 | $10.00 | $1.00 |
| 60 | Moving small sign supports (638.4000) | EACH | 3 | $250.00 | $100.00 | $150.00 |
| 61 | Field office type B (642.5001) | EACH | 1 | $6,400.00 | $6,000.00 | $6,000.00 |
| 62 | Traffic control drums (643.0300) | DAY | 8,634 | $0.15 | $0.15 | $0.15 |
| 63 | Traffic control barricades type III (643.0420) | DAY | 584 | $0.45 | $0.45 | $0.45 |
| 64 | Traffic control flexible tubular marker posts (643.0500) | EACH | 65 | $38.00 | $38.00 | $38.00 |
| 65 | Traffic control flexible tubular marker bases (643.0600) | EACH | 65 | $14.50 | $14.50 | $14.50 |
| 66 | Traffic control warning lights type C (643.0715) | DAY | 3,580 | $0.12 | $0.12 | $0.12 |
| 67 | Traffic control connected arrow boards (643.0810) | DAY | 140 | $10.00 | $10.00 | $10.00 |
| 68 | Traffic control signs (643.0900) | DAY | 2,870 | $0.25 | $0.25 | $0.25 |
| 69 | Traffic control covering signs type II (643.0920) | EACH | 3 | $105.00 | $105.00 | $105.00 |
| 70 | Traffic control signs fixed message (643.1000) | SF | 72 | $14.00 | $14.00 | $14.00 |
| 71 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 280 | $3.80 | $3.80 | $3.80 |
| 72 | Temporary marking line removable tape 6-inch (643.3180) | LF | 20,360 | $2.20 | $2.20 | $2.20 |
| 73 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 48 | $7.10 | $7.10 | $7.10 |
| 74 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 1,610 | $2.80 | $2.80 | $2.80 |
| 75 | Traffic control (643.5000) | EACH | 1 | $27,270 | $47,500 | $27,270 |
| 76 | Geotextile type HR (645.0120) | SY | 114 | $5.25 | $6.50 | $6.50 |
| 77 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 4,799 | $4.10 | $4.10 | $4.10 |
| 78 | Marking curb epoxy (646.8120) | LF | 20 | $25.25 | $25.25 | $25.25 |
| 79 | Marking island nose epoxy (646.8220) | EACH | 2 | $941.00 | $941.00 | $941.00 |
| 80 | Marking removal line 4-inch (646.9000) | LF | 515 | $1.85 | $1.85 | $1.85 |
| 81 | Marking removal special marking (646.9300) | EACH | 2 | $85.00 | $85.00 | $85.00 |
| 82 | Construction staking storm sewer (650.4000) | EACH | 7 | $250.00 | $250.00 | $250.00 |
| 83 | Construction staking supplemental control (project) 01. 6340-00-62 (650.9911) | EACH | 2 | $500.00 | $500.00 | $500.00 |
| 84 | Construction staking slope stakes (650.9920) | LF | 896 | $1.20 | $1.20 | $1.20 |
| 85 | Temporary traffic signals for bridges (structure) 01. B-71-79 (661.0101) | EACH | 1 | $4,250.00 | $4,250.00 | $4,250.00 |
| 86 | Sawing asphalt (690.0150) | LF | 1,987 | $2.00 | $1.94 | $1.94 |
| 87 | Sawing concrete (690.0250) | LF | 22 | $4.00 | $3.95 | $3.95 |
| 88 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 89 | Special 01. driveway assistance device system (SPV.0045) | DAY | 48 | $35.00 | $35.50 | $35.50 |
| 90 | Special 01. paving notch repair (SPV.0090) | LF | 120 | $185.00 | $250.00 | $50.00 |
| 91 | Special 02. salvage and reinstall fence (SPV.0090) | LF | 169 | $25.00 | $35.00 | $177.00 |