WisDOT contract 20261110004 bid tabulation
Town of Bradford, O Riley Road; Turtle Creek Bridge B-53-0390 (LOC STR, Rock County Town of Bradford, O'Riley Rd). Let by Wisconsin DOT on November 10, 2026, Rock. 6 bids received; low bid $2,103,060 by Concrete Structures, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 73
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Structures, Inc. | $2,103,060 | Low |
| 2 | Pheifer Brothers Construction Co., Inc. | $2,141,298 | +2.0% |
| 3 | Zenith Tech., Inc. - Waukesha | $2,185,155 | +4.0% |
| 4 | Radtke Contractors Inc. | $2,208,557 | +5.0% |
| 5 | Sheet Piling Services LLC | $2,215,463 | +5.0% |
| 6 | Lunda Construction Company | $2,407,053 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Structures, Inc. | 2. Pheifer Brothers Construction Co., Inc. | 3. Zenith Tech., Inc. - Waukesha | 4. Radtke Contractors Inc. | 5. Sheet Piling Services LLC | 6. Lunda Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 3 | Removing structure over waterway debris capture (structure) 01. B-53- 0390 (203.0270) | EACH | 1 | $160,000 | $497,600 | $300,000 | $162,587 | $371,000 | $340,000 |
| 4 | Removing guardrail (204.0165) | LF | 376 | $3.00 | $3.00 | $3.00 | $2.95 | $3.00 | $3.00 |
| 5 | Excavation common (205.0100) | CY | 402 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 6 | Excavation for structures bridges (structure) 01. B-53-0390 (206.1001) | EACH | 1 | $50,000 | $55,000 | $15,000 | $104,926 | $157,000 | $97,000 |
| 7 | Cofferdams (structure) 01. B-53- 0390 (206.5001) | EACH | 1 | $140,000 | $170,350 | $200,000 | $159,911 | $175,000 | $150,000 |
| 8 | Borrow (208.0100) | CY | 588 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 9 | Backfill structure type A (210.1500) | TON | 360 | $22.00 | $22.00 | $22.00 | $31.76 | $22.00 | $22.00 |
| 10 | Finishing roadway (project) 01. 3614-00-78 (213.0100) | EACH | 1 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 124 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,478 | $21.00 | $21.00 | $21.00 | $21.00 | $21.00 | $21.00 |
| 13 | Tack coat (455.0605) | GAL | 89 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Asphaltic surface (465.0105) | TON | 373 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 15 | Concrete masonry bridges (502.0100) | CY | 303 | $1,100.00 | $850.00 | $1,200.00 | $1,162.04 | $825.00 | $1,450.00 |
| 16 | Protective surface treatment (502.3200) | SY | 639 | $7.00 | $5.90 | $4.00 | $3.69 | $3.00 | $5.00 |
| 17 | Underwater substructure inspection (structure) 01. B-53-0390 (502.9000.S) | EACH | 2 | $1.00 | $6,400.00 | $1.00 | $4,000.00 | $5,500.00 | $4,800.00 |
| 18 | Prestressed girder type I 28-inch (503.0128) | LF | 788 | $490.00 | $470.00 | $420.00 | $477.51 | $450.00 | $420.00 |
| 19 | Bar steel reinforcement HS structures (505.0400) | LB | 8,960 | $1.45 | $1.45 | $1.62 | $1.40 | $2.50 | $1.45 |
| 20 | Bar steel reinforcement HS coated structures (505.0600) | LB | 33,840 | $1.60 | $1.56 | $1.82 | $1.53 | $2.60 | $1.60 |
| 21 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 30 | $150.00 | $98.00 | $130.00 | $140.10 | $150.00 | $200.00 |
| 22 | Steel diaphragms (structure) 01. B- 53-0390 (506.4000) | EACH | 12 | $1,200.00 | $1,100.00 | $1,000.00 | $612.96 | $1,250.00 | $1,200.00 |
| 23 | Railing tubular type M (513.4061) | LF | 324 | $327.50 | $380.00 | $320.00 | $312.23 | $375.00 | $325.00 |
| 24 | Rubberized membrane waterproofing (516.0500) | SY | 14 | $44.00 | $68.00 | $60.00 | $67.21 | $20.00 | $35.00 |
| 25 | Pre-boring rock or consolidated materials (550.0020) | LF | 884 | $227.00 | $234.00 | $200.00 | $266.38 | $200.00 | $185.00 |
| 26 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 1,150 | $80.50 | $27.00 | $90.00 | $46.44 | $85.00 | $65.00 |
| 27 | Riprap heavy (606.0300) | CY | 260 | $90.00 | $100.27 | $115.00 | $124.84 | $90.00 | $110.00 |
| 28 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 160 | $9.00 | $9.00 | $9.00 | $4.26 | $9.00 | $9.00 |
| 29 | Steel plate beam guard class A (614.0305) | LF | 25 | $30.00 | $30.00 | $30.00 | $35.00 | $30.00 | $30.00 |
| 30 | Steel plate beam guard short radius (614.0345) | LF | 65 | $35.00 | $35.00 | $35.00 | $45.00 | $35.00 | $35.00 |
| 31 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 1 | $3,750.00 | $3,750.00 | $3,750.00 | $4,300.00 | $3,750.00 | $3,750.00 |
| 32 | MGS guardrail 3 (614.2300) | LF | 12.50 | $30.00 | $30.00 | $30.00 | $40.00 | $30.00 | $30.00 |
| 33 | MGS thrie beam transition (614.2500) | LF | 79.20 | $94.25 | $94.25 | $94.25 | $105.00 | $94.25 | $94.25 |
| 34 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,600.00 | $3,600.00 | $3,600.00 | $4,000.00 | $3,600.00 | $3,600.00 |
| 35 | Maintenance and repair of haul roads (project) 01. 3614-00-78 (618.0100) | EACH | 1 | $1,000.00 | $1.00 | $500.00 | $250.00 | $0.01 | $100.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $333,600 | $115,425 | $263,000 | $354,680 | $155,586 | $379,861 |
| 37 | Water (624.0100) | MGAL | 17 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 |
| 38 | Salvaged topsoil (625.0500) | SY | 1,875 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 39 | Erosion bales (628.1104) | EACH | 40 | $15.00 | $15.00 | $15.00 | $14.00 | $15.00 | $15.00 |
| 40 | Silt fence (628.1504) | LF | 1,060 | $2.25 | $2.25 | $2.25 | $1.95 | $2.25 | $2.25 |
| 41 | Silt fence maintenance (628.1520) | LF | 2,120 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 42 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $100.00 | $100.00 | $300.00 | $100.00 | $100.00 |
| 43 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $150.00 | $150.00 | $150.00 | $300.00 | $150.00 | $150.00 |
| 44 | Erosion mat urban class I type B (628.2008) | SY | 1,880 | $2.00 | $2.00 | $2.00 | $1.85 | $2.00 | $2.00 |
| 45 | Turbidity barriers (628.6005) | SY | 250 | $44.00 | $44.00 | $44.00 | $38.00 | $44.00 | $44.00 |
| 46 | Temporary ditch checks (628.7504) | LF | 60 | $8.25 | $8.25 | $8.25 | $7.95 | $8.25 | $8.25 |
| 47 | Fertilizer type B (629.0210) | CWT | 1.50 | $75.00 | $75.00 | $75.00 | $95.00 | $75.00 | $75.00 |
| 48 | Seeding mixture no. 75 (630.0175) | LB | 16 | $75.00 | $75.00 | $75.00 | $100.00 | $75.00 | $75.00 |
| 49 | Seeding temporary (630.0200) | LB | 66 | $2.25 | $2.25 | $2.25 | $8.00 | $2.25 | $2.25 |
| 50 | Seed water (630.0500) | MGAL | 55.50 | $20.00 | $20.00 | $20.00 | $10.00 | $20.00 | $20.00 |
| 51 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $90.00 | $90.00 | $90.00 | $95.00 | $90.00 | $90.00 |
| 52 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 1 | $95.00 | $95.00 | $95.00 | $100.00 | $95.00 | $95.00 |
| 53 | Signs type II reflective H (637.2210) | SF | 5.18 | $24.00 | $24.00 | $24.00 | $30.00 | $24.00 | $24.00 |
| 54 | Signs type II reflective F (637.2230) | SF | 12 | $26.00 | $26.00 | $26.00 | $30.00 | $26.00 | $26.00 |
| 55 | Removing signs type II (638.2602) | EACH | 6 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 56 | Removing small sign supports (638.3000) | EACH | 6 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 57 | Field office type B (642.5001) | EACH | 1 | $2,000.00 | $5,200.00 | $9,000.00 | $3,238.72 | $4,500.00 | $6,500.00 |
| 58 | Traffic control barricades type III (643.0420) | DAY | 4,590 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 59 | Traffic control warning lights type A (643.0705) | DAY | 6,120 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 60 | Traffic control signs (643.0900) | DAY | 4,760 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 61 | Traffic control (643.5000) | EACH | 1 | $4,000.00 | $4,000.00 | $8,500.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 62 | Geotextile type DF schedule A (645.0111) | SY | 100 | $9.00 | $9.00 | $9.00 | $5.98 | $9.00 | $9.00 |
| 63 | Geotextile type HR (645.0120) | SY | 470 | $8.00 | $7.76 | $8.00 | $6.76 | $8.00 | $8.00 |
| 64 | Construction staking subgrade (650.4500) | LF | 405 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 65 | Construction staking base (650.5000) | LF | 405 | $0.01 | $0.01 | $2.00 | $0.01 | $2.00 | $2.00 |
| 66 | Construction staking structure layout (structure) 01. B-53-0390 (650.6501) | EACH | 1 | $5,000.00 | $5,000.00 | $10,000 | $5,000.00 | $10,000 | $10,000 |
| 67 | Construction staking supplemental control (project) 01. 3614-00-78 (650.9911) | EACH | 1 | $1,500.00 | $1,500.00 | $2,000.00 | $1,500.00 | $2,000.00 | $2,000.00 |
| 68 | Construction staking slope stakes (650.9920) | LF | 405 | $0.01 | $0.01 | $2.00 | $0.01 | $2.00 | $2.00 |
| 69 | Sawing asphalt (690.0150) | LF | 66 | $8.00 | $8.00 | $2.95 | $2.95 | $8.00 | $8.00 |
| 70 | Incentive strength concrete structures (715.0502) | DOL | 1,830 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | Installing and maintaining bird deterrent system (station) 01. 10+02.50 (999.2000.S) | EACH | 1 | $1.00 | $100.00 | $1.00 | $2,140.05 | $0.01 | $0.01 |
| 72 | Special 01. steel thrie beam structure approach curved (SPV.0090) | LF | 42 | $185.00 | $185.00 | $185.00 | $175.00 | $185.00 | $185.00 |
| 73 | Special 01. creek bed stone (SPV.0195) | TON | 125 | $75.00 | $76.00 | $70.00 | $41.44 | $35.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.