Concrete Structures, Inc.: WisDOT bid record

Concrete Structures, Inc. submitted 80 bids on Wisconsin DOT contracts in the data, from 11 JAN 2022 to 10 NOV 2026, and was the low bidder on 34 of them (43%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Wisconsin DOT
Low bid volume
$23,481,375
Latest bid
10 NOV 2026
Data through
10 NOV 2026
80Bids
34Low bids
43Win rate, percent
+7.0%Median gap to the low bid when not low, 46 bids

By year

YearBidsLow bidsWin rate
2022181161%
20239111%
202415747%
2025231043%
202615533%
Concrete Structures, Inc., WisDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Dane20945%
Sauk10330%
Vernon800%
Crawford5240%
Iowa5240%
Lafayette4375%
Waukesha4250%
Racine3267%
Grant3133%
Dodge3267%
Walworth3267%
Rock3267%
Concrete Structures, Inc., WisDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Incentive strength concrete structures715.0502DOL7777 (100%)$1.00$1.00
Construction staking subgrade650.4500LF7069 (99%)$0.01$0.01
Tack coat455.0605GAL7164 (90%)$4.00$3.85
Backfill structure type A210.1500TON7661 (80%)$23.00$26.00
Base aggregate dense 3/4-inch305.0110TON7660 (79%)$25.00$30.00
Traffic control signs643.0900DAY7859 (76%)$0.50$0.40
Silt fence maintenance628.1520LF7859 (76%)$0.01$0.02
On-the-job training graduate at $5.00/HRASP.1T0GHRS5959 (100%)$5.00$5.00
On-the-job training apprentice at $5.00/HRASP.1T0AHRS5959 (100%)$5.00$5.00
Removing small sign supports638.3000EACH7358 (79%)$35.00$30.00
Traffic control warning lights type A643.0705DAY7857 (73%)$0.15$0.12
Base aggregate dense 1 1/4-inch305.0120TON7757 (74%)$20.30$20.80
Concrete Structures, Inc., WisDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Concrete Structures, Inc., WisDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
10 NOV 202620261110004RockTown of Bradford, O Riley Road; Turtle Creek Bridge B-53-0390 (LOC STR, Rock County Town of Bradford, O'Riley Rd)1 of 6$2,103,060Low, 2.0% under the second
10 NOV 202620261110006Grant5629-00-762 of 6$914,3150.0%
15 SEP 202620260915001Sauk5738-00-742 of 6$1,002,217+1.0%
11 AUG 202620260811006DaneT Primrose, Lewis Road; W Br Sugar River Bridge B-13-0929 (LOC STR, Dane County Lewis Road)2 of 6$410,130+2.0%
12 MAY 202620260512004RockT Newark, Cleophas Road; Raccoon Creek Bridge B-53-0391 (LOC STR, Rock County T Newark, Cleophas Road)1 of 4$499,056Low
10 MAR 202620260310005DodgeCTH P - Hartford; Butler Creek Bridge B-14-0231 (CTH N, Dodge County CTH P - Hartford)1 of 4$706,565Low
10 MAR 202620260310008VernonTown of Sterling, Prairie Road; Rush Creek Bridge B-62-0272 (LOC STR, Vernon County Town of Sterling, Prairie Road)2 of 4$520,080+7.0%
10 MAR 202620260310011Dane5889-00-731 of 3$1,534,353Low, 23% under the second
10 FEB 202620260210002DaneSTH 73 - USH 12 (CTH Pq); Koshkonong Creek Bridge B-13-0910 (LOC STR, Dane County STH 73 - USH 12 (CTH PQ); Koshkonong Creek Bridge B-13-0912 of 4$998,840+25%
10 FEB 202620260210004SaukCTH I - USH 12 (CTH W); Skillet Creek Bridge B-56-0246 (CTH W, Sauk County CTH I - USH 12 (CTH W))3 of 5$980,815+10%
10 FEB 202620260210019WalworthT Linn - Hillside Road; Bridge Over Cmstpp Railroad P64-101 (LOC STR, Walworth County T Linn - Hillside Road)2 of 4$1,969,932+5.0%
13 JAN 202620260113004JeffersonT Hebron, Hagedorn Road; Duck Creek Bridge B-28-0204 (LOC STR, Jefferson County T Hebron, Hagedorn Road)3 of 5$447,170+8.0%
13 JAN 202620260113005DaneTown Burke, Daentl Road; Token Creek Bridge B-13-0912 (LOC STR, Dane County Town Burke, Daentl Road)1 of 6$766,775Low, 4.0% under the second
13 JAN 202620260113011CrawfordV Desoto, Mill Park Drive; Mississippi Trib Bridge B-12-0258 (LOC STR, Crawford County V Desoto, Mill Park Drive)3 of 5$661,337+1.0%
13 JAN 202620260113013IowaT Mifflin - T Linden (CTH E); E Pecatonica River Bridge B-25-0199 (CTH E, Iowa County T Mifflin - T Linden (CTH E))2 of 4$1,294,938+8.0%
09 DEC 202520251209008DaneCTH J - STH 78; Vermont Creek Bridge B-13-0928 (CTH JJ, Dane County CTH J - STH 78)1 of 6$484,447Low
09 DEC 202520251209009SaukTown of Sumpter, Stones Pocket Road; Otter Creek Bridge B-56-0249 (LOC STR, Sauk County Town of Sumpter, Stones Pocket Road)1 of 6$376,251Low, 4.0% under the second
09 DEC 202520251209010SaukTown of Ironton, Pickel Road; Br Narrows Creek Bridge B-56-0253 (LOC STR, Sauk County Town of Ironton, Pickel Road)1 of 6$494,532Low, 5.0% under the second
09 DEC 202520251209015WaukeshaC Oconomowoc, N Lapham St; Oconomowoc River Bridge P67-770 (LOC STR, Waukesha County C Oconomowoc, N Lapham St)3 of 6$1,152,547+7.0%
14 OCT 202520251014004VernonTown of Coon, Dodson Hollow Road; Dodson Hollow Creek Br B-62-0270 (LOC STR, Vernon County Town of Coon, Dodson Hollow Road)6 of 6$542,426+21%
09 SEP 202520250909002IowaTown of Wyoming, Lake View Road; Sneed Creek Bridge B-25-0197 (LOC STR, Iowa County Town of Wyoming)1 of 4$350,424Low, 6.0% under the second
09 SEP 202520250909003SaukTown of Lavalle, Stout Road; Crossman Creek Bridge B-56-0248 (LOC STR, Sauk County Town of Lavalle, Stout Road)2 of 5$393,7680.0%
12 AUG 202520250812005GrantT Hickory Grove, Sleepy Hollow Road; Saunders Creek Bridge B-22-0315 (LOC STR, Grant County T Hickory Grove, Sleepy Hollow Road)1 of 4$456,069Low, 11% under the second
10 JUN 202520250610007WaukeshaSTH 16 S Frontage Rd-Wisconsin Ave; Plank Rd to Brown St, B-67-579 (OFF SYS, Waukesha County STH 16 S Frontage Rd - Wisconsin Ave)1 of 4$1,509,749Low, 28% under the second
08 APR 202520250408002Dane3672-00-702 of 5$1,457,952+1.0%
Concrete Structures, Inc.: latest WisDOT bids in the data

How this record was read

WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

  • Every bid counted here matched its published total to within one dollar; WisDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy