WisDOT contract 20250408002 bid tabulation
3672-00-70. Let by Wisconsin DOT on April 8, 2025, Dane. 5 bids received; low bid $1,446,013 by Pheifer Brothers Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 85
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pheifer Brothers Construction Co., Inc. | $1,446,013 | Low |
| 2 | Concrete Structures, Inc. | $1,457,952 | +1.0% |
| 3 | R.G. Huston Company, Inc. | $1,525,405 | +5.0% |
| 4 | Radtke Contractors Inc. | $1,530,964 | +6.0% |
| 5 | Lunda Construction Company | $1,744,350 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pheifer Brothers Construction Co., Inc. | 2. Concrete Structures, Inc. | 3. R.G. Huston Company, Inc. | 4. Radtke Contractors Inc. | 5. Lunda Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Abatement of asbestos containing material (structure) 01. B-13-056 (203.0211.S) | EACH | 1 | $3,700.00 | $3,675.00 | $3,675.00 | $3,675.00 | $12,000 |
| 2 | Removing structure over waterway minimal debris (structure) 01. B-13- 056 (203.0260) | EACH | 1 | $273,000 | $90,800 | $65,000 | $60,273 | $110,000 |
| 3 | Removing structure over waterway minimal debris (structure) 02. B-13- 950 (203.0260) | EACH | 1 | $19,458 | $50,000 | $16,200 | $54,883 | $110,000 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 1,507 | $8.20 | $8.20 | $8.28 | $7.40 | $8.20 |
| 5 | Removing guardrail (204.0165) | LF | 502 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 6 | Excavation common (205.0100) | CY | 559 | $14.00 | $14.00 | $17.30 | $14.00 | $14.00 |
| 7 | Excavation for structures bridges (structure) 01. B-13-909 (206.1001) | EACH | 1 | $38,800 | $20,000 | $20,200 | $48,950 | $20,000 |
| 8 | Excavation for structures culverts (structure) 01. B-13-914 (206.2001) | EACH | 1 | $21,000 | $30,000 | $17,500 | $61,752 | $20,000 |
| 9 | Cofferdams (structure) 01. B-13-909 (206.5001) | EACH | 1 | $32,900 | $49,500 | $67,000 | $62,298 | $115,000 |
| 10 | Cofferdams (structure) 02. B-13-914 (206.5001) | EACH | 1 | $31,815 | $42,500 | $50,000 | $97,435 | $115,000 |
| 11 | Borrow (208.0100) | CY | 448 | $15.50 | $15.50 | $17.50 | $15.50 | $15.50 |
| 12 | Backfill structure type A (210.1500) | TON | 240 | $25.00 | $25.00 | $37.40 | $37.27 | $25.00 |
| 13 | Backfill structure type B (210.2500) | TON | 748 | $21.50 | $27.00 | $33.00 | $32.41 | $27.00 |
| 14 | Finishing roadway (project) 01. 3672-00-70 (213.0100) | EACH | 1 | $500.00 | $500.00 | $1,000.00 | $500.00 | $500.00 |
| 15 | Finishing roadway (project) 02. 3672-00-72 (213.0100) | EACH | 1 | $500.00 | $500.00 | $1,000.00 | $500.00 | $500.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 184 | $22.00 | $22.00 | $24.00 | $22.00 | $22.00 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 909 | $17.05 | $17.05 | $19.00 | $17.05 | $17.05 |
| 18 | Breaker run (311.0110) | TON | 320 | $18.00 | $25.00 | $18.00 | $38.38 | $30.00 |
| 19 | Concrete pavement 12-inch (415.0120) | SY | 24 | $125.00 | $125.00 | $126.26 | $125.00 | $125.00 |
| 20 | Concrete pavement approach slab (415.0410) | SY | 88 | $285.75 | $285.75 | $288.64 | $285.75 | $285.75 |
| 21 | Tack coat (455.0605) | GAL | 123 | $3.00 | $3.00 | $3.03 | $3.00 | $3.00 |
| 22 | Asphaltic surface (465.0105) | TON | 537 | $92.20 | $92.20 | $93.13 | $90.00 | $92.20 |
| 23 | Concrete masonry bridges (502.0100) | CY | 258 | $560.00 | $1,000.00 | $1,077.00 | $728.66 | $950.00 |
| 24 | Protective surface treatment (502.3200) | SY | 363 | $4.70 | $7.00 | $4.65 | $3.73 | $4.00 |
| 25 | Underwater substructure inspection (structure) 01. B-13-909 (502.9000.S) | EACH | 1 | $5,100.00 | $1.00 | $0.01 | $500.00 | $7,500.00 |
| 26 | Concrete masonry culverts (504.0100) | CY | 251 | $1,116.00 | $1,000.00 | $1,360.00 | $873.27 | $980.00 |
| 27 | Bar steel reinforcement HS structures (505.0400) | LB | 26,750 | $1.03 | $1.20 | $1.45 | $1.30 | $1.10 |
| 28 | Bar steel reinforcement HS coated structures (505.0600) | LB | 57,660 | $1.14 | $1.40 | $1.40 | $1.44 | $1.20 |
| 29 | Railing tubular type M (513.4061) | LF | 214 | $300.00 | $294.00 | $330.00 | $269.88 | $300.00 |
| 30 | Rubberized membrane waterproofing (516.0500) | SY | 53 | $63.72 | $37.00 | $44.00 | $75.07 | $25.00 |
| 31 | Pile points (550.0500) | EACH | 20 | $120.00 | $250.00 | $175.00 | $116.87 | $115.00 |
| 32 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 1,500 | $17.00 | $55.00 | $49.00 | $34.04 | $38.00 |
| 33 | Riprap light (606.0100) | CY | 138 | $68.00 | $75.00 | $83.00 | $154.66 | $68.00 |
| 34 | Riprap heavy (606.0300) | CY | 150 | $102.50 | $75.00 | $78.00 | $125.27 | $75.00 |
| 35 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 136 | $9.00 | $9.00 | $4.50 | $4.29 | $9.00 |
| 36 | MGS guardrail 3 (614.2300) | LF | 75 | $31.00 | $31.00 | $31.00 | $31.00 | $31.00 |
| 37 | MGS guardrail 3 K (614.2330) | LF | 100 | $36.00 | $36.00 | $36.00 | $36.00 | $36.00 |
| 38 | MGS thrie beam transition (614.2500) | LF | 157.60 | $88.00 | $88.00 | $88.00 | $88.00 | $88.00 |
| 39 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 40 | Maintenance and repair of haul roads (project) 01. 3672-00-70 (618.0100) | EACH | 1 | $1.00 | $1.00 | $100.00 | $250.00 | $1.00 |
| 41 | Maintenance and repair of haul roads (project) 02. 3672-00-72 (618.0100) | EACH | 1 | $1.00 | $1.00 | $100.00 | $250.00 | $1.00 |
| 42 | Mobilization (619.1000) | EACH | 1 | $92,072 | $78,625 | $69,000 | $159,903 | $199,193 |
| 43 | Water (624.0100) | MGAL | 23 | $0.01 | $0.01 | $75.00 | $0.01 | $0.01 |
| 44 | Salvaged topsoil (625.0500) | SY | 1,196 | $2.75 | $2.75 | $3.40 | $2.75 | $2.75 |
| 45 | Mulching (627.0200) | SY | 83 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 46 | Silt fence (628.1504) | LF | 1,567 | $2.45 | $2.45 | $2.45 | $2.45 | $2.45 |
| 47 | Silt fence maintenance (628.1520) | LF | 1,567 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 48 | Mobilizations erosion control (628.1905) | EACH | 12 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 49 | Mobilizations emergency erosion control (628.1910) | EACH | 12 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 50 | Erosion mat urban class I type B (628.2008) | SY | 1,164 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 51 | Turbidity barriers (628.6005) | SY | 342 | $56.00 | $56.00 | $56.00 | $56.00 | $56.00 |
| 52 | Fertilizer type B (629.0210) | CWT | 1.60 | $175.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 53 | Seeding mixture no. 20 (630.0120) | LB | 55 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 54 | Seeding temporary (630.0200) | LB | 28 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 55 | Seed water (630.0500) | MGAL | 46 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 56 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 4 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 57 | Moving signs type II (638.2102) | EACH | 4 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 58 | Removing signs type II (638.2602) | EACH | 8 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 59 | Removing small sign supports (638.3000) | EACH | 12 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 60 | Field office type B (642.5001) | EACH | 1 | $6,300.00 | $1,750.00 | $1,000.00 | $2,887.82 | $6,000.00 |
| 61 | Traffic control barricades type III (643.0420) | DAY | 3,892 | $0.25 | $0.55 | $0.25 | $0.25 | $0.55 |
| 62 | Traffic control warning lights type A (643.0705) | DAY | 7,784 | $0.10 | $0.15 | $0.10 | $0.10 | $0.15 |
| 63 | Traffic control signs (643.0900) | DAY | 29,631 | $0.50 | $0.18 | $0.51 | $0.50 | $0.18 |
| 64 | Traffic control covering signs type II (643.0920) | EACH | 6 | $50.00 | $105.00 | $50.51 | $50.00 | $105.00 |
| 65 | Traffic control signs PCMS (643.1050) | DAY | 28 | $35.00 | $55.00 | $35.35 | $35.00 | $55.00 |
| 66 | Traffic control (643.5000) | EACH | 1 | $5,000.00 | $15,850 | $5,050.51 | $5,000.00 | $15,850 |
| 67 | Geotextile type C (645.0105) | SY | 355 | $4.00 | $3.00 | $2.30 | $5.95 | $5.00 |
| 68 | Geotextile type DF schedule A (645.0111) | SY | 90 | $8.00 | $8.00 | $1.70 | $5.17 | $8.00 |
| 69 | Geotextile type HR (645.0120) | SY | 300 | $6.00 | $6.00 | $4.30 | $5.39 | $6.00 |
| 70 | Marking line epoxy 4-inch (646.1020) | LF | 2,718.50 | $2.00 | $2.00 | $2.75 | $2.00 | $2.00 |
| 71 | Construction staking subgrade (650.4500) | LF | 836 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 72 | Construction staking base (650.5000) | LF | 836 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 73 | Construction staking structure layout (structure) 01. B-13-909 (650.6501) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 74 | Construction staking structure layout (structure) 02. B-13-914 (650.6501) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 75 | Construction staking concrete pavement (650.7000) | LF | 30 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 76 | Construction staking supplemental control (project) 01. 3672-00-70 (650.9911) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 77 | Construction staking supplemental control (project) 02. 3672-00-72 (650.9911) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 78 | Construction staking slope stakes (650.9920) | LF | 836 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 79 | Sawing asphalt (690.0150) | LF | 92 | $8.00 | $8.00 | $2.35 | $8.00 | $2.35 |
| 80 | Incentive strength concrete structures (715.0502) | DOL | 2,946 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 82 | Maintaining bird deterrent system (station) 01. 106+27 (999.2005.S) | EACH | 1 | $0.01 | $750.00 | $100.00 | $1.00 | $0.01 |
| 83 | Maintaining bird deterrent system (station) 02. 103+19 (999.2005.S) | EACH | 1 | $600.00 | $750.00 | $100.00 | $1.00 | $0.01 |
| 84 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 85 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.