WisDOT contract 20251209008 bid tabulation

CTH J - STH 78; Vermont Creek Bridge B-13-0928 (CTH JJ, Dane County CTH J - STH 78). Let by Wisconsin DOT on December 9, 2025, Dane. 6 bids received; low bid $484,447 by Concrete Structures, Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
65
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Concrete Structures, Inc.$484,447Low
3Radtke Contractors Inc.$533,734+10%
4R.G. Huston Company, Inc.$535,752+11%
5Larson Construction Co., Inc.$547,409+13%
6Lunda Construction Company$587,264+21%
WisDOT contract 20251209008: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Concrete Structures, Inc.2. Radtke Contractors Inc.3. R.G. Huston Company, Inc.4. Larson Construction Co., Inc.5. Lunda Construction Company
1Removing structure over waterway remove debris (structure) 01. P-13- 0918 (203.0250)EACH1$15,000$38,409$57,970$36,494$145,500
2Removing guardrail (204.0165)LF194$5.00$5.00$5.00$5.00$5.00
3Excavation common (205.0100)CY364$16.00$16.00$13.75$16.00$16.00
4Excavation for structures bridges (structure) 01. B-13-0928 (206.1001)EACH1$26,000$29,125$6,625.00$33,899$15,000
5Backfill structure type A (210.1500)TON296$26.00$26.46$49.90$24.00$24.00
6Finishing roadway (project) 01. 5844-00-75 (213.0100)EACH1$500.00$500.00$645.00$500.00$500.00
7Base aggregate dense 3/4-inch (305.0110)TON145$21.00$21.00$45.00$21.00$21.00
8Base aggregate dense 1 1/4-inch (305.0120)TON703$17.75$17.75$22.45$17.75$17.75
9Concrete pavement 12-inch (415.0120)SY22$150.00$150.00$250.00$151.50$150.00
10Concrete pavement approach slab (415.0410)SY74$220.00$220.00$219.80$222.00$220.00
11Tack coat (455.0605)GAL42$3.00$3.00$3.00$3.03$3.00
12Incentive density HMA pavement (460.2000)DOL150$1.00$1.00$1.00$1.00$1.00
13HMA pavement 4 LT 58-28 S (460.5224)TON231$102.00$102.00$102.00$103.02$102.00
14Concrete masonry bridges (502.0100)CY112$1,300.00$899.02$1,360.00$890.00$850.00
15Protective surface treatment (502.3200)SY167$7.00$3.82$7.40$4.25$5.00
16Bar steel reinforcement HS structures (505.0400)LB4,400$1.35$1.36$1.49$1.50$1.30
17Bar steel reinforcement HS coated structures (505.0600)LB16,410$1.45$1.44$1.53$1.60$1.45
18Railing tubular type M (513.4061)LF74$302.00$298.55$335.00$368.40$350.00
19Rubberized membrane waterproofing (516.0500)SY12$37.00$70.25$51.50$65.00$25.00
20Piling cip concrete 10 3/4 X 0.365- inch (550.2106)LF910$55.00$48.06$60.80$78.00$45.00
21Riprap heavy (606.0300)CY101$75.00$82.03$81.95$75.00$75.00
22Pipe underdrain wrapped 6-inch (612.0406)LF146$8.00$4.35$3.25$8.00$8.00
23MGS guardrail 3 (614.2300)LF37.50$28.00$28.00$35.00$35.00$28.00
24MGS thrie beam transition (614.2500)LF158$95.00$95.00$92.00$92.00$95.00
25MGS guardrail terminal eat (614.2610)EACH4$3,500.00$3,500.00$4,200.00$4,200.00$3,500.00
26Maintenance and repair of haul roads (project) 01. 5844-00-75 (618.0100)EACH1$100.00$250.00$80.00$2,500.00$1.00
27Mobilization (619.1000)EACH1$44,700$115,641$30,950$80,069$81,434
28Water (624.0100)MGAL14$0.01$0.01$76.00$0.01$0.01
29Salvaged topsoil (625.0500)SY916$3.50$3.50$1.80$3.50$3.50
30Silt fence (628.1504)LF644$2.75$2.75$2.50$2.50$2.75
31Silt fence maintenance (628.1520)LF644$0.01$0.01$0.01$0.01$0.01
32Mobilizations erosion control (628.1905)EACH3$250.00$250.00$100.00$100.00$250.00
33Mobilizations emergency erosion control (628.1910)EACH2$50.00$50.00$100.00$100.00$50.00
34Erosion mat urban class I type B (628.2008)SY799$2.00$2.00$2.20$2.20$2.00
35Erosion mat class II type C (628.2027)SY33$4.75$4.75$10.00$10.00$4.75
36Turbidity barriers (628.6005)SY123$45.00$45.00$60.00$60.00$45.00
37Temporary ditch checks (628.7504)LF8$20.00$20.00$20.00$20.00$20.00
38Fertilizer type B (629.0210)CWT0.70$150.00$150.00$300.00$300.00$150.00
39Seeding mixture no. 10 (630.0110)LB26$10.00$10.00$20.00$20.00$10.00
40Seed water (630.0500)MGAL22$20.00$20.00$10.00$10.00$20.00
41Posts wood 4X6-inch X 16-FT (634.0616)EACH5$110.00$110.00$100.00$100.00$110.00
42Signs type II reflective F (637.2230)SF23.25$20.00$20.00$30.00$30.00$20.00
43Removing signs type II (638.2602)EACH5$25.00$25.00$45.00$45.00$25.00
44Removing small sign supports (638.3000)EACH5$25.00$25.00$45.00$45.00$25.00
45Field office type B (642.5001)EACH1$1,500.00$2,529.04$5,500.00$3,500.00$3,500.00
46Traffic control barricades type III (643.0420)DAY938$1.00$1.00$1.00$1.00$1.00
47Traffic control warning lights type A (643.0705)DAY1,876$0.25$0.25$0.25$0.25$0.25
48Traffic control signs (643.0900)DAY11,993$0.25$0.25$0.25$0.25$0.25
49Traffic control covering signs type II (643.0920)EACH2$25.00$25.00$25.00$25.00$25.00
50Traffic control signs PCMS (643.1050)DAY14$79.00$79.00$79.00$79.00$79.00
51Traffic control (643.5000)EACH1$2,500.00$4,500.00$2,500.00$2,500.00$2,500.00
52Geotextile type DF schedule A (645.0111)SY92$8.00$5.07$1.25$8.00$8.00
53Geotextile type HR (645.0120)SY155$6.00$5.60$2.85$6.00$6.00
54Marking line epoxy 6-inch (646.2020)LF1,340$3.40$3.40$3.40$3.40$4.45
55Construction staking subgrade (650.4500)LF100$0.01$0.01$0.01$0.01$0.01
56Construction staking base (650.5000)LF100$0.01$0.01$0.01$0.01$2.00
57Construction staking structure layout (structure) 01. B-13-0928 (650.6501)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,000.00
58Construction staking supplemental control (project) 01. 5844-00-75 (650.9911)EACH1$500.00$500.00$500.00$500.00$400.00
59Construction staking slope stakes (650.9920)LF415$0.01$0.01$0.01$0.01$1.25
60Sawing asphalt (690.0150)LF44$8.00$2.95$2.95$8.00$8.00
61Incentive strength concrete structures (715.0502)DOL672$1.00$1.00$1.00$1.00$1.00
62Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00$1.00
63Maintaining bird deterrent system (station) 01. 14+00 (999.2005.S)EACH1$1.00$0.01$625.00$4,600.00$0.01
64Special 01. salvage and reinstall signs (SPV.0060)EACH5$100.00$100.00$250.00$250.00$100.00
65Special 01. select crushed material for travel corridor (SPV.0195)TON8$50.00$125.74$195.00$165.00$100.00
WisDOT contract 20251209008: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy