Larson Construction Co., Inc.: WisDOT bid record

Larson Construction Co., Inc. submitted 178 bids on Wisconsin DOT contracts in the data, from 11 JAN 2022 to 10 NOV 2026, and was the low bidder on 93 of them (52%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Wisconsin DOT
Low bid volume
$61,663,004
Latest bid
10 NOV 2026
Data through
10 NOV 2026
178Bids
93Low bids
52Win rate, percent
+7.0%Median gap to the low bid when not low, 85 bids

By year

YearBidsLow bidsWin rate
2022322166%
2023181267%
2024391641%
2025522854%
2026371643%
Larson Construction Co., Inc., WisDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Clark211571%
Marathon17847%
Trempealeau11873%
Buffalo99100%
Dunn9667%
Taylor9333%
Jackson7343%
Chippewa7457%
Sauk7114%
Lincoln6350%
Douglas6350%
Barron6350%
Larson Construction Co., Inc., WisDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Incentive strength concrete structures715.0502DOL179179 (100%)$1.00$1.00
Traffic control643.5000EACH177161 (91%)$2,000.00$7,500.00
Traffic control barricades type III643.0420DAY175160 (91%)$0.45$0.60
Traffic control warning lights type A643.0705DAY174154 (89%)$0.10$0.12
Construction staking subgrade650.4500LF170153 (90%)$0.01$0.01
Traffic control signs643.0900DAY175150 (86%)$0.40$0.40
Tack coat455.0605GAL151137 (91%)$10.00$3.85
Construction staking slope stakes650.9920LF154132 (86%)$1.00$1.00
Asphaltic surface465.0105TON147129 (88%)$163.35$151.62
On-the-job training graduate at $5.00/HRASP.1T0GHRS129129 (100%)$5.00$5.00
On-the-job training apprentice at $5.00/HRASP.1T0AHRS128128 (100%)$5.00$5.00
Silt fence maintenance628.1520LF175124 (71%)$0.01$0.02
Larson Construction Co., Inc., WisDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Larson Construction Co., Inc., WisDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
10 NOV 202620261110006Grant5629-00-763 of 6$928,149+2.0%
10 NOV 202620261110024PortageSTH 66 - CTH C; Bear Creek Bridge, B-49-0203 (CTH II, Portage County STH 66 - CTH C)1 of 6$717,328Low, 5.0% under the second
10 NOV 202620261110032JacksonMelrose - Black River Falls; Roaring Ck B27076,Douglas Ck B27016 (STH 054, Jackson County Melrose - Black River Falls)1 of 4$1,462,456Low, 2.0% under the second
10 NOV 202620261110036JacksonWest Salem - Melrose; Sand Creek B-27-0010 (STH 108, Jackson County West Salem - Melrose)4 of 6$602,271+2.0%
13 OCT 202620261013017MarathonSTH 29 - CTH A; Br Big Rib River Bridge, B-37-0500 (CTH S, Marathon County STH 29 - CTH A)1 of 6$564,976Low, 4.0% under the second
13 OCT 202620261013019MarathonWood Co Line - STH 97; Mcgivern Creek Bridge, B-37-0496 (CTH T, Marathon County Wood Co Line - STH 97)4 of 6$653,642+4.0%
13 OCT 202620261013027ClarkGreenwood - Spencer; Bear Creek Bridge B-10-0252 (STH 098, Clark County Greenwood - Spencer)1 of 6$1,114,442Low, 11% under the second
13 OCT 202620261013030DunnElk Mound - Bloomer; Branch Sinking Creek C-17-0051 (STH 040, Dunn County Elk Mound - Bloomer)5 of 6$779,487+20%
15 SEP 202620260915001Sauk5738-00-743 of 6$1,027,356+4.0%
15 SEP 202620260915005JuneauT Orange, Schroeder Road; Ltl Lemonweir Rvr Bridge B-29-0169 (LOC STR, Juneau County T Orange, Schroeder Road)1 of 5$595,035Low, 15% under the second
11 AUG 202620260811008MonroeT Lagrange, Ellsworth Road; Br Mill Creek Bridge, B-41-0338 (LOC STR, Monroe County T Lagrange, Ellsworth Road)4 of 5$473,521+5.0%
12 MAY 202620260512017JacksonT Albion, Old Hwy 54 Rd; Spring Creek Bridge B-27-0183 (LOC STR, Jackson County T Albion, Old Hwy 54 Rd)2 of 4$563,010+8.0%
12 MAY 202620260512023ClarkT Withee, Pine Road; S Fk Eau Claire R Bridge B-10-0262 (LOC STR, Clark County T Withee, Pine Road)1 of 5$432,951Low
14 APR 202620260414025TrempealeauT Arcadia, Middle Road; Myers Valley Creek Bridge B-61-0294 (LOC STR, Trempealeau County T Arcadia, Middle Road)1 of 4$447,891Low
10 MAR 202620260310030PriceT Ogema, Larkin Road; Holmes Creek Bridge, B-50-0097 (LOC STR, Price County T Ogema, Larkin Road)1 of 5$408,245Low
10 MAR 202620260310036LangladeT Ackley, Range Line Road; Black Brook Bridge, B-34-0066 (LOC STR, Langlade County T Ackley, Range Line Road)2 of 5$433,903+11%
10 MAR 202620260310040ClarkT Worden, Worden Road; Wolf River Bridge B-10-0259 (LOC STR, Clark County T Worden, Worden Road)1 of 4$817,652Low, 15% under the second
10 MAR 202620260310042PolkT Clear Lake, 30th Street; Willow River Bridge B-48-0061 (LOC STR, Polk County T Clear Lake, 30th Street)1 of 4$402,544Low
10 MAR 202620260310044DouglasLake Nebagamon - Winneboujou; Nebagamon Creek Bridge B-16-0159 (CTH B, Douglas County Lake Nebagamon - Winneboujou)1 of 3$565,907Low
10 FEB 202620260210033IronT Kimball, Town Park Drive; W Br Montreal River Bridge B260047 (LOC STR, Iron County T Kimball, Town Park Drive)2 of 4$542,045+1.0%
10 FEB 202620260210038JacksonT Hixton, Cain Road; N Br Trempealeau River Br B-27-0178 (LOC STR, Jackson County T Hixton, Cain Road)2 of 4$674,665+1.0%
10 FEB 202620260210040ClarkT Loyal, Spencer Road; Rock Creek Bridge B-10-0258 (LOC STR, Clark County T Loyal, Spencer Road)1 of 5$446,989Low
10 FEB 202620260210041SawyerSTH 40 - STH 27; Chippewa River Bridge B-57-0018 (CTH D, Sawyer County STH 40 - STH 27)1 of 5$1,080,394Low, 19% under the second
10 FEB 202620260210043PolkAmery - CTH I; Apple River Bridge B-48-0062 (CTH H, Polk County Amery - CTH I)1 of 4$790,773Low, 18% under the second
13 JAN 202620260113008MonroeT Tomah, Interior Road; Lemonweir Creek Bridge, B-41-0339 (LOC STR, Monroe County T Tomah, Interior Road)4 of 5$516,311+17%
Larson Construction Co., Inc.: latest WisDOT bids in the data

How this record was read

WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

  • Every bid counted here matched its published total to within one dollar; WisDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy