WisDOT contract 20261110032 bid tabulation
Melrose - Black River Falls; Roaring Ck B27076,Douglas Ck B27016 (STH 054, Jackson County Melrose - Black River Falls). Let by Wisconsin DOT on November 10, 2026, Jackson. 4 bids received; low bid $1,462,456 by Larson Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 90
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Larson Construction Co., Inc. | $1,462,456 | Low |
| 2 | Lunda Construction Company | $1,485,423 | +2.0% |
| 3 | Sheet Piling Services LLC | $1,582,638 | +8.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $1,639,374 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Lunda Construction Company | 3. Sheet Piling Services LLC | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway debris capture (structure) 01. B-27- 76 (203.0270) | EACH | 1 | $154,900 | $150,000 | $375,000 | $73,000 |
| 2 | Removing structure over waterway debris capture (structure) 02. B-27- 16 (203.0270) | EACH | 1 | $76,672 | $225,000 | $210,000 | $110,000 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 97 | $9.88 | $9.88 | $9.88 | $9.88 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 684 | $9.88 | $9.88 | $9.88 | $9.88 |
| 5 | Removing guardrail (204.0165) | LF | 675 | $3.40 | $2.50 | $2.00 | $2.00 |
| 6 | Excavation common (205.0100) | CY | 481 | $20.00 | $20.00 | $20.00 | $20.00 |
| 7 | Excavation for structures bridges (structure) 01. B-27-76 (206.1001) | EACH | 1 | $5,800.00 | $30,000 | $20,000 | $6,000.00 |
| 8 | Excavation for structures bridges (structure) 02. B-27-16 (206.1001) | EACH | 1 | $5,800.00 | $5,000.00 | $20,000 | $2,000.00 |
| 9 | Borrow (208.0100) | CY | 106 | $27.00 | $27.00 | $27.00 | $27.00 |
| 10 | Backfill structure type A (210.1500) | TON | 200 | $27.00 | $27.00 | $27.00 | $70.00 |
| 11 | Finishing roadway (project) 01. 7550-00-77 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 | $1,500.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 126 | $38.00 | $38.00 | $38.00 | $38.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,080 | $26.00 | $26.00 | $26.00 | $26.00 |
| 14 | Concrete pavement 6-inch (415.0060) | SY | 42 | $167.17 | $167.17 | $167.17 | $167.17 |
| 15 | Concrete pavement approach slab (415.0410) | SY | 112 | $376.41 | $376.41 | $376.41 | $376.41 |
| 16 | Drilled tie bars (416.0610) | EACH | 22 | $16.03 | $16.03 | $16.03 | $16.03 |
| 17 | Tack coat (455.0605) | GAL | 110 | $8.59 | $8.59 | $8.59 | $8.59 |
| 18 | Asphaltic surface (465.0105) | TON | 277 | $150.93 | $150.93 | $150.93 | $150.93 |
| 19 | Asphaltic rumble strips, centerline (465.0560) | LF | 208 | $18.89 | $18.70 | $20.00 | $18.70 |
| 20 | Concrete masonry bridges (502.0100) | CY | 253 | $1,010.00 | $1,000.00 | $925.00 | $2,000.00 |
| 21 | Expansion device (502.3101) | LF | 77 | $423.00 | $300.00 | $300.00 | $285.00 |
| 22 | Protective surface treatment (502.3200) | SY | 1,029 | $4.00 | $5.00 | $5.00 | $4.00 |
| 23 | Pigmented surface sealer (502.3210) | SY | 69 | $6.00 | $8.00 | $5.00 | $15.00 |
| 24 | Adhesive anchors 3/4-inch (502.4106) | EACH | 5 | $57.00 | $30.00 | $50.00 | $30.00 |
| 25 | Adhesive anchors no. 5 bar (502.4205) | EACH | 86 | $20.00 | $25.00 | $35.00 | $30.00 |
| 26 | Bar steel reinforcement HS coated structures (505.0600) | LB | 75,610 | $2.00 | $1.35 | $1.65 | $1.55 |
| 27 | Steel diaphragms (structure) 01. B- 27-76 (506.4000) | EACH | 4 | $2,490.00 | $1,200.00 | $1,500.00 | $1,750.00 |
| 28 | Concrete surface repair (509.1500) | SF | 14 | $225.00 | $250.00 | $200.00 | $250.00 |
| 29 | Railing tubular type M (513.4061) | LF | 294 | $479.00 | $325.00 | $325.00 | $335.00 |
| 30 | Rubberized membrane waterproofing (516.0500) | SY | 4 | $135.00 | $25.00 | $30.00 | $68.00 |
| 31 | Preparation and coating of top flanges (structure) 01. B-27-16 (517.0901.S) | EACH | 1 | $23,120 | $12,150 | $12,150 | $12,150 |
| 32 | Containment and collection of waste materials (structure) 01. B- 27-16 (517.4001.S) | EACH | 1 | $1,800.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 33 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 150 | $75.32 | $75.32 | $75.32 | $75.32 |
| 34 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 74 | $75.32 | $75.32 | $75.32 | $75.32 |
| 35 | Concrete surface drains (602.3010) | CY | 22 | $1,702.15 | $1,702.15 | $1,702.15 | $1,702.15 |
| 36 | Riprap light (606.0100) | CY | 3 | $150.00 | $150.00 | $150.00 | $269.73 |
| 37 | Riprap medium (606.0200) | CY | 12 | $150.00 | $150.00 | $150.00 | $278.09 |
| 38 | Riprap heavy (606.0300) | CY | 11 | $150.00 | $150.00 | $150.00 | $278.76 |
| 39 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 140 | $9.00 | $9.00 | $9.00 | $34.46 |
| 40 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $260.00 | $200.00 | $500.00 | $500.00 |
| 41 | MGS guardrail 3 (614.2300) | LF | 150 | $29.00 | $28.25 | $27.00 | $27.00 |
| 42 | MGS thrie beam transition (614.2500) | LF | 315.20 | $110.60 | $96.25 | $88.00 | $88.00 |
| 43 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,715.00 | $4,000.00 | $3,373.00 | $3,373.00 |
| 44 | Maintenance and repair of haul roads (project) 01. 7550-00-77 (618.0100) | EACH | 1 | $3,000.00 | $0.01 | $0.01 | $1,500.00 |
| 45 | Mobilization (619.1000) | EACH | 1 | $194,320 | $180,920 | $63,308 | $255,000 |
| 46 | Water (624.0100) | MGAL | 12.50 | $25.00 | $25.00 | $25.00 | $25.00 |
| 47 | Salvaged topsoil (625.0500) | SY | 1,660 | $1.50 | $1.50 | $1.50 | $1.50 |
| 48 | Silt fence (628.1504) | LF | 1,850 | $2.00 | $2.25 | $2.25 | $2.00 |
| 49 | Silt fence maintenance (628.1520) | LF | 2,960 | $0.01 | $0.01 | $0.01 | $0.03 |
| 50 | Mobilizations erosion control (628.1905) | EACH | 10 | $100.00 | $100.00 | $200.00 | $103.00 |
| 51 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $50.00 | $150.00 | $250.00 | $203.00 |
| 52 | Erosion mat urban class I type B (628.2008) | SY | 1,660 | $1.80 | $2.00 | $2.25 | $1.87 |
| 53 | Turbidity barriers (628.6005) | SY | 45 | $65.00 | $40.00 | $50.00 | $43.00 |
| 54 | Culvert pipe checks (628.7555) | EACH | 10 | $18.00 | $20.00 | $32.00 | $25.00 |
| 55 | Fertilizer type B (629.0210) | CWT | 2 | $135.00 | $70.00 | $100.00 | $100.00 |
| 56 | Seeding mixture no. 30 (630.0130) | LB | 150 | $8.80 | $8.25 | $8.50 | $9.00 |
| 57 | Seeding temporary (630.0200) | LB | 85 | $3.35 | $2.50 | $7.00 | $7.00 |
| 58 | Seed water (630.0500) | MGAL | 70 | $0.01 | $20.00 | $1.00 | $5.00 |
| 59 | Moving signs type II (638.2102) | EACH | 4 | $130.00 | $200.00 | $25.00 | $150.00 |
| 60 | Field office type B (642.5001) | EACH | 1 | $4,000.00 | $5,000.00 | $1,500.00 | $9,000.00 |
| 61 | Traffic control drums (643.0300) | DAY | 760 | $0.20 | $0.20 | $0.20 | $0.20 |
| 62 | Traffic control barricades type III (643.0420) | DAY | 4,140 | $0.55 | $0.55 | $0.55 | $0.55 |
| 63 | Traffic control warning lights type A (643.0705) | DAY | 8,280 | $0.10 | $0.10 | $0.10 | $0.10 |
| 64 | Traffic control signs (643.0900) | DAY | 51,060 | $0.30 | $0.30 | $0.30 | $0.30 |
| 65 | Traffic control covering signs type II (643.0920) | EACH | 25 | $40.00 | $40.00 | $40.00 | $40.00 |
| 66 | Traffic control signs PCMS (643.1050) | DAY | 14 | $65.00 | $65.00 | $65.00 | $65.00 |
| 67 | Traffic control (643.5000) | EACH | 1 | $15,000 | $15,000 | $15,000 | $15,000 |
| 68 | Geotextile type DF schedule A (645.0111) | SY | 84 | $6.00 | $6.00 | $6.00 | $6.00 |
| 69 | Geotextile type HR (645.0120) | SY | 64 | $6.00 | $6.00 | $6.00 | $16.86 |
| 70 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 2,402 | $5.00 | $5.00 | $5.00 | $5.00 |
| 71 | Construction staking subgrade (650.4500) | LF | 200 | $0.01 | $0.01 | $0.01 | $0.01 |
| 72 | Construction staking base (650.5000) | LF | 158 | $0.01 | $1.00 | $0.01 | $1.00 |
| 73 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 150 | $5.00 | $2.00 | $5.00 | $2.00 |
| 74 | Construction staking structure layout (structure) 01. B-27-016 (650.6501) | EACH | 1 | $3,000.00 | $1,000.00 | $3,000.00 | $1,000.00 |
| 75 | Construction staking structure layout (structure) 02. B-27-076 (650.6501) | EACH | 1 | $3,000.00 | $1,000.00 | $3,000.00 | $1,000.00 |
| 76 | Construction staking concrete pavement (650.7000) | LF | 42 | $5.00 | $8.00 | $5.00 | $8.00 |
| 77 | Construction staking resurfacing reference (650.8000) | LF | 454 | $1.00 | $0.15 | $1.00 | $0.15 |
| 78 | Construction staking supplemental control (project) 01. 7550-00-77 (650.9911) | EACH | 1 | $750.00 | $2,000.00 | $750.00 | $2,000.00 |
| 79 | Construction staking slope stakes (650.9920) | LF | 654 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Sawing asphalt (690.0150) | LF | 732 | $3.75 | $3.75 | $3.75 | $2.00 |
| 81 | Incentive strength concrete structures (715.0502) | DOL | 1,560 | $1.00 | $1.00 | $1.00 | $1.00 |
| 82 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | Installing and maintaining bird deterrent system (station) 01. station 110+00 (999.2000.S) | EACH | 1 | $4,600.00 | $0.01 | $0.01 | $10,000 |
| 84 | Installing and maintaining bird deterrent system (station) 02. station 333+50 (999.2000.S) | EACH | 1 | $3,000.00 | $0.01 | $0.01 | $8,000.00 |
| 85 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 86 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 87 | Special 01. salvage and reinstall energy absorbing terminal (SPV.0060) | EACH | 2 | $1,050.00 | $2,250.00 | $2,000.00 | $2,000.00 |
| 88 | Special 02. cleaning and painting bearings (SPV.0060) | EACH | 20 | $690.00 | $600.00 | $600.00 | $600.00 |
| 89 | Special 01.salvage and reinstall guardrail (SPV.0090) | LF | 225 | $11.75 | $22.00 | $11.00 | $11.00 |
| 90 | Special 02. flashing stainless steel (SPV.0090) | LF | 289 | $46.10 | $60.00 | $65.00 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way