WisDOT contract 20261110032 bid tabulation

Melrose - Black River Falls; Roaring Ck B27076,Douglas Ck B27016 (STH 054, Jackson County Melrose - Black River Falls). Let by Wisconsin DOT on November 10, 2026, Jackson. 4 bids received; low bid $1,462,456 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
90
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$1,462,456Low
2Lunda Construction Company$1,485,423+2.0%
3Sheet Piling Services LLC$1,582,638+8.0%
4Zenith Tech., Inc. - Waukesha$1,639,374+12%
WisDOT contract 20261110032: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Lunda Construction Company3. Sheet Piling Services LLC4. Zenith Tech., Inc. - Waukesha
1Removing structure over waterway debris capture (structure) 01. B-27- 76 (203.0270)EACH1$154,900$150,000$375,000$73,000
2Removing structure over waterway debris capture (structure) 02. B-27- 16 (203.0270)EACH1$76,672$225,000$210,000$110,000
3Removing asphaltic surface butt joints (204.0115)SY97$9.88$9.88$9.88$9.88
4Removing asphaltic surface milling (204.0120)SY684$9.88$9.88$9.88$9.88
5Removing guardrail (204.0165)LF675$3.40$2.50$2.00$2.00
6Excavation common (205.0100)CY481$20.00$20.00$20.00$20.00
7Excavation for structures bridges (structure) 01. B-27-76 (206.1001)EACH1$5,800.00$30,000$20,000$6,000.00
8Excavation for structures bridges (structure) 02. B-27-16 (206.1001)EACH1$5,800.00$5,000.00$20,000$2,000.00
9Borrow (208.0100)CY106$27.00$27.00$27.00$27.00
10Backfill structure type A (210.1500)TON200$27.00$27.00$27.00$70.00
11Finishing roadway (project) 01. 7550-00-77 (213.0100)EACH1$500.00$500.00$500.00$1,500.00
12Base aggregate dense 3/4-inch (305.0110)TON126$38.00$38.00$38.00$38.00
13Base aggregate dense 1 1/4-inch (305.0120)TON1,080$26.00$26.00$26.00$26.00
14Concrete pavement 6-inch (415.0060)SY42$167.17$167.17$167.17$167.17
15Concrete pavement approach slab (415.0410)SY112$376.41$376.41$376.41$376.41
16Drilled tie bars (416.0610)EACH22$16.03$16.03$16.03$16.03
17Tack coat (455.0605)GAL110$8.59$8.59$8.59$8.59
18Asphaltic surface (465.0105)TON277$150.93$150.93$150.93$150.93
19Asphaltic rumble strips, centerline (465.0560)LF208$18.89$18.70$20.00$18.70
20Concrete masonry bridges (502.0100)CY253$1,010.00$1,000.00$925.00$2,000.00
21Expansion device (502.3101)LF77$423.00$300.00$300.00$285.00
22Protective surface treatment (502.3200)SY1,029$4.00$5.00$5.00$4.00
23Pigmented surface sealer (502.3210)SY69$6.00$8.00$5.00$15.00
24Adhesive anchors 3/4-inch (502.4106)EACH5$57.00$30.00$50.00$30.00
25Adhesive anchors no. 5 bar (502.4205)EACH86$20.00$25.00$35.00$30.00
26Bar steel reinforcement HS coated structures (505.0600)LB75,610$2.00$1.35$1.65$1.55
27Steel diaphragms (structure) 01. B- 27-76 (506.4000)EACH4$2,490.00$1,200.00$1,500.00$1,750.00
28Concrete surface repair (509.1500)SF14$225.00$250.00$200.00$250.00
29Railing tubular type M (513.4061)LF294$479.00$325.00$325.00$335.00
30Rubberized membrane waterproofing (516.0500)SY4$135.00$25.00$30.00$68.00
31Preparation and coating of top flanges (structure) 01. B-27-16 (517.0901.S)EACH1$23,120$12,150$12,150$12,150
32Containment and collection of waste materials (structure) 01. B- 27-16 (517.4001.S)EACH1$1,800.00$1,500.00$1,500.00$1,500.00
33Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF150$75.32$75.32$75.32$75.32
34Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF74$75.32$75.32$75.32$75.32
35Concrete surface drains (602.3010)CY22$1,702.15$1,702.15$1,702.15$1,702.15
36Riprap light (606.0100)CY3$150.00$150.00$150.00$269.73
37Riprap medium (606.0200)CY12$150.00$150.00$150.00$278.09
38Riprap heavy (606.0300)CY11$150.00$150.00$150.00$278.76
39Pipe underdrain wrapped 6-inch (612.0406)LF140$9.00$9.00$9.00$34.46
40Anchor assemblies for steel plate beam guard (614.0150)EACH4$260.00$200.00$500.00$500.00
41MGS guardrail 3 (614.2300)LF150$29.00$28.25$27.00$27.00
42MGS thrie beam transition (614.2500)LF315.20$110.60$96.25$88.00$88.00
43MGS guardrail terminal eat (614.2610)EACH4$3,715.00$4,000.00$3,373.00$3,373.00
44Maintenance and repair of haul roads (project) 01. 7550-00-77 (618.0100)EACH1$3,000.00$0.01$0.01$1,500.00
45Mobilization (619.1000)EACH1$194,320$180,920$63,308$255,000
46Water (624.0100)MGAL12.50$25.00$25.00$25.00$25.00
47Salvaged topsoil (625.0500)SY1,660$1.50$1.50$1.50$1.50
48Silt fence (628.1504)LF1,850$2.00$2.25$2.25$2.00
49Silt fence maintenance (628.1520)LF2,960$0.01$0.01$0.01$0.03
50Mobilizations erosion control (628.1905)EACH10$100.00$100.00$200.00$103.00
51Mobilizations emergency erosion control (628.1910)EACH3$50.00$150.00$250.00$203.00
52Erosion mat urban class I type B (628.2008)SY1,660$1.80$2.00$2.25$1.87
53Turbidity barriers (628.6005)SY45$65.00$40.00$50.00$43.00
54Culvert pipe checks (628.7555)EACH10$18.00$20.00$32.00$25.00
55Fertilizer type B (629.0210)CWT2$135.00$70.00$100.00$100.00
56Seeding mixture no. 30 (630.0130)LB150$8.80$8.25$8.50$9.00
57Seeding temporary (630.0200)LB85$3.35$2.50$7.00$7.00
58Seed water (630.0500)MGAL70$0.01$20.00$1.00$5.00
59Moving signs type II (638.2102)EACH4$130.00$200.00$25.00$150.00
60Field office type B (642.5001)EACH1$4,000.00$5,000.00$1,500.00$9,000.00
61Traffic control drums (643.0300)DAY760$0.20$0.20$0.20$0.20
62Traffic control barricades type III (643.0420)DAY4,140$0.55$0.55$0.55$0.55
63Traffic control warning lights type A (643.0705)DAY8,280$0.10$0.10$0.10$0.10
64Traffic control signs (643.0900)DAY51,060$0.30$0.30$0.30$0.30
65Traffic control covering signs type II (643.0920)EACH25$40.00$40.00$40.00$40.00
66Traffic control signs PCMS (643.1050)DAY14$65.00$65.00$65.00$65.00
67Traffic control (643.5000)EACH1$15,000$15,000$15,000$15,000
68Geotextile type DF schedule A (645.0111)SY84$6.00$6.00$6.00$6.00
69Geotextile type HR (645.0120)SY64$6.00$6.00$6.00$16.86
70Marking line grooved wet ref epoxy 6-inch (646.2040)LF2,402$5.00$5.00$5.00$5.00
71Construction staking subgrade (650.4500)LF200$0.01$0.01$0.01$0.01
72Construction staking base (650.5000)LF158$0.01$1.00$0.01$1.00
73Construction staking curb gutter and curb & gutter (650.5500)LF150$5.00$2.00$5.00$2.00
74Construction staking structure layout (structure) 01. B-27-016 (650.6501)EACH1$3,000.00$1,000.00$3,000.00$1,000.00
75Construction staking structure layout (structure) 02. B-27-076 (650.6501)EACH1$3,000.00$1,000.00$3,000.00$1,000.00
76Construction staking concrete pavement (650.7000)LF42$5.00$8.00$5.00$8.00
77Construction staking resurfacing reference (650.8000)LF454$1.00$0.15$1.00$0.15
78Construction staking supplemental control (project) 01. 7550-00-77 (650.9911)EACH1$750.00$2,000.00$750.00$2,000.00
79Construction staking slope stakes (650.9920)LF654$1.00$1.00$1.00$1.00
80Sawing asphalt (690.0150)LF732$3.75$3.75$3.75$2.00
81Incentive strength concrete structures (715.0502)DOL1,560$1.00$1.00$1.00$1.00
82Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00
83Installing and maintaining bird deterrent system (station) 01. station 110+00 (999.2000.S)EACH1$4,600.00$0.01$0.01$10,000
84Installing and maintaining bird deterrent system (station) 02. station 333+50 (999.2000.S)EACH1$3,000.00$0.01$0.01$8,000.00
85On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
86On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00
87Special 01. salvage and reinstall energy absorbing terminal (SPV.0060)EACH2$1,050.00$2,250.00$2,000.00$2,000.00
88Special 02. cleaning and painting bearings (SPV.0060)EACH20$690.00$600.00$600.00$600.00
89Special 01.salvage and reinstall guardrail (SPV.0090)LF225$11.75$22.00$11.00$11.00
90Special 02. flashing stainless steel (SPV.0090)LF289$46.10$60.00$65.00$45.00
WisDOT contract 20261110032: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy