WisDOT contract 20261110006 bid tabulation

5629-00-76. Let by Wisconsin DOT on November 10, 2026, Grant. 6 bids received; low bid $909,889 by Radtke Contractors Inc..

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
67
Data through
10 NOV 2026

4 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Radtke Contractors Inc.$909,889Low
2Concrete Structures, Inc.$914,3150.0%
3Larson Construction Co., Inc.$928,149+2.0%
5Sheet Piling Services LLC$1,057,530+16%
WisDOT contract 20261110006: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Radtke Contractors Inc.2. Concrete Structures, Inc.3. Larson Construction Co., Inc.4. Sheet Piling Services LLC
1Clearing (201.0105)STA3$1,000.00$250.00$2,000.00$2,995.00
2Grubbing (201.0205)STA3$1,000.00$250.00$2,000.00$725.00
3Removing structure over waterway remove debris (structure) 02. P-22- 0317 (203.0250)EACH1$44,720$8,000.00$30,000$82,000
4Removing structure over waterway minimal debris (structure) 01. P-22- 0316 (203.0260)EACH1$44,720$8,000.00$31,500$82,000
5Excavation common (205.0100)CY230$30.00$18.00$18.00$18.00
6Excavation for structures bridges (structure) 01. B-22-0312 (206.1001)EACH1$23,637$6,000.00$21,000$64,500
7Excavation for structures bridges (structure) 02. B-22-0313 (206.1001)EACH1$30,522$6,000.00$21,000$64,500
8Borrow (208.0100)CY134$35.00$18.00$18.00$18.00
9Backfill structure type A (210.1500)TON1,010$38.60$30.00$30.00$30.00
10Finishing roadway (project) 01. 5629-00-76 (213.0100)EACH1$1,000.00$750.00$1,000.00$750.00
11Finishing roadway (project) 02. 5629-00-77 (213.0100)EACH1$1,000.00$750.00$1,000.00$750.00
12Base aggregate dense 3/4-inch (305.0110)TON40$33.00$25.00$25.00$25.00
13Base aggregate dense 1 1/4-inch (305.0120)TON347$30.00$23.00$23.00$23.00
14Breaker run (311.0110)TON359$30.00$23.00$23.00$23.00
15Tack coat (455.0605)GAL53$7.50$7.50$7.50$7.50
16Asphaltic surface (465.0105)TON170$133.75$133.75$133.75$133.75
17Concrete masonry bridges (502.0100)CY344$732.97$1,200.00$775.00$850.00
18Protective surface treatment (502.3200)SY369$4.26$7.00$3.00$2.50
19Bar steel reinforcement HS structures (505.0400)LB8,300$1.40$1.50$1.70$1.40
20Bar steel reinforcement HS coated structures (505.0600)LB36,440$1.44$1.70$1.70$1.50
21Railing tubular type M (513.4061)LF244$331.07$351.00$429.00$351.00
22Rubberized membrane waterproofing (516.0500)SY28$67.21$44.00$60.00$18.00
23Pile points (550.0500)EACH26$116.05$150.00$250.00$140.00
24Piling steel HP 10-inch X 42 LB (550.1100)LF820$48.95$65.00$75.00$50.00
25Riprap heavy (606.0300)CY290$68.38$70.00$74.00$70.00
26Pipe underdrain wrapped 6-inch (612.0406)LF360$5.19$9.00$9.00$9.00
27Maintenance and repair of haul roads (project) 01. 5629-00-76 (618.0100)EACH1$250.00$1.00$500.00$0.01
28Maintenance and repair of haul roads (project) 02. 5629-00-77 (618.0100)EACH1$250.00$1.00$500.00$0.01
29Mobilization (619.1000)EACH1$130,616$73,800$115,000$81,951
30Water (624.0100)MGAL7$15.00$0.05$0.05$0.05
31Salvaged topsoil (625.0500)SY780$4.00$4.00$4.00$4.00
32Silt fence (628.1504)LF865$2.05$2.20$2.20$2.20
33Silt fence maintenance (628.1520)LF1,725$0.01$0.01$0.01$0.01
34Mobilizations erosion control (628.1905)EACH8$350.00$600.00$600.00$600.00
35Mobilizations emergency erosion control (628.1910)EACH8$350.00$100.00$100.00$100.00
36Erosion mat urban class I type B (628.2008)SY780$2.05$2.29$2.29$2.29
37Turbidity barriers (628.6005)SY269$38.00$50.00$50.00$50.00
38Temporary ditch checks (628.7504)LF120$5.90$8.95$8.95$8.95
39Fertilizer type B (629.0210)CWT0.70$95.00$110.00$110.00$110.00
40Seeding mixture no. 75 (630.0175)LB6$125.00$115.00$115.00$115.00
41Seeding temporary (630.0200)LB29$8.00$3.55$3.55$3.55
42Seed water (630.0500)MGAL23$10.00$25.00$25.00$25.00
43Posts wood 4X6-inch X 12-FT (634.0612)EACH8$135.00$100.00$100.00$100.00
44Signs type II reflective F (637.2230)SF24$25.00$25.00$25.00$25.00
45Removing signs type II (638.2602)EACH12$25.00$25.00$25.00$25.00
46Removing small sign supports (638.3000)EACH12$25.00$25.00$25.00$25.00
47Field office type B (642.5001)EACH1$3,238.72$2,000.00$6,000.00$5,000.00
48Traffic control barricades type III (643.0420)DAY3,852$1.00$0.25$1.00$1.00
49Traffic control warning lights type A (643.0705)DAY5,136$0.20$0.10$0.20$0.20
50Traffic control signs (643.0900)DAY2,996$1.00$0.15$1.00$1.00
51Traffic control (643.5000)EACH1$2,000.00$9,500.00$2,000.00$2,000.00
52Geotextile type DF schedule A (645.0111)SY186$5.61$9.00$9.00$9.00
53Geotextile type HR (645.0120)SY630$6.46$8.00$3.50$8.00
54Construction staking subgrade (650.4500)LF308$0.01$0.01$0.01$0.01
55Construction staking base (650.5000)LF308$1.00$0.01$0.01$2.00
56Construction staking structure layout (structure) 01. B-22-0312 (650.6501)EACH1$2,100.00$2,200.00$2,200.00$3,100.00
57Construction staking structure layout (structure) 02. B-22-0313 (650.6501)EACH1$2,100.00$2,200.00$2,200.00$3,100.00
58Construction staking supplemental control (project) 01. 5629-00-76 (650.9911)EACH1$750.00$1,000.00$1,000.00$700.00
59Construction staking supplemental control (project) 02. 5629-00-77 (650.9911)EACH1$750.00$1,000.00$1,000.00$700.00
60Construction staking slope stakes (650.9920)LF308$1.00$0.01$0.01$2.00
61Sawing asphalt (690.0150)LF110$2.95$8.00$8.00$8.00
62Incentive strength concrete structures (715.0502)DOL2,064$1.00$1.00$1.00$1.00
63Installing and maintaining bird deterrent system (station) 01. 10+00 (999.2000.S)EACH1$0.01$1.00$50.00$0.01
64Installing and maintaining bird deterrent system (station) 02. 10+00 (999.2000.S)EACH1$0.01$1.00$50.00$0.01
65On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00
66On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
67Special 01. site mowing (SPV.0060)EACH2$1,500.00$3,000.00$3,000.00$3,000.00
WisDOT contract 20261110006: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy