WisDOT contract 20260210041 bid tabulation

STH 40 - STH 27; Chippewa River Bridge B-57-0018 (CTH D, Sawyer County STH 40 - STH 27). Let by Wisconsin DOT on February 10, 2026, Sawyer. 5 bids received; low bid $1,080,394 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
10 FEB 2026
Pay items
69
Data through
10 NOV 2026

4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$1,080,394Low
2Sheet Piling Services LLC$1,288,935+19%
4Lunda Construction Company$1,496,889+39%
5Zenith Tech., Inc. - Waukesha$1,515,386+40%
WisDOT contract 20260210041: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Sheet Piling Services LLC3. Lunda Construction Company4. Zenith Tech., Inc. - Waukesha
1Clearing (201.0105)STA2$250.00$250.00$1,515.00$1,515.00
2Grubbing (201.0205)STA2$250.00$250.00$750.00$750.00
3Removing structure over waterway debris capture (structure) 01. B-57- 0018 (203.0270)EACH1$193,400$425,000$250,000$330,000
4Removing asphaltic surface butt joints (204.0115)SY25$37.25$37.25$37.25$37.25
5Removing asphaltic surface milling (204.0120)SY300$37.25$37.25$37.25$37.25
6Removing guardrail (204.0165)LF482$2.50$2.50$3.15$3.15
7Excavation common (205.0100)CY411$17.73$17.73$31.00$31.00
8Excavation for structures bridges (structure) 01. B-57-0018 (206.1001)EACH1$6,600.00$50,000$15,000$8,800.00
9Backfill structure type A (210.1500)TON150$31.31$31.31$25.00$24.30
10Finishing roadway (project) 01. 8460-00-70 (213.0100)EACH1$1,000.00$1,000.00$500.00$500.00
11Base aggregate dense 3/4-inch (305.0110)TON205$30.40$30.40$25.65$25.65
12Base aggregate dense 1 1/4-inch (305.0120)TON900$22.76$22.76$24.00$24.00
13Tack coat (455.0605)GAL92$8.51$8.51$8.51$8.51
14Asphaltic surface (465.0105)TON330$130.00$130.00$130.00$130.00
15Concrete masonry bridges (502.0100)CY353.90$942.00$850.00$850.00$1,625.00
16Protective surface treatment (502.3200)SY860$3.00$2.50$5.00$4.30
17Pigmented surface sealer (502.3210)SY260$8.00$2.50$10.00$13.75
18Adhesive anchors no. 4 bar (502.4204)EACH66$22.00$10.00$25.00$27.00
19Adhesive anchors no. 5 bar (502.4205)EACH148$24.00$20.00$30.00$31.00
20Bar steel reinforcement HS coated structures (505.0600)LB80,780$2.00$2.00$1.52$1.50
21Bearing pads elastomeric non- laminated (506.2605)EACH8$125.00$150.00$150.00$124.00
22Steel diaphragms (structure) 01. B- 57-0018 (506.4000)EACH9$2,200.00$1,800.00$2,000.00$3,300.00
23Removing bearings (structure) 01. B-57-0018 (506.7050.S)EACH8$100.00$100.00$1,000.00$1,200.00
24Concrete surface repair (509.1500)SF100$111.40$50.00$125.00$250.00
25Rubberized membrane waterproofing (516.0500)SY18$55.00$18.00$25.00$65.00
26Pipe underdrain wrapped 6-inch (612.0406)LF150$7.50$7.50$8.00$8.00
27Anchor assemblies for steel plate beam guard (614.0150)EACH4$225.00$250.00$200.00$300.00
28MGS guardrail 3 (614.2300)LF50$31.75$31.75$25.50$25.50
29MGS thrie beam transition (614.2500)LF160$97.50$97.50$94.00$94.00
30MGS guardrail terminal eat (614.2610)EACH4$3,800.00$3,800.00$3,750.00$3,750.00
31Maintenance and repair of haul roads (project) 01. 8460-00-70 (618.0100)EACH1$500.00$0.01$0.01$2,100.00
32Mobilization (619.1000)EACH1$133,000$121,874$559,587$150,000
33Water (624.0100)MGAL28$25.00$25.00$1.00$1.00
34Topsoil (625.0100)SY945$8.50$8.50$4.00$4.00
35Mulching (627.0200)SY1,155$0.50$0.50$0.60$0.60
36Silt fence (628.1504)LF1,425$3.75$3.75$2.00$2.00
37Silt fence maintenance (628.1520)LF2,850$0.10$0.10$0.01$0.01
38Mobilizations erosion control (628.1905)EACH4$300.00$300.00$1,000.00$1,000.00
39Mobilizations emergency erosion control (628.1910)EACH4$300.00$300.00$10.00$10.00
40Erosion mat class II type C (628.2027)SY355$3.50$3.50$4.50$4.50
41Temporary ditch checks (628.7504)LF50$15.00$15.00$8.00$8.00
42Fertilizer type B (629.0210)CWT1$100.00$100.00$250.00$250.00
43Seeding mixture no. 20 (630.0120)LB68$7.15$7.15$20.00$20.00
44Seeding temporary (630.0200)LB40$4.10$4.10$3.00$3.00
45Seed water (630.0500)MGAL34$25.00$25.00$1.00$1.00
46Posts wood 4X6-inch X 14-FT (634.0614)EACH7$130.00$130.00$85.00$85.00
47Signs type II reflective H (637.2210)SF6$35.00$35.00$17.00$17.00
48Signs type II reflective F (637.2230)SF23.12$30.00$30.00$22.00$22.00
49Removing signs type II (638.2602)EACH8$15.00$15.00$16.00$16.00
50Removing small sign supports (638.3000)EACH7$15.00$15.00$15.00$15.00
51Field office type B (642.5001)EACH1$3,300.00$5,000.00$4,500.00$9,500.00
52Traffic control barricades type III (643.0420)DAY2,888$0.40$0.40$0.40$0.77
53Traffic control warning lights type A (643.0705)DAY4,725$0.10$0.10$0.10$0.16
54Traffic control signs (643.0900)DAY14,438$0.40$0.40$0.40$0.61
55Traffic control covering signs type II (643.0920)EACH5$35.00$35.00$35.00$74.06
56Traffic control (643.5000)EACH1$2,336.00$2,336.00$2,336.00$4,595.00
57Geotextile type DF schedule A (645.0111)SY70$8.00$8.00$5.00$5.00
58Marking line epoxy 4-inch (646.1020)LF2,050$2.90$2.65$2.90$2.90
59Construction staking subgrade (650.4500)LF491$0.01$0.01$0.01$0.01
60Construction staking base (650.5000)LF491$0.50$0.01$0.50$0.01
61Construction staking structure layout (structure) 01. B-57-0018 (650.6501)EACH1$2,000.00$1,929.00$2,000.00$1,929.00
62Construction staking supplemental control (project) 01. 8394-00-73 (650.9911)EACH1$750.00$500.00$750.00$500.00
63Construction staking slope stakes (650.9920)LF491$1.00$0.98$1.00$0.98
64Sawing asphalt (690.0150)LF274$1.79$2.25$2.25$2.25
65Incentive strength concrete structures (715.0502)DOL2,123$1.00$1.00$1.00$1.00
66Installing and maintaining bird deterrent system (station) 01. 98+13.76 (999.2000.S)EACH1$1.00$0.01$0.01$16,000
67On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
68On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00
69Special 01. foam void filling B-57- 0018 (SPV.0060)EACH1$24,665$15,000$10,000$35,000
WisDOT contract 20260210041: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy