WisDOT contract 20260915001 bid tabulation

5738-00-74. Let by Wisconsin DOT on September 15, 2026, Sauk. 6 bids received; low bid $989,561 by Radtke Contractors Inc..

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
73
Data through
10 NOV 2026

4 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Radtke Contractors Inc.$989,561Low
2Concrete Structures, Inc.$1,002,217+1.0%
3Larson Construction Co., Inc.$1,027,356+4.0%
6Sheet Piling Services LLC$1,249,178+26%
WisDOT contract 20260915001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Radtke Contractors Inc.2. Concrete Structures, Inc.3. Larson Construction Co., Inc.4. Sheet Piling Services LLC
1Clearing (201.0105)STA5$100.00$100.00$100.00$100.00
2Grubbing (201.0205)STA5$100.00$100.00$100.00$100.00
3Removing structure over waterway minimal debris (structure) 01. P-56- 0933 (203.0260)EACH1$43,477$20,000$29,420$50,000
4Removing structure over waterway minimal debris (structure) 02. P-56- 0948 (203.0260)EACH1$40,507$24,000$19,542$185,000
5Excavation common (205.0100)CY470$18.00$18.00$18.00$18.00
6Excavation for structures bridges (structure) 01. B-56-0256 (206.1001)EACH1$27,290$20,500$26,441$30,000
7Excavation for structures bridges (structure) 02. B-56-0257 (206.1001)EACH1$29,210$12,000$19,400$100,000
8Borrow (208.0100)CY118$26.50$26.50$26.50$26.50
9Backfill structure type A (210.1500)TON736$34.82$32.10$32.10$30.00
10Finishing roadway (project) 01. 5738-00-74 (213.0100)EACH1$500.00$500.00$500.00$500.00
11Finishing roadway (project) 02. 5738-00-75 (213.0100)EACH1$500.00$500.00$500.00$500.00
12Base aggregate dense 3/4-inch (305.0110)TON80$32.00$32.00$32.00$32.00
13Base aggregate dense 1 1/4-inch (305.0120)TON680$26.00$26.00$26.00$26.00
14Select crushed material (312.0110)TON290$25.00$25.00$25.00$25.00
15Tack coat (455.0605)GAL40$2.75$2.75$2.75$2.75
16Asphaltic surface (465.0105)TON130$159.25$159.25$159.25$159.25
17Concrete masonry bridges (502.0100)CY303$732.24$1,190.00$787.00$875.00
18Protective surface treatment (502.3200)SY397$4.26$7.00$4.65$5.00
19Bar steel reinforcement HS structures (505.0400)LB8,240$1.42$1.40$1.65$1.45
20Bar steel reinforcement HS coated structures (505.0600)LB44,840$1.41$1.60$1.65$1.55
21Railing tubular type M (513.4061)LF196$344.13$345.00$365.00$325.00
22Rubberized membrane waterproofing (516.0500)SY20$67.21$44.00$70.00$30.00
23Temporary structure (station) 01. sta 11+48 (526.0101)EACH1$39,963$44,000$49,940$65,000
24Pre-boring rock or consolidated materials (550.0020)LF175$150.79$210.00$438.86$205.00
25Piling steel HP 10-inch X 42 LB (550.1100)LF476$39.90$60.00$88.00$75.00
26Riprap heavy (606.0300)CY180$85.00$85.00$85.50$75.00
27Pipe underdrain wrapped 6-inch (612.0406)LF280$11.00$11.00$11.00$10.00
28Maintenance and repair of haul roads (project) 01. 5738-00-74 (618.0100)EACH1$250.00$500.00$500.00$0.01
29Maintenance and repair of haul roads (project) 02. 5738-00-75 (618.0100)EACH1$250.00$500.00$500.00$0.01
30Mobilization (619.1000)EACH1$189,907$99,124$154,427$139,567
31Water (624.0100)MGAL14$0.01$0.01$0.01$0.01
32Salvaged topsoil (625.0500)SY720$3.50$3.50$3.50$3.50
33Mulching (627.0200)SY1,350$0.75$0.35$3.00$0.35
34Silt fence (628.1504)LF700$2.50$2.25$5.00$2.25
35Silt fence maintenance (628.1520)LF1,400$0.01$0.01$0.01$0.01
36Mobilizations erosion control (628.1905)EACH7$300.00$150.00$1.00$150.00
37Mobilizations emergency erosion control (628.1910)EACH7$300.00$200.00$1.00$200.00
38Erosion mat urban class I type B (628.2008)SY740$2.05$2.10$3.00$2.10
39Turbidity barriers (628.6005)SY530$40.00$48.00$45.00$48.00
40Temporary ditch checks (628.7504)LF160$6.95$8.50$12.50$8.50
41Fertilizer type B (629.0210)CWT2.50$90.00$90.00$150.00$90.00
42Seeding mixture no. 20 (630.0120)LB85$20.00$8.25$10.00$8.25
43Seeding temporary (630.0200)LB65$8.00$2.50$10.00$2.50
44Seeding borrow pit (630.0300)LB20$15.00$8.25$10.00$8.25
45Seed water (630.0500)MGAL40$40.00$1.00$1.00$1.00
46Delineators temporary (633.1100)EACH22$45.00$30.00$75.00$30.00
47Posts wood 4X6-inch X 14-FT (634.0614)EACH8$205.00$100.00$150.00$100.00
48Signs type II reflective F (637.2230)SF24$50.00$30.00$55.00$30.00
49Removing signs type II (638.2602)EACH10$35.00$30.00$75.00$30.00
50Removing small sign supports (638.3000)EACH10$35.00$30.00$75.00$30.00
51Field office type B (642.5001)EACH1$3,138.72$1,500.00$6,000.00$1,500.00
52Traffic control drums (643.0300)DAY2,290$0.15$0.15$0.35$0.15
53Traffic control barricades type III (643.0420)DAY1,325$0.50$0.50$1.00$0.50
54Traffic control warning lights type A (643.0705)DAY2,290$0.13$0.13$0.20$0.13
55Traffic control warning lights type C (643.0715)DAY780$0.13$0.13$0.25$0.13
56Traffic control signs (643.0900)DAY2,420$0.20$0.20$1.00$0.20
57Traffic control (643.5000)EACH1$12,500$12,500$5,000.00$12,500
58Geotextile type DF schedule A (645.0111)SY194$9.00$9.00$9.00$5.00
59Geotextile type HR (645.0120)SY394$9.00$9.00$8.00$5.00
60Geotextile type sas (645.0140)SY740$5.00$5.00$5.00$5.00
61Geogrid type SR (645.0220)SY610$5.00$5.00$5.00$5.00
62Construction staking subgrade (650.4500)LF493$0.01$0.01$0.01$0.01
63Construction staking base (650.5000)LF493$0.01$3.00$0.01$3.00
64Construction staking structure layout (structure) 01. B-56-0256 (650.6501)EACH1$2,500.00$2,000.00$2,500.00$2,000.00
65Construction staking structure layout (structure) 02. B-56-0257 (650.6501)EACH1$2,500.00$2,000.00$2,500.00$2,000.00
66Construction staking supplemental control (project) 01. 5738-00-74 (650.9911)EACH1$1,000.00$500.00$1,000.00$500.00
67Construction staking supplemental control (project) 02. 5738-00-75 (650.9911)EACH1$1,000.00$500.00$1,000.00$500.00
68Construction staking slope stakes (650.9920)LF493$0.01$3.00$0.01$3.00
69Sawing asphalt (690.0150)LF50$2.95$5.00$5.00$5.00
70Incentive strength concrete structures (715.0502)DOL1,818$1.00$1.00$1.00$1.00
71Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF350$4.00$5.25$8.00$5.25
72On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00
73On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,200$5.00$5.00$5.00$5.00
WisDOT contract 20260915001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy