WisDOT contract 20251209015 bid tabulation
C Oconomowoc, N Lapham St; Oconomowoc River Bridge P67-770 (LOC STR, Waukesha County C Oconomowoc, N Lapham St). Let by Wisconsin DOT on December 9, 2025, Waukesha. 6 bids received.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 131
- Data through
- 10 NOV 2026
5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 2 | R.G. Huston Company, Inc. | $1,140,372 | +6.0% |
| 3 | Concrete Structures, Inc. | $1,152,547 | +7.0% |
| 4 | Lunda Construction Company | $1,242,173 | +15% |
| 5 | Radtke Contractors Inc. | $1,295,398 | +20% |
| 6 | Sheet Piling Services LLC | $1,567,138 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R.G. Huston Company, Inc. | 2. Concrete Structures, Inc. | 3. Lunda Construction Company | 4. Radtke Contractors Inc. | 5. Sheet Piling Services LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 6 | $630.00 | $895.00 | $895.00 | $895.00 | $895.00 |
| 2 | Clearing (201.0120) | ID | 24 | $125.00 | $54.00 | $54.00 | $54.00 | $54.00 |
| 3 | Grubbing (201.0205) | STA | 6 | $370.00 | $335.00 | $335.00 | $335.00 | $335.00 |
| 4 | Grubbing (201.0220) | ID | 24 | $20.70 | $9.50 | $9.50 | $9.50 | $9.50 |
| 5 | Abatement of asbestos containing material (structure) 01. P-67-0770 (203.0211.S) | EACH | 1 | $2,250.00 | $3,000.00 | $3,500.00 | $2,910.00 | $2,910.00 |
| 6 | Removing structure over waterway minimal debris (structure) 01. P-67- 0770 (203.0260) | EACH | 1 | $50,400 | $50,000 | $60,000 | $88,635 | $165,000 |
| 7 | Removing curb & gutter (204.0150) | LF | 20 | $30.25 | $15.00 | $20.00 | $15.00 | $15.00 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 76 | $14.00 | $15.00 | $11.00 | $15.00 | $15.00 |
| 9 | Removing guardrail (204.0165) | LF | 147 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 10 | Removing fence (204.0170) | LF | 81 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 11 | Removing inlets (204.0220) | EACH | 1 | $566.80 | $550.00 | $800.00 | $550.00 | $550.00 |
| 12 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 50 | $18.15 | $20.00 | $68.00 | $20.00 | $20.00 |
| 13 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 36 | $23.90 | $25.00 | $60.00 | $25.00 | $25.00 |
| 14 | Excavation common (205.0100) | CY | 949 | $11.75 | $22.00 | $31.60 | $22.00 | $22.00 |
| 15 | Excavation for structures bridges (structure) 01. B-67-0405 (206.1001) | EACH | 1 | $11,265 | $20,000 | $32,200 | $72,354 | $100,000 |
| 16 | Cofferdams (structure) 01. B-67- 0405 (206.5001) | EACH | 1 | $46,150 | $75,000 | $50,000 | $110,161 | $215,000 |
| 17 | Borrow (208.0100) | CY | 43 | $36.50 | $1.00 | $29.00 | $1.00 | $1.00 |
| 18 | Backfill structure type A (210.1500) | TON | 509 | $29.70 | $25.00 | $31.00 | $31.17 | $25.00 |
| 19 | Finishing roadway (project) 01. 3852-06-70 (213.0100) | EACH | 1 | $315.00 | $500.00 | $1.00 | $500.00 | $500.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 338 | $35.70 | $30.00 | $28.75 | $30.00 | $30.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,241 | $23.25 | $25.00 | $25.60 | $25.00 | $25.00 |
| 22 | Base aggregate open-graded (310.0110) | TON | 4 | $56.90 | $100.00 | $150.00 | $60.00 | $100.00 |
| 23 | Breaker run (311.0110) | TON | 62 | $29.25 | $30.00 | $40.00 | $46.00 | $30.00 |
| 24 | Tack coat (455.0605) | GAL | 136 | $2.35 | $4.00 | $5.00 | $5.00 | $5.00 |
| 25 | Incentive density HMA pavement (460.2000) | DOL | 310 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 278 | $99.95 | $88.00 | $100.00 | $100.00 | $100.00 |
| 27 | HMA pavement 5 LT 58-28 S (460.5225) | TON | 168 | $114.95 | $110.00 | $100.00 | $100.00 | $100.00 |
| 28 | Asphaltic surface driveways and field entrances (465.0120) | TON | 17 | $375.00 | $175.00 | $100.00 | $100.00 | $100.00 |
| 29 | Concrete masonry bridges (502.0100) | CY | 307 | $1,075.00 | $1,050.00 | $1,200.00 | $770.18 | $1,250.00 |
| 30 | Protective surface treatment (502.3200) | SY | 170 | $7.30 | $7.00 | $5.00 | $3.69 | $5.00 |
| 31 | Pigmented surface sealer (502.3210) | SY | 88 | $16.10 | $15.00 | $8.00 | $13.21 | $5.00 |
| 32 | Bar steel reinforcement HS structures (505.0400) | LB | 5,650 | $1.51 | $1.30 | $1.20 | $1.40 | $1.45 |
| 33 | Bar steel reinforcement HS coated structures (505.0600) | LB | 43,190 | $1.43 | $1.50 | $1.30 | $1.39 | $1.50 |
| 34 | Railing steel type C1 (513.7006) | LF | 178 | $288.85 | $260.00 | $240.00 | $257.14 | $240.00 |
| 35 | Rubberized membrane waterproofing (516.0500) | SY | 20 | $51.00 | $37.00 | $35.00 | $64.33 | $30.00 |
| 36 | Architectural surface treatment (structure) 01. B-67-0405 (517.1050.S) | SF | 354 | $27.20 | $25.20 | $12.50 | $31.34 | $15.00 |
| 37 | Apron endwalls for culvert pipe 15- inch (520.1015) | EACH | 1 | $335.30 | $450.00 | $342.00 | $450.00 | $450.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 1 | $1,345.00 | $1,950.00 | $1,420.00 | $1,950.00 | $1,950.00 |
| 39 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,620.00 | $2,000.00 | $1,495.00 | $2,000.00 | $2,000.00 |
| 40 | Pre-boring unconsolidated materials (550.0010) | LF | 40 | $391.50 | $445.00 | $120.00 | $881.31 | $250.00 |
| 41 | Pile points (550.0500) | EACH | 18 | $136.00 | $150.00 | $125.00 | $105.50 | $110.00 |
| 42 | Piling steel HP 12-inch X 74 LB (550.1125) | LF | 495 | $99.10 | $85.00 | $65.00 | $53.29 | $90.00 |
| 43 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,281 | $23.54 | $23.54 | $25.60 | $23.54 | $23.54 |
| 44 | Concrete curb pedestrian (601.0600) | LF | 42 | $33.92 | $33.92 | $55.00 | $33.92 | $33.92 |
| 45 | Concrete sidewalk 5-inch (602.0410) | SF | 4,690 | $8.44 | $7.38 | $8.75 | $7.38 | $7.38 |
| 46 | Curb ramp detectable warning field yellow (602.0505) | SF | 40 | $34.56 | $34.56 | $45.00 | $34.56 | $34.56 |
| 47 | Concrete driveway 6-inch (602.0810) | SY | 71 | $84.77 | $84.77 | $85.50 | $84.77 | $84.77 |
| 48 | Riprap medium (606.0200) | CY | 9 | $157.60 | $85.00 | $129.00 | $85.00 | $85.00 |
| 49 | Riprap heavy (606.0300) | CY | 195 | $109.65 | $85.00 | $95.00 | $90.71 | $95.00 |
| 50 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 40 | $138.00 | $100.00 | $190.00 | $100.00 | $100.00 |
| 51 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 43 | $115.15 | $95.00 | $170.00 | $95.00 | $95.00 |
| 52 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 42 | $126.15 | $90.00 | $131.00 | $90.00 | $90.00 |
| 53 | Storm sewer pipe class III-A 15- inch (608.3015) | LF | 22 | $206.85 | $95.00 | $147.00 | $95.00 | $95.00 |
| 54 | Inlet covers type H (611.0624) | EACH | 4 | $1,255.00 | $1,050.00 | $1,065.00 | $1,050.00 | $1,050.00 |
| 55 | Inlet covers type MS (611.0642) | EACH | 1 | $945.00 | $950.00 | $833.00 | $950.00 | $950.00 |
| 56 | Catch basins 4-FT diameter (611.1004) | EACH | 1 | $2,394.00 | $3,300.00 | $3,876.00 | $3,300.00 | $3,300.00 |
| 57 | Catch basins 2X3-FT (611.1230) | EACH | 1 | $2,330.00 | $2,700.00 | $3,320.00 | $2,700.00 | $2,700.00 |
| 58 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $2,395.00 | $2,700.00 | $4,012.00 | $2,700.00 | $2,700.00 |
| 59 | Inlets median 1 grate (611.3901) | EACH | 1 | $4,090.00 | $3,300.00 | $3,888.00 | $3,300.00 | $3,300.00 |
| 60 | Adjusting manhole covers (611.8110) | EACH | 1 | $590.00 | $650.00 | $1,633.00 | $650.00 | $650.00 |
| 61 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 163 | $4.50 | $8.00 | $8.00 | $4.26 | $9.00 |
| 62 | Insulation board polystyrene (inch) 01. 4-inch (612.0902.S) | SY | 7 | $70.85 | $30.00 | $56.00 | $30.00 | $30.00 |
| 63 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 1 | $600.00 | $500.00 | $250.00 | $365.80 | $750.00 |
| 64 | Steel thrie beam structure approach (614.0200) | LF | 20.60 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 65 | Steel plate beam guard class A (614.0305) | LF | 12.50 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 66 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 1 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 67 | Fence safety (616.0700.S) | LF | 225 | $4.50 | $4.50 | $4.50 | $4.50 | $4.50 |
| 68 | Maintenance and repair of haul roads (project) 01. 3852-06-70 (618.0100) | EACH | 1 | $82.00 | $1.00 | $1.00 | $500.00 | $0.01 |
| 69 | Mobilization (619.1000) | EACH | 1 | $65,000 | $67,880 | $103,357 | $161,726 | $106,825 |
| 70 | Water (624.0100) | MGAL | 27 | $75.00 | $0.01 | $65.00 | $0.01 | $0.01 |
| 71 | Salvaged topsoil (625.0500) | SY | 1,660 | $2.20 | $6.50 | $8.70 | $6.50 | $6.50 |
| 72 | Mulching (627.0200) | SY | 420 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 73 | Silt fence (628.1504) | LF | 740 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 74 | Silt fence maintenance (628.1520) | LF | 930 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 75 | Mobilizations erosion control (628.1905) | EACH | 8 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 76 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 77 | Erosion mat urban class I type B (628.2008) | SY | 620 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 78 | Erosion mat class II type C (628.2027) | SY | 300 | $4.50 | $4.50 | $4.50 | $4.50 | $4.50 |
| 79 | Soil stabilizer type B (628.6510) | ACRE | 0.35 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 80 | Inlet protection type A (628.7005) | EACH | 8 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 81 | Inlet protection type B (628.7010) | EACH | 4 | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 82 | Inlet protection type D (628.7020) | EACH | 7 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 83 | Temporary ditch checks (628.7504) | LF | 40 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 84 | Tracking pads (628.7560) | EACH | 1 | $1,400.00 | $100.00 | $1,600.00 | $100.00 | $100.00 |
| 85 | Fertilizer type B (629.0210) | CWT | 1.50 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 86 | Seeding mixture no. 20 (630.0120) | LB | 14 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 87 | Seeding mixture no. 40 (630.0140) | LB | 30 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 88 | Seeding temporary (630.0200) | LB | 46 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 89 | Seed water (630.0500) | MGAL | 18 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 90 | Sod water (631.0300) | MGAL | 24 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 91 | Sod lawn (631.1000) | SY | 900 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 |
| 92 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 8 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 93 | Signs type II reflective H (637.2210) | SF | 19.36 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 94 | Signs type II reflective F (637.2230) | SF | 20 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 95 | Moving signs type II (638.2102) | EACH | 2 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 96 | Removing signs type II (638.2602) | EACH | 20 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 97 | Removing small sign supports (638.3000) | EACH | 13 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 98 | Field office type B (642.5001) | EACH | 1 | $1,090.00 | $1,500.00 | $4,000.00 | $2,224.20 | $2,000.00 |
| 99 | Traffic control drums (643.0300) | DAY | 4,770 | $0.35 | $0.35 | $0.35 | $0.35 | $0.25 |
| 100 | Traffic control barricades type III (643.0420) | DAY | 3,190 | $0.64 | $0.64 | $0.64 | $0.64 | $0.55 |
| 101 | Traffic control warning lights type A (643.0705) | DAY | 6,380 | $0.18 | $0.18 | $0.18 | $0.18 | $0.10 |
| 102 | Traffic control signs (643.0900) | DAY | 4,890 | $0.60 | $0.60 | $0.60 | $0.60 | $0.25 |
| 103 | Traffic control covering signs type II (643.0920) | EACH | 8 | $20.10 | $20.10 | $20.10 | $20.10 | $25.00 |
| 104 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 24 | $9.00 | $9.00 | $9.00 | $9.00 | $5.00 |
| 105 | Traffic control (643.5000) | EACH | 1 | $2,510.00 | $2,510.00 | $2,510.00 | $2,510.00 | $3,500.00 |
| 106 | Temporary pedestrian barricade (644.1810) | LF | 150 | $5.00 | $5.00 | $5.00 | $5.00 | $7.00 |
| 107 | Geotextile type DF schedule A (645.0111) | SY | 58 | $2.40 | $8.00 | $4.25 | $4.71 | $8.00 |
| 108 | Geotextile type HR (645.0120) | SY | 321 | $4.65 | $6.00 | $5.00 | $5.11 | $5.00 |
| 109 | Geotextile type sas (645.0140) | SY | 16 | $2.45 | $10.00 | $15.00 | $10.00 | $10.00 |
| 110 | Construction staking storm sewer (650.4000) | EACH | 9 | $125.00 | $200.00 | $200.00 | $125.00 | $200.00 |
| 111 | Construction staking subgrade (650.4500) | LF | 647 | $1.50 | $1.00 | $1.00 | $1.50 | $1.00 |
| 112 | Construction staking base (650.5000) | LF | 647 | $1.80 | $2.00 | $2.00 | $1.80 | $2.00 |
| 113 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,281 | $2.00 | $1.75 | $1.75 | $2.00 | $1.75 |
| 114 | Construction staking structure layout (structure) 01. B-67-0405 (650.6501) | EACH | 1 | $1,875.00 | $3,600.00 | $3,600.00 | $1,875.00 | $3,600.00 |
| 115 | Construction staking curb ramps (650.9000) | EACH | 4 | $275.00 | $300.00 | $300.00 | $275.00 | $300.00 |
| 116 | Construction staking sidewalk (project) 01. 3852-06-70 (650.9500) | EACH | 1 | $1,350.00 | $1,250.00 | $1,250.00 | $1,350.00 | $1,250.00 |
| 117 | Construction staking supplemental control (project) 01. 3852-06-70 (650.9911) | EACH | 1 | $1,675.00 | $1,500.00 | $1,500.00 | $1,675.00 | $1,500.00 |
| 118 | Construction staking slope stakes (650.9920) | LF | 681 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 119 | Sawing asphalt (690.0150) | LF | 235 | $1.95 | $2.00 | $2.25 | $1.95 | $2.25 |
| 120 | Sawing concrete (690.0250) | LF | 69 | $2.95 | $5.00 | $2.75 | $2.95 | $2.75 |
| 121 | Incentive strength concrete structures (715.0502) | DOL | 1,842 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 122 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 123 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,500 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 124 | Special 01. adjusting sanitary manhole covers (SPV.0060) | EACH | 1 | $355.00 | $950.00 | $1,655.00 | $950.00 | $950.00 |
| 125 | Special 02. adjusting water valve vault covers (SPV.0060) | EACH | 1 | $355.00 | $800.00 | $700.00 | $800.00 | $800.00 |
| 126 | Special 03. adjusting water valve boxes (SPV.0060) | EACH | 6 | $110.00 | $700.00 | $800.00 | $700.00 | $700.00 |
| 127 | Special 04. relocating mailbox assemblies (SPV.0060) | EACH | 2 | $575.00 | $800.00 | $100.00 | $800.00 | $800.00 |
| 128 | Special 05. fisheries consultant (SPV.0060) | EACH | 1 | $9,950.00 | $10,000 | $7,500.00 | $12,000 | $2,500.00 |
| 129 | Special 02. pedestrian railing (SPV.0090) | LF | 46 | $413.00 | $264.00 | $315.00 | $369.39 | $250.00 |
| 130 | Special 03. silt fence double staked (SPV.0090) | LF | 190 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 131 | Special 01. modular block retaining wall (SPV.0165) | SF | 105 | $126.50 | $126.50 | $126.50 | $126.50 | $126.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.