WisDOT contract 20260310011 bid tabulation

5889-00-73. Let by Wisconsin DOT on March 10, 2026, Dane. 3 bids received; low bid $1,534,353 by Concrete Structures, Inc..

Owner
Wisconsin DOT
Letting
10 MAR 2026
Pay items
93
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Concrete Structures, Inc.$1,534,353Low
2R.G. Huston Company, Inc.$1,891,863+23%
3Sheet Piling Services LLC$1,904,662+24%
WisDOT contract 20260310011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Concrete Structures, Inc.2. R.G. Huston Company, Inc.3. Sheet Piling Services LLC
1Removing small pipe culverts (203.0100)EACH1$450.00$1,550.00$450.00
2Removing structure over waterway remove debris (structure) 01. B-13- 0040 (203.0250)EACH1$45,000$121,500$175,000
3Removing structure over waterway minimal debris (structure) 01. B-13- 0028 (203.0260)EACH1$76,750$124,135$150,000
4Removing asphaltic surface milling (204.0120)SY1,120$6.90$6.97$6.90
5Removing guardrail (204.0165)LF345$5.00$5.00$5.00
6Removing delineators and markers (204.0180)EACH4$25.00$25.00$25.00
7Excavation common (205.0100)CY1,099$12.80$19.40$12.80
8Excavation for structures bridges (structure) 01. B-13-0902 (206.1001)EACH1$25,000$22,300$90,000
9Excavation for structures bridges (structure) 02. B-13-0904 (206.1001)EACH1$7,500.00$17,650$90,000
10Borrow (208.0100)CY634$13.00$31.50$13.00
11Backfill structure type A (210.1500)TON1,315$24.00$38.45$24.00
12Finishing roadway (project) 01. 5889-00-73 (213.0100)EACH1$500.00$160.00$500.00
13Finishing roadway (project) 02. 5889-00-75 (213.0100)EACH1$500.00$160.00$500.00
14Base aggregate dense 3/4-inch (305.0110)TON249$27.00$51.00$27.00
15Base aggregate dense 1 1/4-inch (305.0120)TON1,930$21.15$25.50$21.15
16Concrete pavement 6-inch (415.0060)SY40$60.00$60.61$60.00
17Concrete pavement approach slab (415.0410)SY202$230.00$232.32$230.00
18Tack coat (455.0605)GAL205$0.10$0.10$0.10
19Incentive density HMA pavement (460.2000)DOL540$1.00$1.00$1.00
20HMA pavement 3 LT 58-28 S (460.5223)TON450$72.75$73.48$72.75
21HMA pavement 4 LT 58-28 S (460.5224)TON368$73.75$74.49$73.75
22Concrete masonry bridges (502.0100)CY536.50$900.00$1,078.00$950.00
23Protective surface treatment (502.3200)SY635$7.00$7.20$3.50
24Bar steel reinforcement HS structures (505.0400)LB14,650$1.30$1.45$1.50
25Bar steel reinforcement HS coated structures (505.0600)LB69,790$1.50$1.35$1.60
26Railing tubular type M (513.4061)LF266$325.00$373.00$290.00
27Rubberized membrane waterproofing (516.0500)SY30$44.00$42.76$18.00
28Apron endwalls for culvert pipe 18- inch (520.1018)EACH2$475.00$590.00$475.00
29Culvert pipe class III-A 18-inch (520.3318)LF35$55.00$92.00$55.00
30Pre-boring rock or consolidated materials (550.0020)LF184$177.00$350.00$275.00
31Piling steel HP 10-inch X 42 LB (550.1100)LF1,048$60.00$68.01$53.00
32Riprap heavy (606.0300)CY375$75.00$96.65$75.00
33Pipe underdrain wrapped 6-inch (612.0406)LF350$9.00$3.85$9.00
34Steel thrie beam structure approach (614.0200)LF20.70$85.00$85.00$85.00
35Steel plate beam guard short radius (614.0345)LF50$30.00$30.00$30.00
36Steel plate beam guard short radius terminal (614.0390)EACH1$2,500.00$2,500.00$2,500.00
37MGS guardrail 3 (614.2300)LF250$30.00$30.00$30.00
38MGS guardrail short radius (614.2350)LF40$30.00$30.00$30.00
39MGS thrie beam transition (614.2500)LF189.40$88.00$88.00$88.00
40MGS guardrail terminal eat (614.2610)EACH4$3,900.00$3,900.00$3,900.00
41MGS guardrail terminal type 2 (614.2620)EACH1$2,700.00$2,700.00$2,700.00
42Maintenance and repair of haul roads (project) 01. 5889-00-73 (618.0100)EACH1$100.00$350.00$0.01
43Maintenance and repair of haul roads (project) 02. 5889-00-75 (618.0100)EACH1$100.00$350.00$0.01
44Mobilization (619.1000)EACH1$175,900$188,350$153,683
45Dust control surface treatment (623.0200)SY3,540$0.01$0.01$0.01
46Water (624.0100)MGAL29$0.01$2.65$0.01
47Salvaged topsoil (625.0500)SY2,062$3.25$6.05$3.25
48Silt fence (628.1504)LF1,400$2.25$2.25$2.25
49Silt fence maintenance (628.1520)LF1,400$0.01$0.01$0.01
50Mobilizations erosion control (628.1905)EACH8$100.00$100.00$100.00
51Mobilizations emergency erosion control (628.1910)EACH8$100.00$100.00$100.00
52Erosion mat urban class I type B (628.2008)SY1,639$1.95$1.95$1.95
53Erosion mat class II type C (628.2027)SY436$3.95$3.95$3.95
54Turbidity barriers (628.6005)SY510$45.00$0.01$45.00
55Temporary ditch checks (628.7504)LF30$10.00$10.00$10.00
56Culvert pipe checks (628.7555)EACH3$25.00$25.00$25.00
57Fertilizer type B (629.0210)CWT1.50$150.00$150.00$150.00
58Seeding mixture no. 40 (630.0140)LB100$15.00$15.00$15.00
59Seeding temporary (630.0200)LB62$10.00$10.00$10.00
60Seed water (630.0500)MGAL63.10$20.00$20.00$20.00
61Posts wood 4X6-inch X 14-FT (634.0614)EACH8$90.00$90.00$90.00
62Signs type II reflective F (637.2230)SF24$30.00$30.00$30.00
63Moving signs type II (638.2102)EACH6$175.00$175.00$175.00
64Removing signs type II (638.2602)EACH8$35.00$35.00$35.00
65Removing small sign supports (638.3000)EACH8$35.00$35.00$35.00
66Field office type B (642.5001)EACH1$1,500.00$1,100.00$2,500.00
67Traffic control barricades type III (643.0420)DAY2,331$0.30$1.00$1.00
68Traffic control warning lights type A (643.0705)DAY3,150$0.10$0.10$0.10
69Traffic control signs (643.0900)DAY8,883$0.15$0.35$0.35
70Traffic control covering signs type II (643.0920)EACH126$1.75$1.00$1.00
71Traffic control (643.5000)EACH1$9,700.00$6,000.00$6,000.00
72Geotextile type DF schedule A (645.0111)SY260$8.00$4.45$8.00
73Geotextile type HR (645.0120)SY630$6.00$7.50$6.00
74Marking line paint 6-inch (646.2005)LF3,700$1.45$1.95$1.45
75Construction staking subgrade (650.4500)LF723$0.01$0.01$0.01
76Construction staking base (650.5000)LF723$0.01$0.01$1.50
77Construction staking pipe culverts (650.6000)EACH1$350.00$350.00$200.00
78Construction staking structure layout (structure) 01. B-13-0902 (650.6501)EACH1$3,000.00$3,000.00$2,700.00
79Construction staking structure layout (structure) 02. B-13-0904 (650.6501)EACH1$1,500.00$1,500.00$2,200.00
80Construction staking concrete pavement (650.7000)LF64$0.01$0.01$10.00
81Construction staking supplemental control (project) 01. 5889-00-73 (650.9911)EACH1$1,550.00$1,550.00$800.00
82Construction staking supplemental control (project) 02. 5889-00-75 (650.9911)EACH1$1,550.00$1,550.00$800.00
83Construction staking slope stakes (650.9920)LF859$0.01$0.01$1.50
84Sawing asphalt (690.0150)LF348$1.96$1.95$1.96
85Incentive strength concrete structures (715.0502)DOL3,219$1.00$1.00$1.00
86Incentive compressive strength concrete pavement (715.0720)DOL1,000$1.00$1.00$1.00
87Maintaining bird deterrent system (station) 01. sta 10+00 (999.2005.S)EACH1$1.00$125.00$0.01
88Maintaining bird deterrent system (station) 02. sta 19+14 (999.2005.S)EACH1$1.00$125.00$0.01
89On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00
90On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00
91Special 01. removing existing timber piling (SPV.0090)LF120$10.00$130.00$50.00
92Special 01. select crushed material for travel corridor (SPV.0195)TON30$50.00$183.00$40.00
93Special 02. removal and management of contaminated soil and groundwater (SPV.0195)TON100$85.00$170.00$85.00
WisDOT contract 20260310011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy