WisDOT contract 20251209009 bid tabulation

Town of Sumpter, Stones Pocket Road; Otter Creek Bridge B-56-0249 (LOC STR, Sauk County Town of Sumpter, Stones Pocket Road). Let by Wisconsin DOT on December 9, 2025, Sauk. 6 bids received; low bid $376,251 by Concrete Structures, Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
53
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Concrete Structures, Inc.$376,251Low
2Radtke Contractors Inc.$389,700+4.0%
4Larson Construction Co., Inc.$439,603+17%
5R.G. Huston Company, Inc.$446,687+19%
6Lunda Construction Company$472,810+26%
WisDOT contract 20251209009: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Concrete Structures, Inc.2. Radtke Contractors Inc.3. Larson Construction Co., Inc.4. R.G. Huston Company, Inc.5. Lunda Construction Company
1Removing structure over waterway remove debris (structure) 01. P-56- 0170 (203.0250)EACH1$20,000$31,506$21,300$32,265$106,000
2Excavation common (205.0100)CY222$17.50$17.50$17.50$17.70$17.50
3Excavation for structures bridges (structure) 01. B-56-0249 (206.1001)EACH1$12,000$20,486$18,900$5,770.00$26,000
4Backfill structure type A (210.1500)TON300$24.00$42.47$26.00$46.55$26.00
5Finishing roadway (project) 01. 5853-00-73 (213.0100)EACH1$500.00$500.00$500.00$325.00$500.00
6Base aggregate dense 3/4-inch (305.0110)TON14$22.00$22.00$22.00$221.70$22.00
7Base aggregate dense 1 1/4-inch (305.0120)TON242$17.50$17.50$17.50$31.30$17.50
8Tack coat (455.0605)GAL14$4.00$4.00$4.04$4.00$4.00
9Asphaltic surface (465.0105)TON54$182.00$182.00$183.82$182.00$182.00
10Concrete masonry bridges (502.0100)CY132$1,100.00$709.61$799.00$1,230.00$900.00
11Protective surface treatment (502.3200)SY181$7.00$4.26$4.00$7.50$5.00
12Bar steel reinforcement HS structures (505.0400)LB4,090$1.30$1.32$1.48$1.50$1.15
13Bar steel reinforcement HS coated structures (505.0600)LB17,690$1.50$1.41$1.72$1.53$1.35
14Railing tubular type M (513.4061)LF90$284.00$282.79$400.00$318.00$350.00
15Rubberized membrane waterproofing (516.0500)SY12$37.00$64.32$72.00$52.00$25.00
16Piling cip concrete 10 3/4 X 0.25- inch (550.2104)LF960$50.00$41.98$63.70$53.45$38.00
17Riprap heavy (606.0300)CY120$75.00$97.43$75.00$102.75$75.00
18Pipe underdrain wrapped 6-inch (612.0406)LF160$8.00$4.26$8.00$3.35$8.00
19Maintenance and repair of haul roads (project) 01. 5853-00-73 (618.0100)EACH1$100.00$250.00$2,500.00$85.00$1.00
20Mobilization (619.1000)EACH1$27,150$72,351$83,650$46,100$57,462
21Water (624.0100)MGAL2.60$0.01$0.01$0.01$77.00$0.01
22Salvaged topsoil (625.0500)SY395$3.50$3.50$3.50$4.70$3.50
23Silt fence (628.1504)LF80$2.50$2.50$3.40$3.40$2.50
24Silt fence maintenance (628.1520)LF124$0.01$0.01$0.01$0.01$0.01
25Mobilizations erosion control (628.1905)EACH5$350.00$350.00$550.00$550.00$350.00
26Mobilizations emergency erosion control (628.1910)EACH3$50.00$50.00$100.00$100.00$50.00
27Erosion mat urban class I type B (628.2008)SY395$2.50$2.50$2.45$2.45$2.50
28Turbidity barriers (628.6005)SY235$40.00$40.00$43.00$43.00$40.00
29Temporary ditch checks (628.7504)LF35$9.00$9.00$8.95$8.95$9.00
30Fertilizer type B (629.0210)CWT0.50$200.00$200.00$100.00$100.00$200.00
31Seeding mixture no. 30 (630.0130)LB35$8.50$8.50$8.80$8.80$8.50
32Seeding temporary (630.0200)LB20$2.00$2.00$3.55$3.55$2.00
33Seed water (630.0500)MGAL16$60.00$60.00$25.00$25.00$60.00
34Markers row (633.5100)EACH8$75.00$75.00$69.00$69.00$75.00
35Posts wood 4X6-inch X 12-FT (634.0612)EACH4$85.00$85.00$85.00$85.00$85.00
36Signs type II reflective F (637.2230)SF12$20.00$20.00$25.00$25.00$20.00
37Removing signs type II (638.2602)EACH4$40.00$40.00$20.00$20.00$40.00
38Removing small sign supports (638.3000)EACH4$40.00$40.00$20.00$20.00$40.00
39Field office type B (642.5001)EACH1$1,500.00$2,529.04$3,500.00$5,595.00$3,000.00
40Traffic control barricades type III (643.0420)DAY1,200$1.00$1.00$1.00$1.00$1.00
41Traffic control warning lights type A (643.0705)DAY2,400$0.25$0.25$0.25$0.25$0.25
42Traffic control signs (643.0900)DAY1,200$1.00$1.00$1.00$1.00$1.00
43Traffic control (643.5000)EACH1$1,000.00$1,950.00$1,000.00$1,000.00$1,000.00
44Geotextile type DF schedule A (645.0111)SY62$8.00$5.14$8.00$1.25$8.00
45Geotextile type HR (645.0120)SY232$6.00$5.53$6.00$3.75$6.00
46Construction staking subgrade (650.4500)LF100$0.01$0.01$0.01$0.01$0.01
47Construction staking base (650.5000)LF100$2.00$2.00$2.00$2.00$2.00
48Construction staking structure layout (structure) 01. B-56-0249 (650.6501)EACH1$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00
49Construction staking supplemental control (project) 01. 5853-00-73 (650.9911)EACH1$400.00$400.00$400.00$400.00$400.00
50Construction staking slope stakes (650.9920)LF100$2.00$2.00$2.00$2.00$2.00
51Sawing asphalt (690.0150)LF40$8.00$2.95$8.00$2.95$8.00
52Incentive strength concrete structures (715.0502)DOL792$1.00$1.00$1.00$1.00$1.00
53Installing and maintaining bird deterrent system (station) 01. sta. 12+50 (999.2000.S)EACH1$1.00$0.01$4,000.00$145.00$0.01
WisDOT contract 20251209009: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy